My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2749
>
2300 - Underground Storage Tank Program
>
PR0232564
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2020 5:10:51 PM
Creation date
11/4/2018 4:07:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0232564
PE
2381
FACILITY_ID
FA0003908
FACILITY_NAME
DURANGO TIRE CO
STREET_NUMBER
2749
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17502403
CURRENT_STATUS
02
SITE_LOCATION
2749 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\2749\PR0232564\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NN.. 1�w <br /> 3. JOB HAZARD ANALYSIS <br /> Potential hazards fall into the following groupings: <br /> Hazards common to all heavy construction sites;Hazards related to the explosive nature of fuel tanks; <br /> Hazards due to chemicals and pollutants. <br /> Construction heavy equipment hazards will be minimized due to very few personnel being on the site, <br /> thereby minimizing the risk of unplanned equipment/human contact. Equipment stability(roll over)is <br /> not an issue with the size of backhoe(PH. GRADEALL)Mr. Willis plans on using. The long reach of <br /> this hoe will allow him to stay far away from the edge of the piping excavation. Said backhoe is of the <br /> "track"type which adds further to stability and maneuverability. Underground Service Alert(USA)will <br /> be notified prior to excavation and therefor all pertinent utility lines will be identified. Mr. Willis will not <br /> dig close to any live electrical or fuel lines. Proper clothing,including a hard hat,will be worn at all <br /> appropriate times. <br /> Empty fuel tanks can pose a fire or explosive hazard. To mitigate such hazard,the tank shall be rendered <br /> inert through the displacement of combustibles with carbon dioxide. The displacing gas will be <br /> introduced by inserting dry ice,preferably in pellet form,into the tank through the fill tube. A gas meter <br /> will be used to monitor the L.E.L.before and during their"icing". Handling of the tank shall not proceed <br /> until the combustibles have been reduced to a safe level. <br /> Chemical and pollutant hazards are not anticipated. Personnel might come in contact with diesel product. <br /> While contact should be avoided,thorough washing of the skin should mitigate any negative effects. <br /> There is a probability that contact will be made with the outside asphalt coating of the tank, if it exists. <br /> Said contact should be benign and can be mitigated by washing of the skin. If any unforeseen chemicals <br /> are discovered,the job will be stopped until said chemicals are dealt with and a plan developed for its <br /> avoidance or removal. <br /> 4. JOB HAZARD SUMMARY <br /> Avoid construction hazards by limiting unauthorized/untrained people on the job site. Use conservative <br /> techniques during the excavation and removal process. Personnel are to wear proper clothing for the task. <br /> Monitor the levels of hydrocarbons throughout the operation. Displace the combustibles by inserting dry <br /> ice through the filler tube of the tank. No work shall be done until safety has been established as shown <br /> by a gas meter. <br /> Expcted chemical exposure(asphalt&diesel)contact is to be avoided. If skin contact is established <br /> proper washing with soap and water should ensue. If unexpected chemicals are discovered, they are to be <br /> avoided. If unavoidable,all work should stop and the job site should be secured until a contingency plan <br /> is developed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.