Laserfiche WebLink
From' 0 01/ 4009 17:06 #348 P.0061011 <br />O k T 11 a t i 0 ix S <br />lCShitltl{ <br />s3sa57Sr}�61C �ar:?x <br />6. PIPING SUMP TESTING <br />Test Method Developed By: <br />'.�l Sutnp Manufacturer <br />X Industry Standard iJ Professional Engineer <br />C Other (Speco) <br />Test Method Used: <br />us Pressure <br />-I Vacuum X Hydrostatic <br />0 Odrer (Specifi,) <br />Test Equipment Used: Ronan/Caldwell Hydrostatic Sump Tester Equipment Resolution: 0.0000" <br />Transition Sump <br />Sump Diameter: <br />36" <br />-._-- <br />Sump Depth: <br />Sump Material: <br />Fiberglass <br />Height from Tank Top to Top of 1 <br />—6„ <br />Hi hest Pi in Penetration: <br />Height from Tank Top to Lowest <br />—5"Electrical <br />Penetration: <br />Condition of sump prior to testing: <br />Clean <br />Portion of Sump Tested' <br />---10" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />= Yes 1-1NoxNA <br />� Yes '0 No DNA -1 Yes L No f s NA <br />D Yes '=0 No i 7 NA <br />product and water)?` <br />Turbine shutdown response time <br />rtla <br />Is system programmed for fail-safe <br />shutdown?* <br />rYes i7 No -' NA <br />C Yes 0 No 11 NA _-_'Yes L.1No i:l NA <br />! . Yes L -"-'.No :.'NA <br />Was fail-safe verified to be <br />operational?* <br />i": "' NA <br />x Yes' No <br />C1 Yes L No Ll NA Yes Na F -I NA <br />L: Yes -.',No i_ NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />Test Start Time: <br />2:00 ptn <br />Initial Reading (Ri): <br />Test End Time: <br />2:30 pm <br />Final Reading (RI-): <br />Test Duration: <br />30 min <br />Change in Reading (RF-Rl): <br />Pass/Fail Threshold or Criteria: <br />PASS = No Loss or Loss of 0.0020" or less in 30 minutes <br />Test Result: <br />x Pass 0 Fail <br />0 Pass 0 Fail <br />0 Pass 0 Fail <br />❑ )pass 0 Fail <br />Was sensor reoved for testing? <br />m <br />x Yes C' No -.INA <br />� Yes O No L NA <br />-D Yes - No NA <br />.Yes L No NA <br />Was sensor properly replaced and <br />x Yes '7 No -1 NA <br />R NA <br />' 1 Ye;a .. No L. <br />N ' -1 N <br />� Yes - o A <br />C Yes tJNo NA <br />verified functional after testing'? <br />Comments — (include information on repairs made prior to testing, and recoiniiien(led olloia=-up.for_failed tests) <br />Note: Repairs made to penetration fittings to: Oil / Air Secondary (transition sump to building) <br />Antifreeze 1 Air transition sump to reel <br />Grease transition sump to reel <br />' if the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NOS' or "NA", the entire sump trust be tested. (See SWRCB LG -l60) <br />CADocuinents and Settingslbil]`+Local Set ing,\Temporary ]ntemet FileslOLKt\Ryder part1doc <br />