My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3633
>
2300 - Underground Storage Tank Program
>
PR0232461
>
COMPLIANCE INFO 2007 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:11 PM
Creation date
11/4/2018 3:46:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2010
RECORD_ID
PR0232461
PE
2361
FACILITY_ID
FA0003758
FACILITY_NAME
RYDER TRUCK RENTAL #1071
STREET_NUMBER
3633
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17331001
CURRENT_STATUS
01
SITE_LOCATION
3633 DUCK CREEK DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DUCK CREEK\3633\PR0232461\COMPLIANCE INFO 2007 - 2010.PDF
QuestysFileName
COMPLIANCE INFO 2007 - 2010
QuestysRecordDate
4/25/2018 11:45:33 PM
QuestysRecordID
3869854
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Test Method Developed 13y: <br />Engineer <br />"est Method Used. <br />'fest Equipment Used: CALDWE <br />Page 4 of 7 <br />6. PIPING SUMP TESTING <br />[ ] Sump Manufacturer [ ] Industry Standard ( Professiona! <br />C 1 other (Specify) <br />{ j Pressure [ ] Vacuum IX I Hydrostatic <br />r lOther eco) _._... <br />CSL GAUGE Equipment Resolution: 0.0025 <br />_1 <br />Comments — (include information on repairs maue prior to WzAulb, +inti ,aUVLLL11LW11UWU LUIIVr-UN •�..a..�� wW, <br />I If the entire depth of the Sump 19 not tested, specify how much was tested. if the answer to at1.y of the questions indicatcd wide an asterisk (') is "NO" or <br />"NA", the entire sump must be tested. (SWRCB LG -ISO) <br />Turbine Sump # <br />1rurbint Suinp IF <br />1 ransitian oum R <br />s ransiuun ;3umE r, <br />StIrno Diameter. <br />Sump De da: <br />Sump Material; <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing; <br />Portion of Sum2 TestedI <br />Does turbine shut down when sump <br />[ ] S <br />NO <br />[ ] Y5 [ ] N <br />[ ] YES[ ] NO <br />[ ] YES [ <br />] NO <br />sensor detects tiquld (both product do <br />{ ] <br />[ ] N <br />[ ] 14A <br />[ )NA <br />wmci ? <br />Turbine shutdown re, onse time: <br />Is system programmed for fail-safe <br />[ ] <br />] NO <br />[ ] [ ] NO <br />[ ]YES [ ] NO <br />[ ]YES[ <br />] NO <br />Shutdown? <br />( INA <br />[ ] NAI <br />INA <br />[ INA <br />Was fafl-safe verified to be <br />[ J YES <br />J ND <br />( j Y[ ] No <br />C J YI~5 [ J NO <br />[ ] YES [ <br />J NO <br />operational? <br />( ] NA <br />NA <br />[ INA <br />(] NA <br />Wait time between applying <br />pressurclVacuuttVwsu:r Bind starting <br />test: <br />Test Start Time: <br />_— <br />initial Reading (Rl <br />Test End Time: <br />r-ina] Reading <br />Test Duration: <br />Chane in Reading -Rt <br />Pass/Fail Thttshold or Criteria: <br />Test Result: <br />[ ] <br />''PASS F,AIL <br />J� J ,.PASS ' ]TAIL . <br />` [:' ] PASS [ FAIL <br />[ ] PASS( <br />] NO <br />Was sensor removed for testing? <br />[ ] YES <br />[ ] NO <br />if ] YES [ ] NO <br />[ j YES [ ] NO <br />[ J YES [ <br />)NO <br />NA <br />I INA <br />r INA <br />JNA <br />Was sensor properly replaced and <br />(1 YES <br />[ )NO <br />C J YES [ ] NO <br />[ ] YES [ ] NO <br />[ ]YES( <br />] NO <br />verified functional atter testing? <br />[ ] NBA <br />[ IN A <br />[ ] N/A <br />[ JNA <br />Comments — (include information on repairs maue prior to WzAulb, +inti ,aUVLLL11LW11UWU LUIIVr-UN •�..a..�� wW, <br />I If the entire depth of the Sump 19 not tested, specify how much was tested. if the answer to at1.y of the questions indicatcd wide an asterisk (') is "NO" or <br />"NA", the entire sump must be tested. (SWRCB LG -ISO) <br />
The URL can be used to link to this page
Your browser does not support the video tag.