PERFORMANCE 'SPECIFICATION <br />SECTION I GENERAL CONDITIONS SECTION I GENERAL CONDITIONS CONTINUED - SECTION I GENERAL CONDITIONS - CONTINUED <br />PART 1 - GENERAL PART 4 RESPONSIBILITY OF THE CONTRACTOR - CONTINUED PART 7 -- COMPLETION OF CONTRACT - CONTINUED <br />C <br />ADHERE TO ALL REQUIREMENTS OF 7. IX R" C' <br />SHALL BE REQUIRED TO D Q 2.2 F ED PARTS OR MEMBERS SHALL BE SECURED TIGHT IN PLA FR F <br />1 .1 SCOPE OF WORK: THE WORK INCLUDED IN THE CONTRACT FOR THIS PROJECT 4.7 INSPECTION. CONTRACTORCE, EE FROM <br />CONSISTS OF THE FURNISHING OF ALL LABOR, MATERIALS, SERVICES, EQUIPMENT AND OWNER'S INSPECTION PROGRAM. CONTRACTOR SHALL COMPLY WITH REQUIREMENTS FOR DISTORTIONS. <br />APPLIANCES REQUIRED IN CONJUNCTION WITH OR PROPERLY INCIDENTAL TO THE COMPLETE NOTIFICATION, SITE PREPARATION REQUIREMENTS,; COMPLIANCE, ON-SITE PRESENCE DURING 7,2.3 FINISHES SHALL BE FREE FROM BUBBLES, STREAKS, PEELING, PITS OR OTHER <br />CONSTRUCTION OF A GASOLINE INSTALLATION FOR THE SOUTHLAND CORPORATION. INSPECTION AND CORRECTION OF ANY DEFECTS OR RELATED PROBLEMS AS DIRECTED BY r <br />INSPECTING REPREDENTIVE. CONTRACTOR SHALL PROVIDE NO LESS THAN, 48 HOURS NOTICE S IRREGULARITIES, ISHA EXCEPT WHERE ROUGH MATERIALS MAY BE REQUIRED. FINISH <br />PART 2 AGREEMENT PRIOR' TO INSPECTION.SURFACES SHALL BE FREE FROM DIRT, GREASE, MASTICS, FINGERPRINTS, SCRATCHES, <br />2.1 CONTRACTOR FORM SHALL BE SOUTHLAND CORPORATION "CONSTRUCTION AGREEMENT" DENTS, CRACKS, STAINS, CHIPS OR OTHER DAMAGING EFFECTS. <br />#4400157 DATED 11/88 AND RELATED INSURANCE SPECIFICATION. A COPY OF THIS CON- 4.8 COORDINATION: GASOLINE- CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING ALL PHASES 7.3 CLEANING: <br />TRACT IS AVAILABLE THROUGH LOCAL CONSTRUCTION OFFICE OR SITE MANAGER FOR REVIEW. OF THE GASOLINE <br />IN <br />WITH THE GENERAL ,CONTRACTOR IN CHARGE OF THE 7.3.1 ALL WORK SHALL BE CLEAN AND READY FOR USE UPON COMPLETION. REMOVE <br />BUILDING OR MAJOR PORTION OF THE PROJECT. THE BUILDING GENERAL CONTRACTOR AND TEMPORARY TAPES, WRAPPING, COATING, PAPER LABELS AND OTHER ITEMS. <br />2.2 PAGE 3 -- ARTICLE II - OWNER: WHENEVER THE WORD "OWNER" APPEARS IN THE THE GASOLINE CONTRACTOR SHALL JOINTLY DEVELOP A MUTUALLY AGREEABLE SCHEDULE 7,3.2 CLEANING METHODS FOR PROPIETARY MATERIALS SHALL BE IN STRICT ACCORDANCE <br />CONTRACT DOCUMENTS, DRAWINGS AND SPECIFICATIONS, IT SHALL BE DEEMED TO [READ: AND TIMETABLE FOR COMPLETION ON THE GASOLINE INSTALLATION. TIMETABLE FOR BUILDING WITH MANUFACTURER'S INSTRUCTIONS. CLEANING SOLUTIONS, AGENTS, SOLVENTS, WAXES <br />THE SOUTHLAND CORPORATION." AND GASOLINE SHALL COINCIDE AND COMPLIMENT EACH OTHER, SO THAT ONE DOES NOT <br />2.3 PAGE .3 -- ARTICLE III - CONTRACTOR: WHENEVER THE WORD "CONTRACTOR" APPEARS DELAY THE OTHER. OR OTHER MATERIALS SHALL BE ONLY AS APPROVED BY THE MANUFACTURER OF THE <br />IN THE CONTRACT DOCUMENTS, DRAWINGS AND SPECIFICATIONS, TT SHALL BE DEEMED TO MATERIAL INSTALLED IN THE WORK. <br />READ "GENERAL GASOLINE INSTALLATION CONTRACTOR." r 7.3..3 CLEAN-UP: CONTRACTOR SHALL CLEAN UP ALL DEBRIS CAUSED BY THE WORK OF <br />SHOULD GASOLINE CONTRACTOR FAIL TO MEET DEADLINES AS ESTABLISHED BY THE THIS SECTION, KEEPING THE PREMISES NEAT AT ALL TIMES. <br />PART 3 - INTENT OF DRAWING AND SPECIFICATIONS SCHEDULE AND/OR HOLD UP THE COMPLETION OF THE OVERALL BUILDING PROJECT, <br />.3.1 THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO PRESCRIBE A COMPLETE SOUTHLAND CORPORATION RESERVES THE RIGHT TO RECTIFY THE SITUATION ACCORDINGLY. PART 8 - CODES <br />WORK OR IMPROVEMENT WHICH THE CONTRACTOR UNDERTAKES TO DO IN FULL COMPLIANCE 4.9 CONTRACTOR SHALL PROVIDE OWNER WRITTEN CERTIFICATION AS TO THE FOLLOWING: 8.1 THE FOLLOWING CODES ARE MADE A PART OF THIS SPECIFICATION. SAID CODES SHALL <br />THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL DO ALL WORK AS MAY BE 4.9.1 CERTIFICATION FROM LOCAL STATE GOVERNING AUTHORITIES, AS APPLICABLE FOR DICTATE MINIMAL ACCEPTABLE STANDARDS. CODE SHALL BE ADHERED TO UNLESS LOCAL <br />WITH / GOVERNING AUTHORITIES DICTATE HIGHER OR MORE STRINGENT REQUIREMENTS WHICH <br />NECESSARY TO COMPLETE "THE WORK IN A SATISFACTORY AND ACCEPTABLE MANNER, <br />CONTRACTOR CERTIFICATION/LICENSING FOR INSTALLATION OF GASOLINE STORAGE SHALL TAKE PRECEDENCE: <br />3.2 THE CONTRACTOR SHALL, UPON DISCOVERY, REPORT ANY DISCREPANCIES IN THE TANK SYSTEM. <br />DRAWINGS AND SPECIFICATIONS TO THE OWNER'S CONSTRUCTION MANAGER. 8, 1 . 1 NEPA FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE <br />4.9:2 CERTIFICATION FROM EQUIPMENT MANUFACTURES AND SUPPLIERS (TANKS, 8.1.2 PEI MANUAL "RECOMMENDED PRACTICES FOR INSTALLATION OF UNDERGROUND <br />3.3 THE DRAWINGS AND SPECIFICATINS ARE INTENDED TO BE COMPLIMENTARY. ANYTHING PRODUCT LINES, GTM'S, ETC.) AS TO ATTENDING AND ACHIEVING CERTIFICATION LIQUID STORAGE SYSTEMS." #RP -100-87 (OR LATEST FDDITION) <br />MENTIONED IN THE SPECIFICATIONS AND NOT SHOWN ON THE DRWAINGS, OR SHOWN ON THE FROM APP.ROPRATEI COMPANY FOR INSTALLATION OF EQUIPMENT. PART g - WARRANTY GUARANTEE <br />DRAWINGS AND NOT MENTIONED IN THE SPECIFICATIONS, SHALL BE OF LIKE EFFECT AS IF 4.9.3CERTIFICATION ON APPROPRATE FORMAT AS TO INSTALLATION OF COMPLETE <br />SHOWN OR MENTIONED IN BOTH. GENERALLY, THE SPECIFICATIONS DESCRIBE WORK WHICH SYSTEM BEING PERFORMED IN COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL 9.1 EXCEPT WHERE SPECIAL GUARANTEES ARE REQUIRED IN EXCESS OF ONE (1) YEAR, THE <br />CANNOT BE READILY IDENTIFIED ON THE DRAWINGS AND INDICATED TYPES, QUALITIES AND LAWS AND REGULATIONS, CONTRACTOR AGREES TO REPAIR OR REPLACE ANY DEFECT IN MATERIAL OR WORKMANSHIP <br />METHODS OF INSTALLATION OF THE VARIOUS MATERIALS AND EQUIPMENT REQUIRED FOR 4.9.4 CERTIFICATION THAT ALL EQUIPMENT EITHER SUPPLIED BY OWNER OR CONTRACTOR (BEYOND ORDINARY WEAR AND TEAR) TO THE SATISFACTION OF THE OWNER'S CONSTRUCTION <br />THE WORK. IT IS NOT INTENDED TO MENTION EVERY ITEM OF WORK IN THE SPECIFICATIONS HAS BEEN INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS BY PERSONNEL MANAGER FOR A PERIOD OF ONE (1) YEAR AFTER DATE OF ACCEPTANCE, WHETHER IN HIS <br />WHICH CAN BE ADEQUATELY SHOWN ON THE DRAWINGS NOR TO SHOW ON THE DRAWINGS TRAINED AND QUALIFIED FOR THAT SPECIFIC ITEM. WORK OR IN THAT OF SUBCONTRACTOR'S, WITHOUT COST TO THE OWNER. <br />ALL ITEMS OF WORK DESCRIBED OR REQUIRED BY THE SPECIFICATIONS EVEN IF THEY ARE PAR( IO - AS BUILT PLAN AND DOCUMENTATION <br />OF SUCH NATURE THAT THEY COULD HAVE BEEN SHOWN THEREON. 4.10PAYMENT SHALL BE MADE PER ARTICLE 1113.2 OF THE CONTRACT. <br />4.1 ]LIENS: CONTRACTOR SHALL PERMIT NO LIENS OF ANY KIND TO BE FIXED UPON OR 10.1 UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE "AS -BUILT SITE PLAN" <br />AGAINST THE PROPERTY BY ITS LABORERS, MECHANICS OR MATERIALMEN, AND SHALL VERIFYONG FINAL LOCATION OF IMPROVEMENTS INCLUDING, BUT NOT LIMITED TO, <br />ALL MATERIALS OR LABOR FOR WORK WHICH IS SHOWN ON THE DRAWINGS OR IS INDEMNIFY, PROTECT AND SAVE OWNER HARMLESS FROM AND AGAINST ALL SUCH PLUMBING AND ELECTRICAL. <br />REASONABLY INFERABLE AS BEING NECESSARY TO PRODUCE A FINISHED JOB SHALL BE CLAIMS AND LIENS.10.2 CONTRACTOR SHALL KEEP PHOTOGRAPHIC JOURNAL OF ALL PHASES OF THE COMPLETE <br />PROVIDED BY THE CONTRACTOR WHETHER OR NOT THE WORK IS EXPRESSLY COVERED IN 4 12EQUIPMENT RESPONSIBILITY: CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING, INSTALLATION. PHOTOGRAPHS ARE TO BE PROPERLY DATED, IDENTIFIED AND FOWARDED <br />THE SPECIFICATIONS. TO LOCAL CONSTRUCTION OFFICE. <br />3.4 THE CONTRACTOR, SUBCONTRACTORS AND ALL TRADES SHALL EXAMINE THE SITE AND, RECEIVING, UNLOADING, HANDLING AND PROVIDING PROTECTED INSIDE STORAGE FOR .ALL <br />OWNER SUPPLIED EQUIPMENT AND MATERIAL. CONTRACTOR SHALL INSPECT EQUIPMENT UPON SECTION I I INSPECTIONS BESTING <br />ASCERTAIN EXISTING CONDITIONS PRIOR TO THE START OF THEIR PORTIONS OF THE WORK. RECEIPT AND IMMEDIATELY REPORT ANY DAMAGEE DUEDUE Tp+ SHIPPING i0 THE OWNER'S <br />BEFORE ORDERING MATERIALS OR DOING ANY WORK, THE CONTRACTOR SHALL VERIFY AND ' REPRESENTATIVE. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO FAILURE <br />DIFFERENCES WHICH MAY BE FOUND BETWEEN ACTUAL DIMENSIONS AND DIMENSIONS RESPONSIBLE FOR THE CORRECTNESS OF ALL MEASUREMENTS AT THE SITE. ANY TO COMPLY WITH THESE REQUIREMENTS. DISPENSERS SHALL BE PROTECTED WITH SHIPPING PARI- 1 - GENERAL <br />DOWNER'S BOXES UNTIL STORE IS TURNED OVER FOR OPENING. CONTRACTOR SHALL BE SOLELY <br />INDICATED ON THE DRAWINGS OR SHOP DRAWINGS SHALL BE SUBMITTED TO THEE ORESPONSIBLE FOR ADEQUATE AND LOCKED STORAGE OF OWNER'S MISCELLANEOUS 1.1 SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, SERVICES AND <br />CONSTRUCTION MANAGER FOR CONSIDERATION BEFORE PROCEEDING WITH THE ACTUAL EQUIPMENT AS REQUIRED TO PROVIDE INSPECTION SERVICES OF THE GAS INSTALLATION, <br />DIMENSIONS AND MEASUREMENTS INDICATED ON THE DRAWINGS UNLESS A SUBSTANTIAL ERROR EQUIPMENT, TO INCLUDE GASOLINE CONSOLE, PRIOR TO OPENING OF THE STORE' <br />HAS BEEN MADE. IF SUCH AN ERROR SHOULD OCCUR, IT SHALL BE BROUGHT TO THE 4.13GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FILING OF RECEIVING FORMS AND PART 2 - INSPECTIONS <br />ATTENTION OF THE OWNER'S CONSTRUCTION MANAGER AND RESOLVED BEFORE PROCEEDING MISCELLANEOUS CONFIRMATION OF EQUIPMENT ,RECEIVING INFORMATION AS REQUIRED BY 2.1 INSPECTOR: INSPECTIONS / TESTS SHALL BE PERFORMED BY SOUTHLAND LOCAL <br />WITH WORK. LOCAL CONSTRUCTION OFFICE. CONSTRUCTION DEPARTMENT AND/OR APPOINTED REPRESENTATIVE. <br />3.5 THE ORGANIZATION OF SPECIFICATIONS INTO.DIVISIONS, SECTIONS AND PARAGRAPHS, AND 4'.14GENERAL CONTRACTOR SHALL .PROVIDE ALL PLUMBING, WIRING, MATERIAL AND LABOR AS 2.2 NOTIFICATION: CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING SOUTHLAND'S <br />THE ARRANGEMENT OF THE DRAWINGS ARE NOT INTENDED TO CONTROL THE CONTRACTOR REQUIRED TO INSTALL OWNER SUPPLIED EQUIPMENT, INCLUDE. MONIES IN BID PROPOSAL CONSTRUCTION DPARTMENT 48 HOURS PRIOR TO REQUESTED INSPECTION ' <br />IN DIVIDING THE WORK AMONG SUBCONTRACTORS OR IN THE ESTABLISHING THE EXTENT OF FOR INSTALLATION OF OWNER SUPPLIED EQUIPMENT UNLESS, NOTED OTHERWISE. 2.3 SPILLAGE: SHOULD SPILLAGE OF PRODUCT OCCUR AT ANY PHASE OF INSTALLATION OR <br />WORK TO BE PERFORMED BY ANY TRADE. PART 5 - PROTECTION TESTING, LOCAL SOUTHLAND CONSTRUCTION DEPARTMENT AND ENVIRONMENTAL DEPARTMENT <br />3 .T .6 DRAWINGS AND SPECIFICATIONS: DRAWINGS INDICATE GENERAL DESIGN AND ARRANGEMENTS 5CONTRACTOR SHALL BE HELD RESPONSIBLE. FOR ANY -LOSS OR DAMAGE CAUSED BY ARE TO BE NOTIFIED IMMEDIATELY, ESTIMATED LOSS OF PRODUCT AS WELL AS ACTION <br />DRAWINGS ARE DIAGRAMMATIC AND ARE NOT SCALED FOR DIMENSIONS. TAKE ALL DIMENSIONS HIM OR HIS'WORKMEN _TO THE PROPERTY OR EQUIPMENT OF THE OWNER, OR TO ,THE WORK TAKEN IS FA BE NOTED AND RECORDED. <br />FROM ARCHITECTUAL PLANS AND EQUIPMENT TO BE FURNISHED. VERIFY DIMENSIONS IN THE OR MATERIALS OF OTHER CONTRACTORS. CONTRACTOR SHALL MAKE GOOD ANY LOSS, 2.4 REPRESENTATIVE: CONTRACTOR AND PLUMBING SUBCONTRACTOR SHALL E AVAILABLE <br />FIELD. DAMAGE OR INJURY WITHOUT COST TO OWNER FOR SUCH LOSS OR DAMAGE.' RE SITE DURING TESTING PROGRAMS. FAILURE TO COMPLY WITH THIS REQUIREMENT WILL <br />5.2_ CONTRACTOR SHALL PROVIDE AND MAINTAIN SUITABLE TEMPORARY SIDEWALKS, FENCES, AS REQULT IN ANY CONNECTIONS ANP/OR REPAIRS AS REQUIRED BEING PERFORMED BY OWNER <br />PART �I- - RESPONSIBILITY OF THE CONTRACTOR AS REQUIRED. COST OF SAID REPAIRS AND/OR CONNECTIONS SHALL BE DEDUCTED FROM <br />SIGNS OR OTHER STRUCTURES AND DEVICES AS REQUIRED BY LAW, DO NOT <br />4.1 CONTRACTOR HEREBY DECLARES HE HAS READ ALL SPECIFICATIONS AND EXAMINED THE LCONTRACT AMOUNT AS REQUIRED TO SATISFY THE SITUATION. <br />OBSTRUCT OR INTERFERE WITH TRAFFIC IN PUBLIC STREETS, ALLEYWAYS OR : PRIVATE <br />DRAWINGS AND THAT HE UNDERSTANDS ALL CONDITIONS. RIGHT-OF-WAYS. IF WORK IS SUSPENDED, KEEP ALL ROADWAYS AND SIDEWALKS IN 2.5 PROHIBITED WORK: CONTRACTOR SHALL SCHEDULE WORK SUCH THAT NO HEAVY <br />4.2 CONTRACTOR HEREBY DECLARES HE HAS VISITED THE SITE AND IS FIMILIAR WITH THE PROPER CONDITION AND PUT AND LEAVE THEM IN PROPER CONDITION AT TERMINATION OF EQUIPMENT IS OPERATING ON SITE DURING INSPECTION PROGRAMS. NO WELDING OR OPEN <br />CONDITIONS AFFECTING THE WORK. NO ALLOWANCES SHALL BE MADE SUBSEQUENTLY ON WORK. FLAMES SHALL BE ALLOWED ON SITE AT ANY TIME DURING TEST PROCEDURES. <br />BEHALF OF THE CONTRACTOR FOR ANY ERROR NEGLIGENCE ON HIS PART. IF IN THE 5.3 CONTRACTOR SHALL SEND PROPER NOTICES, MAKE NECESSARY ARRANGEMENTS AND PERFORM 2•6 INSTALLATION REPORTS: SHOULD SOUTHLAND OR THEIR APPOINTED REPRESENTATIVES BE <br />PERFORMANCE OF THE CONTRACT, LATENT CONDITIONS AT THE SITE ARE FOUND TO BE ALL WORK REQUIRED FOR THE CARE, PROTECTION AND MAINFENANCE OF PUBLIC UTILITIES UNABLE TO BE PRESENT AT SITE FOR PURPOSES OF FILING ANY INSPECTION REPORTS, <br />MATERIALLY DIFFERENT FROM THOSE INDICATED BY THE DRAWINGS AND SPECIFICATIONS, OR ON AND AROUND THE BUILDING SITE, ASSUMING ALL RESPONSIBILTY AND PAYING ALL COSTS CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE INSPECTION AND FILING OF REPORT <br />UNKNOWN CONDITIONS UNUSUALLY INHERENT IN WORK OF THIS CHARATER SHOWN AND FOR WHICH THE OWNER MAY BE LIABLE. CONTRACTOR HEREBY DECLARES FIE HAS :VERIFIED WITH LOCAL CONSTRUCTION OFFICE. WRITTEN REPORT SHALL INCLUDE PHOTOGRAPHIC <br />SPECIFIED, THE ATTENTION OF THE OWNER'S CONSTRUCTION MANAGER SHALL BE CALLED THE LOCATIONS OF THE EXISTING UNDERGROUND UTILITIES ON SITE PRIOR TO THE START DOCUMENTATION OF ALL PROCEDURES. <br />IMMEDIATLEY TO SUCH CONDITIONS BEFORE THEY ARE DISTURBED. OF WORK. CONTR. HEREBY AGREES TO MAKE ARRANGEMENTS FOR AND TO PAY ALL CHARGES 2.7TEST FAILURE: SHOULD SYSTEM FAIL ANY PORTION OF TEST PROGRAM, CONTRACTOR <br />4.3 CONTRACTOR HEREBY DECLARES THAT HE HAS READ AND IS FIMILIAR WITH THE APPLICABLE <br />ABLE IN" CONJUNCTION WITH THE RELOCATIONS OF EXISTING UTILITIES AS REQUIRED. THE CONTRAC- SHALL IMMEDIATELY INSTIGATE PROCEDURES AS REQUIRED TO BRING SYSTEM INTO <br />SOILS REPORT. TOR SHALL BE RESPONSIBLE FOR ANY AND ALL UTILITY EASEMENTS, HOOK-UP CHARGES, TAP COMPLIANCE SHOULD FAILURE OF TEST DUE TO FACILITY WORK REQUIRE EXPENDITURE OF <br />FEES AND SYSTEM DEVELOPMENT FEES AS NECESSARY FOR COMPLETION OF THIS PROJECT. ADDITIONAL MONIES FOR RESCHEDULING AND/OR RETESTING OF SYSTEM, CONTRACTOR <br />CONTRACTOR SHALL BE RESPONSIBLE FOR STRICTLY ADHERING TO THE RECOMMENDATIONS 5.4IF ALL OR PART OF THE WORK IS SUSPENDED FOR ANY REASON, CONTRACTOR SHALL SHALL BE HELD RESPONSIBLE FOR COMPENSATION ACCORDINGLY. <br />OF SAID SOILS REPORT FOLLOWING ALL APPLICABLE PROCEDURES NOTED THEREIN. EXISTING PROPERLY COVER OVER, SECURE AND PROTECT ANY PORTION LIABLE TO SUSTAIN INJURY 2.8 CLEAN-UP: IN THE EVENT PRODUCT SPILLAGE SHOULD OCCUR DURING CONSTRUCTION <br />WATER TABLE HSALL DETERMINE THE UTILIZATION OF TANK STRAPS AND TYPE OF BAICKFILL FROM ANY CAUSE. OR DURING WARRANTY PERIOD DUE TO WORK PERFORMED BY CONTRACTOR, CONTRACTOR <br />MATERIAL. SHOULD GROUND WATER OR CONTAMINATION BE DISCOVERED DURING TANK 5.5 PRODUCT PROTECTION: CONTRACTOR SHALL PROVIDE ADEQUATE AND SECURE PROTECTION SHALL BE RESPONSIBLE FOR CLEAN-UP AS MAY BE REQUIRED. <br />EXCAVATION, WORK SHALL BE SUSPENDED PENDING REVIEW BY LOCAL SOUTHLAND OF PRODUCT IN TANKS UPON DELIVERLY UNTIL TURNED OVER FOR OPERATION. ALL FILL, 2.9 TEST REPORT: UPON COMPLETION OF TESTING PROGRAMS, REPRESENTIVE OF TESTING/ <br />CONSTRUCTION REPRESENTATIVE. VENT AND GAUGING CAPS AND/OR OPENINGS SHALL BE SECURED AND PADLOCKED TO INSPECTION COMPANY SHALL BE RESPONSIBLE FOR FILING COPIES OF TANK AND PIPING <br />4.4 CONTRACTOR SHALL REPORT ANY OBJECTION TO MATERIALS, APPLIANCES, OR METHODS OF PREVENT VANDALISM OR THEFT. TEST/INSPECTION REPORTS WITH LOCAL SOUTHLAND CONSTRUCTION OFFICE OR SITE <br />CONSTRUCTION SHOWN OR SPECIFIED TO THE OWNER'S CONSTRUCTION MANAGER AND OBTAIN PART 6 - SUBSTITUTION OF MATERIALS MANAGER WITH COPY TO JOB SITE. <br />A DECISION BEFORE PROCEEDING 6.1 MATERIALS AS SPECIFIED REPRESENT REQUIRED STANDARDS. SUBSTITUTION MAY BE PART 3 - TANK INSTALLATION INSPECTION <br />4.5 PROPOSALS: CONTRACTOR SHALL SUBMIT BID ON SOUTHLAND FORM PROPOSED IN WRITING WITH ADEQUATE SUPPORTING DATA FURNISHED. USE OF SUBSTITUE 3.1 SCHEDULE: CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING SCHEDULE SO <br />"GASOLINE INSTALLATION BID AN D MATERIALS IS DEPENDENT ON RECEIPT OF WRITTEN APPROVAL FROM OWNER'S APPROVED TANKS ARE TESTED AND SET IN TANK HOLE SAME DAY OF DELIVERY. <br />ESTIMATE FORM" PROPOSALS SUBMITTED ON ANY OTHER FORM SHALL BE REJECTED AND REPRESENTATIVE. 3.2 EXCAVATION: ALL EXCAVATIONS SHALL BE COMPLETED WITH BEDDING MATERIAL IN <br />RETURNED. PROPOSALS NOT COMPLETELY AND PROPERLY FILLED OUT SHALL BE PLACE AND READY FOR INSTALLATION PRIOR TO TANK DELIVERY. <br />REJECTED. PROPOSALS SHALL INCLUDE MONIES FOR REMOVAL OF ALL EXISTING PART 7 -- COMPLETION OF CONTRACT <br />IMPROVEMENTS AS REQUIRED FOR GASOLINE INSTALLATION. 7.1 THE CONTRACT SHALL BE CONSIDERED FULFILLED, SAVE AS PROVIDED IN ANY MAINTENANCE 3.3 ANCHORS: SHOULD ON-SITE CONDITIONS REQUIRE A WET HOLE TYPE INSTALLATION <br />4.6 PERMITS: CONTRACTOR SHALL BE RESPONSIBLE FOR APPLYING AND PAYING ALL STIPULATIONS, BOND OR. BYLAW, WHEN ALL THE WORK HAS BEEN COMPLETED WITH FINAL CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE PREPARATION OF CONCRETE <br />APPLICABLE STATE AND LOCAL PERMITS AND APPLICATIONS AS RELATED TO THIS WORK. INSPECTION AND ACCEPTANCE MADE BY ALL APPLICABLE GOVERNING BUILDING DEPARTMENTS, ANCHORS (DEADMAN) PRIOR TO SCHEDULING TANK DELIVERY. <br />COPIES OF PERMITS AND CERTIFICATES SHALL BE FORWARDED TO LOCAL SOUTHLAND FIRE MARSHALLS OR OTHER JURISDICTIONS. 3.4 STRAPS: ON-SITE CONDITIONS REVEAL THE NEED FOR WET HOLE TYPE <br />CONSTRUCTION OFFICE OR SITE MANAGER PRIOR TO COMMENCEMENT OF WORK, FINAL 7.2 WORKMANSHIP: INSTALLATION, CONTRACTOR SHALL IMMEDIATELY NOTIFY TANK MANUFACTURER AND <br />CERTIFICATION OF ACCEPTANCE BY GOVERNING AUTHORITIES SHALL ALSO BE ON FILE 7.2.`1 FRAME CORNERS AND JOINTS IN RUNNING MATERIALS OF FHE SAME CROSS SECTION' REQUIRED CONSTRUCTION DEPARTMENTANCHOR <br />STR SITUATION. SAID NOTIFICATION WILL E. <br />WITH LOCAL CONSTRUCTION OFFICE OR SITE MANAGER PRIOR TO THE PROCESSING OF PROFILE SHALL BE ACCURATELY FITTED TO NEAT CLOSED JOINTS, FREE FROM REQUIRED SO AS TO INCLUDE ANCHOR STRAPS WITH DELIVERY OF TANK PACKAGE. <br />FINAL PAYMENT REQUEST, OFFSETS ACROSS THE FINISH SURFACES AT THE 'JOINT. - <br />W <br />z <br />O <br />a <br />U <br />U <br />a <br />DATE: 08SEP97 <br />PROJECT NO: <br />3439.10 <br />DRAWN: MSP <br />APPROVED: CL <br />DRAWING <br />FSP -1 <br />0 <br />m <br />0 <br />0 <br />r <br />F <br />a <br />J <br />� <br />cj <br />a <br />a <br />o <br />a <br />z <br />0 <br />W <br />J <br />W <br />WZ <br />J <br />J <br />a <br />V <br />W <br />U <br />J <br />6V. <br />N <br />z <br />z <br />3 <br />a <br />¢ <br />Ln <br />DATE: 08SEP97 <br />PROJECT NO: <br />3439.10 <br />DRAWN: MSP <br />APPROVED: CL <br />DRAWING <br />FSP -1 <br />