Laserfiche WebLink
• <br />SWRCB, January 2002 <br />11. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer ❑ Industry Standard <br />x Other (Spec) County Protocol <br />Test Method Used: ❑ Pressure ❑ Vacuum <br />❑ Other (Specify) <br />Page of <br />❑ Professional Engineer <br />x Hydrostatic <br />Test Equipment Used: ]ncon STS <br />Equipment Resolution: <br />.002 <br />„ ,..- .. i., M.., a <br />Sum #T-1 Sum #T-2 <br />Sump #T-3 <br />Sump #T-4* <br />Sump Diameter: 42" 42" <br />42" <br />42" <br />Sump Depth: 72"f 39 72"139 <br />72.5" <br />39" <br />Sump Material: Fiberglass Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of 17" / 17" 14" <br />14.5" <br />13" <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />15" / 15" <br />10" <br />16.5" <br />11" <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Good <br />Good <br />Good <br />Good <br />Portion of Sump Tested' <br />2" over piping <br />2" over piping <br />2" over piping <br />2" over piping <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />x Yes [-]No 11NA <br />X Yes 11No LiNA <br />X Yes LlNo 17NA <br />❑ Yes ❑ No x NA <br />product and water)?. <br />Turbine shutdown response time <br />15 seconds <br />18 seconds <br />8 seconds <br />Is system programmed for fail-safe <br />X Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />❑ Yes ❑ No x NA <br />shutdown?* <br />Was fail-safe verified to be <br />X yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />❑ Yes ❑ No x NA <br />operational?* <br />Wait time between applying <br />pressure/vacuum/water and starting <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />test: <br />Test Start Time: <br />11:00 / 11:27 <br />11:10 / 11:27 <br />12:36 / 12:54 <br />3:51 / 4:08 <br />Initial Reading (Rj): <br />4.865114.8649 <br />5.6917 15.6916 <br />3.7514 / 3.7512 <br />3.7622 / 3.7625 <br />Test End Time: <br />11:25 /11-42 <br />11:25 / 11:42 <br />12:51 / 1:10 <br />4:0614:23 <br />Final Reading (RF): <br />4.8651 / 4.8660 <br />5.6917 5.6921 <br />3.7513 f 3.7510 <br />3.7625 / 3.7625 <br />Test Duration: <br />15 min / 15 min <br />15 min / 15 min <br />15 min 115 min <br />15 min / 15 min <br />Change in Reading (RF -R,): <br />.0000 /.0011 <br />.00001.0005 <br />.0001 /.0002 <br />.00031.0000 <br />Pass/Fail Threshold or Criteria: <br />.002 <br />.002 <br />.002 <br />.002 <br />Test Result: <br />X Pass ❑ Fail <br />x Pass ❑ Fail <br />X Pass ❑ Fail <br />x Pass ❑ Fail <br />Was sensor removed for testing? <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes is No ❑ NA <br />Was sensor properly replaced and <br />X Yes ❑ No ❑ NA <br />X Yes []No DNA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />verified functional after testin ? <br />Comments —(include information on repairs made prior to testing, and recommended follow-uP for failed tests) <br />Transition Sum * T-4 ClrnvitvFeed <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to AqX of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />