Laserfiche WebLink
• • Page of <br /> 6. SUBMERSIBLE PUMP CONTAINMENT SUMP TESTING <br /> Test Method Developed By: X Sump Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Specie) <br /> Test Method Uses: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specie) <br /> Measuring Equipment Used for Testing: UST 2000P <br /> Sump 91RU SLAVE Sump#212U Sump#3 SU _ <br /> Sump Diameter: 42" 42" 42" <br /> Sump Depth: 39" 40" 39" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Highest 22„ 28" 18" <br /> Piping Penetration: <br /> Height from Tank Top to Lowest 16" 19" 29" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: FAIR FAIR FAIR <br /> Portion of Sump Tested' 2"ABOVE PRODUCT 29'ABOVE PRODUCT 2"ABOVE PRODUCT <br /> PENETRATION PENETRATION PENETRATION <br /> Wait time between applying 15MIN 15MIN 15MIN <br /> pressure/vacuum/water and starting test: <br /> Test Start Time: 0910 0823 0751 <br /> Initial Reading(Rt): .2850 .1023 .8971 <br /> Test End Time: 0922 0835 0803 <br /> Final Reading(RF): .2838 .1027 .8976 <br /> Test Duration: 12MIN 12MIN 12MIN <br /> Change in Reading(RF-Ri): -.0012 +.0004 +,0005 <br /> Pass/Fail Threshold: +/-,002" +/-.002" +/-,002" <br /> Test Result: PASS PASS PASS <br /> Was sensor removed for testing? YES YES YES <br /> Was sensor properly replaced after YES YES YES <br /> testin ? <br /> Comments— (include information on repairs made prior to testing) <br /> SWRCB December 2001 <br />