Laserfiche WebLink
SWRCB,January 2002 • Page_a of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Sump# �5 Sump# Sump# q Sump# <br /> Sump Diameter. I� c( « <br /> Sump Depth: 3Z" t N <br /> Sump Material: b P 4s eo CS <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: 1-71 <br /> 2 <br /> Height from Tank Top to Lowest j9 „ 2-Y <br /> f u -2-Y [ <br /> Electrical Penetration: <br /> Condition of sump prior to testing: ©( Cj' V-- ©v_ <br /> Portion of Sump Tested' (( Gt(( <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ?-Yes ❑No ❑NA KYes ❑No ❑NA l,Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> productand water)?` <br /> Turbine shutdown response time (o $—L 6-Se ` G S�C_ <br /> Is system programmed for fail-safe <br /> shutdown?` , Yes ❑No ❑NA QLj e ❑No 11O<r NA es ❑No 11NA ❑Yes ElNo 11NA <br /> Was fail-safe verified to be <br /> operational?' IdYes 11No 11NAes 11No ❑NAes 11No LlNA El Yes ElNo 11NA <br /> Wait time between applying <br /> pressure/vacuum/water and startinge <br /> test: 1 M 14 1 61 /n J (Yt(\/l <br /> Test Start Time: <br /> Initial Reading(RJ: ZO-4- S, 603t <br /> Test End Time: /( f7p /2-15 12S�p <br /> Final Reading(RF): v aq,7-LI dS002.2r <br /> Test Duration: I Srrl S S <br /> Change in Reading(RF-Rt): f$ ,bolt( f 0-00,03 -0,00<3 <br /> Pass/Fail Tbreshold or Criteria: It , (30Z.- _ fl, 0 z Z ± O_l'ass ❑ 14 Ott- <br /> Test <br /> C'(._ <br /> Test Result: fjFail Pass C7 Fail 'Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? &Yes ❑No ❑NA 6Yes ❑No ❑NA 0-Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and ,rYes ❑No ❑NA WYes ❑No ❑NA i(Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after t€stin ? <br /> Comments -(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> 1 If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk (')is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />