My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
153
>
2300 - Underground Storage Tank Program
>
PR0231389
>
COMPLIANCE INFO 1998-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
11/4/2018 4:31:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2004
RECORD_ID
PR0231389
PE
2361
FACILITY_ID
FA0003709
FACILITY_NAME
VALERO #3698
STREET_NUMBER
153
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336607
CURRENT_STATUS
01
SITE_LOCATION
153 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\153\PR0231389\COMPLIANCE INFO 1998-2004.PDF
QuestysFileName
COMPLIANCE INFO 1998-2004
QuestysRecordDate
5/19/2017 4:43:15 PM
QuestysRecordID
3389407
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Uses: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Measuring Equipment Used for Testing: Liquid Filled Pressure Gauges <br /> Piping Run#1RU Slave Piping Run 92 RU Piping Run#3 SU <br /> Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: 12' 135' 145' <br /> Product Stored: RU RU SU <br /> Method and location of 3X2 BOOTS 3X2 BOOTS 3X2 BOOTS <br /> Piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and IOMIN 1 OMIN 1 OMIN <br /> starting test: <br /> Test Start Time: 1023 1035 0918 <br /> Initial Reading(R,): 5.0 PSI 5.0 PSI 5.0 PSI <br /> Test End Time: 1053 1105 0948 <br /> Final Reading(RF): 5.0 PSI 5.0 PSI 5.0 PSI <br /> Test Duration: 30MIN 30MIN 30MIN <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold: -.2 PSI -.2 PSI -.2 PSI <br /> Test Result: PASS PASS PASS <br /> Comments— (include information on repairs made prior to testing) <br /> Installed on SSI boot in # 1 and one SSI boot in #2 to test slave secondary pipine <br /> Run from turbine sump #2 to slave sump #1 <br /> SWRCB December 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.