Laserfiche WebLink
From; 0 01/2009 17:06 #346 P.005/011 <br />U N T R P C r A R 5 <br />A,LC <br />U <br />?� cr�i or es. Inc <br />SECONDARY PTPF TF.ST1Nt'; <br />Page 4 <br />Test Method Developed By: <br />7) Piping Manufacturer X Industry Standard <br />-1 Other (Speci) <br />F: Professional Engineer <br />Test Method Used: <br />X Pressure != Vacuum <br />Other (Specify) <br />[Hydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />Piping Materiai: <br />Run # Run # <br />Run # <br />Run ## <br />Run # <br />Piping Manufacturer: <br />Piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />V <br />Wait time between applying <br />pressurehracuunv`water and <br />startin y test: <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />Final Reading (RP): <br />Test Duration: <br />Change in Reading (RP --Rt): <br />Pass/Fail Threshold or <br />Criteria: <br />One Dour, no loss <br />Test Result: _ <br />❑ Pass El Fail <br />❑ Pass ❑ Fail <br />L7 Pass 0 Fail <br />O.;Pass ❑ Fail 17 Pass D Fail <br />Comments -- Onclude hijbi-ination. on i-epairs inade rior to testing, and recontmenke frrlloty-up-for,faded tests) <br />C:1Documents and Settingslt ilhLocal SMinkskTenrtsorary Internet Fites\OLK 1 \Ryder parildoc <br />