Laserfiche WebLink
SWRCB. January 2002 <br />5. SECONDARY PIPE TESTING <br />Page 3 at <br />Test method Developed By Piping Manufacturer Industry Standard Professional <br />Engineer I Other (Specify) <br />iTest Method Used: Pr sure Vacuum Hydrostatic <br />r t ) Other (Specj(y) <br />Test Equipment Used: Presgure Gauge tut mint KCS0111DOM, 1j.,zU <br />p <br />u;p <br />% <br />Piping Ran # ri ing Run# Piping Run 9 1 <br />Piping Run <br />Piping Run <br />Pi in Material: <br />Pa in Manufacturer: <br />Piping Diameter. <br />Lett gffiofPipingRun: <br />Product Stored: <br />Method and location of <br />pipmg-nw isolation., <br />Wait time between applying <br />pressure/vacuum/water and <br />staxtinE test; <br />Test Start Time: <br />initial Reading (RI) <br />Test End Time: <br />Final Reading <br />Test Duration: <br />Changj in Reading.(Rf-R!)_ <br />Pass/Fail Threnhold. or <br />Criteria: <br />Test Result.- <br />[jPass. (I FRil <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />