Laserfiche WebLink
l <br /> n <br /> SWRCB,January 2002 Page-V--of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ilIndustry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ,,Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> { _ ,, s <br /> Piping Run# r Piping Run# Piping Run# Piping Run # <br /> Piping Material: ev 0.S <br /> Piping Manufacturer: <br /> Piping Diameter: 3 <br /> Length of Piping Run: <br /> Product Stored: -Pre m i u t,,ti ac <br /> Method and location of �resvP T�- rt5u <br /> i in -run isolation: 1,7V r u flv .Sv Nr- -,A !nJ v <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: l _ <br /> Test Start Time: LIO (� <br /> Initial Reading (R,): ; <br /> Test End Time: I D L <br /> Final Reading(RF): j <br /> Test Duration: k I- <br /> Change in Reading(Rr-Rj): -- <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result OLPass El Fail ❑ Pass Fail /-Pass ©.Fail ❑ Pass C!Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) r <br /> I�.uJ� �tSy�f� "!`ci, l-e&LoL- At, Z- Cf-4UL 1 <br /> C-KEA E-X(er--L( �t�-(' i,J D3 - <br /> W Ck <br />