My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18662
>
2300 - Underground Storage Tank Program
>
PR0505356
>
COMPLIANCE INFO_2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:32 AM
Creation date
11/4/2018 5:30:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2015
RECORD_ID
PR0505356
PE
2361
FACILITY_ID
FA0006733
FACILITY_NAME
GEORGES BP MINI MART
STREET_NUMBER
18662
Direction
N
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
18662 N HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\18662\PR0505356\COMPLIANCE INFO 2010 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2010 - 2015
QuestysRecordDate
2/1/2018 7:40:19 PM
QuestysRecordID
3779163
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of� <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer Industry Standard Professional Engineer <br /> 1 Other(Spec) <br /> Test Method Used: X Pressure Vacuum _i Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run# 1 Piping Run#2 Pipirng Run #3 Piping Run # <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 3" 3" 39+ 3a, <br /> Length of Piping Run: Approx. 145' Approx. 145' Approx.160' Approx.90' <br /> Product Stored: Regular 87 Plus 89 Super 91 Diesel <br /> Method and location of Test boot at STP#1 Test boot at STP#2 Test boot at STP#3 Test boot at STP#4 <br /> piping-run isolation: <br /> Wait time between applying 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> pressure and startin test: <br /> Test Start Time: 10:50 10:55 11:05 11:15 <br /> Initial Reading(Rj): 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time: 11:50 11:55 12:05 12:15 <br /> Final Reading(RF): 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test Duration: 1 Hour 1 Hour l Hour 1 Hour <br /> Change in Reading(RF-Rj): 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or <br /> Criteria: No Loss in Psi No Loss in Psi No boss in Psi No Loss in Psi <br /> C <br /> Test Result: X Pass ❑Fail X Pass D Fail X Pass D Fail X Pass 0 Fail <br /> _Comments— (include information on repairs made prior to testing, and recommended follow-y for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.