Laserfiche WebLink
Page of <br />SWRCB, January 2002 <br />1.0. SECONDARY <br />PIPE TESTING <br />Test Method Developed By: <br />❑ Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />X Other (Spec) <br />County Protocol <br />Test Method Used: <br />X Pressure <br />❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Marsh PO 140 <br />Equipment Resolution: .01 <br />Piping Run #Anti - <br />Piping Run #Bulk Oil <br />freeze from Bldg to Piping Run # Piping Run # <br />from Bldg #o Trans <br />Trans <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />Length of Piping Run: <br />100, <br />100, <br />Product Stored: <br />Bulk Oil <br />Antifreeze <br />Method and location of <br />3 x 2 in sump <br />3 x 2 in sump <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />15 Minutes <br />15 Minutes <br />starting test: <br />Test Start Time: <br />11:00 <br />11:00 <br />Initial Reading (R,): <br />5.0 <br />5.0 <br />Test End Time: <br />12:00 <br />12:00 <br />Final Reading (RF): <br />5.0 <br />5.0 <br />Test Duration: <br />1 Hour <br />1 Hour <br />Change in Reading (RF-Ri): <br />0.00 <br />0.00 <br />Pass/Fail Threshold or <br />.002 <br />.002 <br />Criteria: <br />Test Result: <br />x Pass ❑ Fail <br />X Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br />Comments — (include in ormation on re airs made prior to testing, and recommended allow -u for failed tests) <br />