Laserfiche WebLink
r./ <br /> OIL EQUIPMENT SERVICE <br /> STATE LICENSE No.327417 <br /> Division Of Keith A. Tallia, Inc. CLASSIFICATION: A-HAZ.,C61D40 <br /> STATE ENVIRONMENTAL ASSESSOR No.01781 <br /> Telephone: (209)7541808 <br /> Fax: (209)7545726 <br /> Post Office Box 950 <br /> 750 lndWtrial Way <br /> SAN ANOREAS.CALIFORNIA 95249 <br /> HEALTH AND SAFETY PLAN <br /> The site location for the proposed job of removing 1 each 1 , 000 <br /> gallon underground storage tank and relatedp 'i <br /> ping: <br /> Site: Stockton Metro Transit Dist. <br /> 730 E Channel St. . <br /> Stockton, CA <br /> The project manager, and the health and safety coordinator is Keith A. <br /> Tallia of Oil Equipment Service. The site safety officers at the job <br /> site will be Keith A. Tallia of Oil Equipment Service. The alternate <br /> site safety officer will be Anthonv of Oil Equipment Service. <br /> Ferrucci <br /> Oil Equipment Service will have on site two ( 2 ) fire extinguishers and <br /> one ( 1 ) first-aid kit within 50 ' of the tank or areas where flammable <br /> vapors are present. <br /> Oil Equipment Se`Pvice shall notify the local fire department 48 hours <br /> before excavation shall begin. USA will also be notified before excavation <br /> of job. <br /> Tank must be empty of product before start of job. Oil Equipment Service <br /> will triple rinse tank with water. Rinse will be hauled away by Nor-Cal <br /> Oil Co. , hazardous hauler. Tank will be dry iced, 15-30 pounds of dry <br /> ice per 1 , 000 gallons, before excavating. oil Equipment Service shall <br /> monitor tank with a Combustible Gas Indicator (CGI) and seal all openings <br /> before tank will be transported. At no time will anyone cut or weld the <br /> tank. Tank will be secured on truck after extraction for transportation. <br /> Tank and plumbing will be hauled by West Coast Equipment <br /> to be properly disposed of via destruction. <br /> Oil Equipment Service will approach all tank extractions with possible <br /> cave-ins. The following rules will be followed to prevent any mishaps: <br /> 1 ) soil to be inspected for stability before and after tank is removed, <br /> 2 ) soil is to be kept at least two (2 ) feet from edge of an excavation, <br /> 3 ) if excavation is five ( 5 ) feet or more, the hole shall be tapered, <br /> braced, or other equivalent methods shall be used to prevent possible <br /> cave-ins. Precautions will be taken at all times . <br />