My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT
>
145
>
2300 - Underground Storage Tank Program
>
PR0504311
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2019 2:22:12 PM
Creation date
11/5/2018 8:51:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0504311
PE
2381
FACILITY_ID
FA0006161
FACILITY_NAME
MORADA SHOPPING CENTER
STREET_NUMBER
145
Direction
N
STREET_NAME
GRANT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
145 N GRANT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT\145\PR0504311\REMOVAL 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%.o <br /> I <br /> HEALTH and SAFETY PLAN <br /> Page 2 <br /> At the job site, clean fill will be used to backfill the empty hole after <br /> soil samples have been taken by Condor Earth Technologies Inc. <br /> Soil samples will be excavated using backhoe. Samples will be taken two <br /> ( 2 ) feet to four ( 4 ) feet by hand using brass tubes . All of the above <br /> procedures will be done according to code. Any part not backfilled shall <br /> be barricaded with construction barricades and caution tape will be used. <br /> Oil Equipment Service will use equipment for each tank removal . No <br /> undersize or bad mechanical equipment will be used. All heavy equipment <br /> will be supported properly. Tanks are to be secured at the assigned <br /> location after extraction. <br /> Oil Equipment Service will provide safety hats, goggles, and clothing <br /> to employees at the job site as per OSHA regulation 29 CFR 1910. 120. <br /> Caution will be noted that a heat stress situation may develop when <br /> impermeable protective clothing is worn. <br /> Oil Equipment Service will hold shop meetings before start of tank removals <br /> to discuss safety procedures . The "buddy system" will be discussed and <br /> the course of action to be taken should an injury occur to an employee. <br /> Some of the many rules to be discussed to help prevent injury or accident <br /> are: 1 ) avoid standing on top of tank - - surface .maybe slippery or rusty, <br /> 2 ) check for falling objects, slipping, and tripping hazards, 3 ) visqueen <br /> sheeting will be used if necessary around excavated soil, 4) here <br /> necessary, the site will be secured with construction barricades and <br /> warning signs posted to prevent the exposure of unauthorized, unprotected <br /> people to site hazards 5 ) limit exposure time to noisy equipment, 6 ) keep <br /> a safe distance from the excavation and heavy equipment, 7) stay up-wind <br /> from the tank and/or excavation to avoid unnecessary exposure whenever <br /> possible, S ) limit exposure by minimizing the exposure time and maximizing <br /> the distance to the source of vapor release, 9 ) avoid the area or take <br /> special caution when ventilating the tank with water, dry ice or air, <br /> 10) do not enter the excavation without first monitoring the air. <br /> Oil Equipment Service shall provide San Joaquin <br /> County a map of the nearest hospital and route to be taken should an injury <br /> occur. A copy of the map will also be on the job site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.