Laserfiche WebLink
PC0U8QQ1QH SERMI <br /> Q UMH EQUIPINL HU 0009 NCO <br /> CAL. LIC. 309105-A-C61/D40 HAZ <br /> 808 N. UNION ST. STOCKTON, CALIF. 95205 <br /> P.O. BOX 508 STOCKTON, CALIF. 95201 <br /> PHONE 209/464-8333 FAX 209/464-8349 <br /> TAX I.D. #94-1573741 <br /> SALES SERVICE INSTALLATION OF PETROLEUM DISPENSING LUBRICATION & INDUSTRIAL SERVICE EQUIPMENT <br /> SITE SAFETY PLAN <br /> September 8, 1999 <br /> Quick and Save <br /> 7200 S. E1 Dorado Street <br /> French Camp, CA 95231 <br /> For Tank Removal: one 12,000,one 8,000 and one 6,000 gallon UGST. <br /> The Project Manager and Health&Safety coordinator is: Mike Flores of Stockton Service <br /> Station Equipment Co. Inc., 808 N. Union Street, Stockton, CA 95205. Phone 209-464-8333. <br /> The Alternate Site Safety Officer is: Randy Chadwick or Mike Jones of Stockton Service <br /> Station Equipment Co. hic. <br /> Stockton Service Station Equipment Co. Inc.,will have on site two(2)fire extinguishers and one first aid <br /> kit within 50 feet of the tank area where flammable vapors are present. Stockton Service Station <br /> Equipment Co. Inc. shall notify the local fire department and U.S.A.dig 48 hours before excavation shall <br /> begin. The tanks will be emptied of product before start of job. The tanks will be triple rinsed and dry iced <br /> (30 lbs.Per 1000 gallons)before lifting tanks. Stockton Service Station Equipment Co. Inc.shall monitor <br /> Links with a Low Explosion Level(LEL)meter. <br /> We will seal all openings and one plug will have 1/8"openings,before tanks will be transported,along with <br /> piping. At no time will Stockton Service Station Equipment Co. Inc.cut or weld on site. <br /> The tanks will be secured on truck after excavation for transportation,tanks and plumbing will be hauled <br /> away by Cal-Coast Equipment, 700 N.Walnut,Turlock,CA 95380,(209)668-9378. <br /> Stockton Service Station Equipment Co. Inc.will approach all excavations with possible cave-ins. The <br /> following rules will be followed to prevent any mishap. <br /> 1. Soil will be inspected for stability before and after removal. <br /> 2. Soil to be at least two(2)feet from edge of excavation. <br /> 3. If excavation is five(5)feet or more,the hole shall be tapered,braced or other equipment methods <br /> will be used to prevent possible cave-ins. Precautions will be implemented at all times. <br /> On the job site,clean fill will be used to backfill the empty hole,after soil samples have been taken by <br /> Advanced GeoEnvironmentai,Inc.,4005 N.Wilson Way, Stockton,CA 95205,(209)467-1006. <br /> Soil samples will be excavated using a backhoe. Samples will be taken two(2)feet to four(4)feet at the <br /> tank bottom by hand,using brass tubes. All of the above procedures will be according to code. Any part <br /> not backfilled,shall be barricaded and caution tape will be used <br />