PERFORMANCE SPECIFICATION - <br />SECTION II INSPECTIONS / TESTING - CONTINUED <br />PART 3 - TANK INSTALLATION INSPECTION - CONTINUED <br />3.5 AIR TEST: TANKS SHALL BE AIR TESTED AS PER MANUFACTURER'S SPECIFICATIONS' <br />PRIOR TO PLACEMENT. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL <br />MATERIALS TO PROVIDE COMPLETE AIR TEST INCLUDING, BUT NOT LIMITED TO, AIR <br />COMPRESSOR OF SUFFICIENT SIZE AND CAPACITY, SPECIFIED SOAP MATERIAL AND <br />ACCEPTABLE SOAP APPLICATION EQUIPMENT. <br />3.6 MINIMUM TESTING: JACKETED STEEL TANKS AS MANUFACTURED BY TOTAL CONTAINME <br />SHOULD ARRIVE AT THE, JOB SITE WITH A MINIMUM OF 4" HG ON THE INTERSTICE. <br />THE VACUUM HOLD TEST FOR AT LEAST ONE (1) HOUR PRIOR TO SETTING THE TA <br />SHOULD THE INTERSTICE NOT HOLD A MINIMUM 4" HG VACUUM, THEN CONTACT TH <br />MANUFACTURER IMMEDIATELY. <br />3.7 OBSERVATION: SOUTHLAND'S CONSTRUCTION DEPARTMENT AND/OR REPRESENTATIVE <br />SHALL BE RESPONSIBLE FOR INSPECTION OF AIR OR VACUUM TEST, OBSERVATION <br />LIFTING, SETTING AND BURIAL OF TANKS. <br />3.8 TANK INSPECTION REPORT: WRITTEN REPORT SHALL INCLUDE PHOTOGRAPHIC DOCUM <br />ATION OF ALL PROCEDURES. <br />PART 4 - TANK AND LINE TESTING <br />4.1 CONTRACTOR SHALL COMPLETE AND BE RESPONSIBLE FOR THE FOLLOWING PRIOR T <br />CONCRETE REPLACEMENT AND FINAL SYSTEM TEST: <br />4.1.1 PIPING: ALL PIPING SHALL BE COMPLETED EXCEPT INSTALLATION OF OVERFILL <br />PROTECTION, OVERFILL PROTECTION SHALL BE INSTALLED UPON COMPLETION 0 <br />4.1.2 VENTS: VENT LINES SHALL BE COMPLETED UNDERGROUND AND STUBBED UP <br />MINIMUM OF 5' ABOVE FINISHED GRADE. <br />4.1 .3 PRODUCT LINES: ALL PRODUCT LINES SHALL BE COMPLETE WITH FIRE VALVES <br />INSTALLED AT ISLAND. <br />4.1 .4 PUMPS: SUBMERSIBLE PUMPS AND LINES SHALL BE COMPLETELY INSTALLED. <br />4.1.5VAPOR RECOVERY: ALL PHASE I VAPOR RECOVERY LINES SHALL BE COMPLETE <br />PLUGGED AT ISLANDS. <br />4.1.6 FILL PIPES: ALL FILL, PHASE I VAPOR RECOVER`( AND GAUGING RISERS SHALL <br />BE INSTALLED. <br />4.1 .7 SITE PREPARATION: CONTRACTOR SHALL PREPARE TANK AREA FOR PRODUCT <br />DELIVERY AND TANK TESTING PROCEDURES. <br />4.1.8 FILL: CONTRACTOR SHALL PROVIDE 2' BACKFILL OVER TANKS OR PROVIDE <br />ACCEPTABLE INSULATED BLANKETS FOR COVERAGE OF TANKS. <br />4. 1 .9 WATER: SHOULD WATER BE PRESENT IN TANK HOLE, CONTRACTOR SHALL. VERT <br />AND NOTIFY SOUTHLAND CONSTRUCTION DEPARTMENT OF STATUS. <br />4.2 AFTER PLACEMENT OF CONCRETE A COMPLETE SYSTEM TIGHTNESS TEST INCLUDING <br />TANKS, PRODUCT LINES, STAGE II VAPOR RECOVERY LINES, SECONDARY CONTAINME <br />PIPING AND VENT LINES SHALL BE PERFORMED. TESTING SYSTEM SHALL BE AS <br />APPROVED BY THE SOUTHLAND CORPORATION. <br />4.3 PRODUCT DELIVERY: CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION TO <br />SOUTHLAND REPRESENTATIVE OF TEST DATE AND VERIFICATION OF NEED FOR TANK <br />FILLED WITH PRODUCT FOR TESTING PROCEDURES, A MINIMUM OF 72 HOURS ADVA <br />NOTIFICATION WILL BE REQUIRED FOR PRODUCT DELIVERY, <br />4,4 CONTRACTOR SHALL HAVE REPRESENTATIVES ON SITE TO ACCEPT AND RECORD ALL <br />PRODUCT DELIVERIES, CONTRACTOR'S REPRESENTATIVE SHALL REMIND DELIVERY CO <br />THAT NO OVERFILL PROTECTION IS INSTALLED AND 'TO FOLLOW PROCEDURES FOR D <br />AS SITUATION DICTATES. <br />4.5 PRODUCT REMOVAL: ANY REMAINING PRODUCT IN VENT LINES UPON COMPLETION O <br />TEST SHALL BE REMOVED BY TESTING COMPANY. <br />PART 5 START-UP INSPECTION <br />5.1 SCHEDULING: CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL SCHEDULING START - <br />AND CHECK-OUT. CONTRACTOR SHALL NOTIFY LOCAL CONSTRUCTION DEPARTMENT, <br />NECESSARY START-UP ASC'S AND APPLICABLE MAINTENANCE DEPARTMENT OFFICE <br />MINIMUM OF 48 HOURS PRIOR TO INTENDED FINAL START-UP AND CHECK-OUT DA <br />AND TIME. IT IS SOUTHLANDS PREFERENCE NOT TO SCHEDULE A FRIDAY STARTUP. <br />5.2 PERSONNEL: CONTRACTOR, PLUMBING SUBCONTRACTOR, GAS CONTRACTOR AND <br />ELECTRICAL SUBCONTRACTOR SHALL BE AVAILABLE ON-SITE DURING START-UP. <br />5.3 START-UP: PHYSICAL START-UP AND CHECK-OUT OF SYSTEMS AND EQUIPMENT S <br />DONE BY AND AT THE DIRECTION OF SOUTHLAND REPRESENTATIVE ONLY. CONTRACT <br />NOT START OR ACTIVATE ANY EQUIPMENT WITHOUT THE SPECIFIC DIRECTIVE OF S01 <br />REPRESENTATIVE. DAMAGE TO ANY SOUTHLAND EQUIPMENT DUE TO IMPROPER INS7 <br />AND/OR UNAUTHORIZED START-UP WILL BE THE RESPONSIBILITY OF THE CONTRACT <br />5.4 SITE COMPLETION: ALL SITE WORK, INCLUDING CONCRETE/ASPHALT PAVEMENTS, SH <br />BE COMPLETE. ALL UTILITIES SHALL BE CONNECTED AND OPERATIONAL, ALL <br />LANDSCAPING, INCLUDING SPRINKLER SYSTEMS, SHALL BE COMPLETE. <br />5.5 VERIFICATION: PRIOR TO SCHEDULING OF START-UP, CONTRACTOR SHALL OBSERVE <br />AND VERIFY CORRECTNESS AND COMPLIANCE TO SOUTHLAND'S DRAWINGS AND <br />SPECIFICATIONS FOR THE FOLLOWING: <br />5.5.1MANWELLS SHALL BE PROPERLY CENTERED/INSTALLED AT OVERFILLS, SUBMER <br />VAPOR RECOVERY, AUTOGAUGING, OBSERVATION TUBES AND SUMP/RISERS, <br />5.5.2 PROPER HEIGHT OF GRAVEL BACKFILL AROUND SUMP/RISERS. <br />5.5.3 TANK I.D. MARKERS INSTALLED IN CONCRETE AT PROPER LOCATIONS, <br />5.5.4 ALL BRASS GOODS AND FITTINGS PROPERLY INSTALLED, TIGHT AND SECURE. <br />5.5.5 LEAK DETECTORS INSTALLED. <br />5.5.6 PROTECTED FLEX LINES PROPERLY INSTALLED WITHOUT TWIST IN INSTALLATION <br />AID STRIPE, <br />5.5.7 MANHOLE EXTENDERS PROPERLY INSTALLED AND SCREWED IN FRAME OF MAN <br />SUMP/RISERS, PROPERLY SET AND SEALED TO TANK MANWAY OR FITTINGS AN <br />CLEANED OUT FREE OF DEBRIS AND CONCRETE. <br />5:5.8 TANKS CLEAN AND FREE OF WATER: <br />5:5.9 ISLAND FORM INNER BOXES PROPERLY CLEANED" OUT FREE OF DEBRIS AND <br />CONCRETE:' <br />5.5.10DISPENSERS PROPERLY SET AND SECURED TO ISLAND BOX FRAME AND <br />DISPENSER SUMPS PROPERLY CLEANED OUT FREE OF ,DEBRIS AND CONCRETE <br />5.5.1 1 FIRE VALVES SECURED TO FRAME WITH,: PROPER HARDWARE. <br />5.5.12PHASE II VA1?OR RECOVERY LINES, STUBBED UP AND SECURED IN PROPER LC:) <br />XQFF <br />CONTINUED <br />SECTION II INSPECTIONS / TESTING CONTINUED <br />PART 5 START-UP INSPECTION CONTINUED <br />l T N ' COMPLETED. VERIFY <br />T J WITH ALL CONNEC 10 S <br />5.5.1.5 ELECTRICAL CONDUITS S SEG RED <br />COMPLIANCE WITH REQUIREMENTS FOR ISOLATED GROUND WIRING TO JUNCTION BOX <br />CASING: <br />5.5.14 DISPENSER CANOPIES INSTALLED AND LIFTING LUGS REMOVED WITH PROPER <br />PLUGS INSERTED. <br />NT 5.5.15 ALL NOZZLES AND SWIVELS AVAILABLE ON-SITE, INSTALLED PRIOR ONLY IF <br />OBSERVE REQUIRED BY GOVERNINO AUTHORITIES FOR INSPECTION PURPOSES. <br />NKS. 5.5,.16 ALL INSPECTIONS BY GOVERNING AUTHORITIES_ COMPLETED AND SIGNED. SIGNED <br />E TANK AND COMPLETED PERMIT CARD ON SITE. <br />5.5.17 ELECTRICAL DEVICES INCLUDING LIGHTS, SIGNS AND INTERCOMS PROPERLY <br />OF INSTALLED, SECURED, AND PLUMB. <br />5.5.18 ANY WIRING INSPECTION PORTS IN CANOPY COLUMNS COVERED WITH <br />ENT- ACCEPTABLE PLATES. <br />5.5.19 VENT LINES PROPERLY SECURED, PROTECTED, AN INSTALLED AT PROPER HEIGHT <br />5.5.20 VERIFICATION OF COMPLIANCE FOR TANK AND LINE TEST AVAILABLE', ON SITE. <br />5.5.21 ALL MANHOLES FREE OF CONCRETE. AND DEBRIS. <br />0 5,5.22_ MANHOLE COVERS PROPERLY PAINTED. <br />5.5.23 ALL PAINTING COMPLETE INCLUDING CANOPY,, DOWNSPOUTS_, METALS AND <br />F" TEST. MISCELLANEOUS METALS, <br />5.5.24 CONCRETE AT ISLANDS AND TANK PAD TRUE, PROPERLY SLOPED AND FINISHED <br />WITH ACCEPTABLE RISE TO MANHOLES. <br />5.5.25 ELECTRICAL PANELS PROPERLY COMPLETED TO INCLUDE: <br />(A) ONE BREAKER FOR EACH SUBMERSIBLE PUMP, DISPENSER, CONSOLE <br />AUTOGAJGING, DISPENSER LIGHTS (ALL) AND CANOPY: LIGHTS (ALL). <br />AND (B) GAS PANEL CONTROLLED BY ON MAIN "BREAKER. <br />(C) CONTROL BOXES AND DISTRIBUTION BOXES INSTALLED AND WIRED. <br />(D) INTERCOM INSTALLATION COMPLETE AND PROPERLY WORKING. <br />(E) CONSOLE INSTALLATION COMPLETE AND FUNCTIONAL: <br />(F) ALL WIRING PROPERLY IDENTIFIED WITH COLOR" CODED WIRING. <br />(G) CONDUITS PROPERLY IDENTIFIED. <br />FY (H) ALL BREAKERS IN "OFF' POSITION. <br />5.6 NOTIFICATION: CONTRACTOR SHALL VERIFY ITEMS AS INDICATED ABOVE PRIOR TO <br />SCHEDULING OF START --UP. BY SO NOTIFYING THE START-UP ASC'S AND CONSTRUCTION <br />ENGINEER, THE GAS CONTRACTOR IS CERTIFYING THAT ALL NEEDED PREP WORK WILL <br />NT BE COMPLETE. MONIES AND/OR TIME LOST 'AT START-UP DUE TO NON- <br />COMPLIANCE SHALL BE CHARGED TO GAS CONTRACTOR ACCORDINGLY. <br />5.7 LINE TESTING: PRIOR TO SYSTEM START --UP; A NYA,ROSTATIC LINE TEST SHALL BE <br />PERFORMED ON PRODUCT LINES. TESTING METHOD. SHALL BE AS APPROVED BY <br />S TO BE SOUTHLAND ENVIRONMENTAL DEPARTMENT. TEST SHALL B7' PERFORMED WITH <br />NCE SOUTHLAND REPRESENTATIVE ON SITE. <br />5.8 CATHODIC PROTECTION SYSTEMS: AS APPLICABLE, SHALL BE TESTED FOR <br />EFFECTIVENESS AND COMPLIANCE WITH MANUFACTURER'S CRITERIA, <br />5.9 CLEAN-UP: CLEAN UP ALL DEBRIS CAUSED BY WORK OF THIS SECTION, KEEPING <br />COM PREMISES CLEAN AND NEAT AT ALL TIMES. <br />DELIVERY <br />SECTION IIIIEEARFH WORK <br />F PART 1 GENERAL <br />1.1 SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, MATERIALS, <br />SERVICES, EQUIPMENT AND APPLIANCES REQUIRED IN CONJUNCTION WITH OR <br />JP PROPERLY INCIDENTAL TO EARTHWORK, <br />PART 2 - PRODUCTS <br />A 2.1 FILL MATERIAL: SHALL BE MATERIAL IN COMPLIANCE WITH TANK AND LINE <br />TE MANUFACTURER'S SPECIFICATIONS. <br />2.1.1PEA GRAVEL: SHALL BE CLEAN, NATURALLY ROUNDED AGGREGATE WITH A MIX <br />OF PARTICLE SIZE NOT LESS THAN 1/8" OR MORE THAN 3/4". <br />2.1.2STONE OR GRAVEL CRUSHINGS: SHALL'BE WASHED MATERIAL WITH ANGULAR <br />HALL BE PARTICLE SIZE NOT LESS THAN 1/8 OR MORE THAN 1/2". <br />OR SHALL NOTE: MATERIALS MUST MEET ASTM C-33 PARAGRAPH 7.1 FOR QUALITY AND <br />SOU SOUNDNESS. FILL MATERIAL SHALL NOT ,HAVE MORE THAN 37. PASSING A #8 SIEVE. <br />RELATION '' DRY GRAVEL DENSITY MUST BE A MINIMUM OF 95 POUNDS PER CUBIC FOOT. <br />OR. 2.1.3SAND: (WHEN APPROVED IN WRITING ON A PER PROJECT BASIS.) MATERIAL <br />ALL SHALL BE CLEAN, -WASHED, INERT, WELL GRANULATED WITH LESS THAN 8% BY <br />WEIGHT PASSING A #200 SIEVE. <br />2.2 GEOTEXTILE MATERIAL: SOIL STABILIZATION FILTER FABRIC MATERIAL SHALL BE ONE <br />OF THE FOLLOWING: <br />2.2.1 PHILLIPS FIBERS, SURPAC 4NP (PHONE #800-845-5737), <br />SIBLES, 2.2 2HOECHST CELANESE CORPORATION TREVIRA`S1125 (PHONE #800-845-7597). <br />2.2,3REEMAY, INC., TYPAR 3401 ' OR TYPAR 3341 (PHONE #800-32"1-6271). <br />PART 3 - EXECUTION <br />3.1 PROTECTIONS: PROVIDE ADEQUATE SHORING; 'BRACING, PILING AND <br />CRIBBING <br />3.2 LAYOUT: CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL ,WORK. OWNER <br />RESERVES THE RIGHT TO MAKE ADJUSTMENTS IF DISCREPANCIES ARE FOUND BY <br />CONTRACTOR. REPORT DISCREPANCIES TO OWNER'S LOCAL CONSTRUCTION MANAGER. <br />SET AND MAINTAIN NECESSARY STAKES; BATTER BOARDS AND REFERENCE POINTS, <br />HOLE 3.;5 EXCAVATION: EXCAVATE TO LINES, ELEVATIONS AND LIMITS REQUIRED BY THE <br />D DRAWINGS, PLUS SUFFICIENT DISTANCE AND SPACE TO PERMIT INSTALLATION OF TANKS. <br />EXCAVATE AS REQUIRED, REGARDLESS OF TYPE, CONDITION OR MOISTURE CONTENT OF <br />THE MATERIAL ENCOUNTERED. HAUL EXCESS MATERIAL OFF THE SITE AND DISPOSE OF <br />SAME DIMENSIONS OF TANK EXCAVATION SHALL: BE MINIMAL AS ESTABLISHED BY <br />SOUTHLAND CORPORATION DRAWINGS 'UNLESS TANK ,MANUFACTURER REQUIREMENTS ARE <br />GREATER, <br />3.4 SAWCUTTING: IF PAVING MUST BE RE=MOVED, THE PERIMETER OF THE TANK HOLE AND <br />ALL TRENCHES SHALL. BE CUT WITH A CONCRETE SAWN NOTE: PAVING TO BE CUT 2' <br />CATION. BEYOND' EDGES OF TANK HOLD IN ALL DIRECTIONS IN ORDER TO GIVE PROPER SUPPORT <br />TO NEW SLAB TO AVOID SETTLING. <br />SECTION III EARTH WORK - CONTINUED <br />PART 3 EXECUTION - CONTINUED <br />3.5 HAZARDOUS MATERIAL; SHOULD ROCK, WATER OR OTHER HAZARDOUS MATERIALS NOT <br />SHOWN ON SOILS TEST BE ENCOUNTERED, LOCAL CONSTRUCTION OFFICE SITE MANAGER <br />SHALL BE IMMEDIATELY CONTACTED FOR APPROVAL TO PROCEED. <br />3.6 PROTECTION: CONTRACTOR SHALL PROVIDE SUFFICIENT PROTECTION WITH EARTHEN <br />BERMS AT ALL TIMES TO PROTECT TANK HOLE AND TRENCHES FROM DRAINAGE OF <br />SURFACE WATERS. EXCAVATIONS SHALL BE PROPERLY MARKED, PROTECTED AND <br />BARRICADED FOR SAFETY UNTIL BACKFILL IS COMPLETE AND SURFACING FINISHED. <br />3.7 SHORING: CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING REQUIREMENTS <br />FOR SHORING AND PROVIDING SAME SHOULD SITE AND/OR SOIL CONDITIONS <br />WARRANT SAME. <br />3.8 FILLING AND BACKFILLING: PLACE APPROVED FILL MATERIAL IN STRICT ACCORDANCE <br />WITH TANK MANUFACTURER'S SPECIFICATIONS. PROVIDE A 12' BED OF APPROVED <br />BACKFILL OVER BOTTOM OF EXCAVATION PRIOR TO TANK PLACEMENT. BACKFILL SHALL <br />BE PLACED AND COMPACTED IN MAXIMUM 12" LIFTS. <br />3.9 CLEAN-UP: CLEAN IJP ALL DEBRIS CAUSED BY WORK OF THIS SECTION, KEEPING <br />PREMISES CLEAN AND NEAT AT ALL TIMES. <br />SECTION IV TANK INSTALLATION <br />PART 1 - GENERAL <br />1.1 SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, MATERIALS, SERVICES, <br />EQUIPMENT AND RELATED APPLIANCES REQUIRED IN CONJUNCTION WITH OR PROPERLY <br />INCIDENTAL TO THE INSTALLATION OF GASOLINE STORAGE TANKS. <br />PART 2 - PRODUCTS <br />2.1 TANKS: SHALL BE DESIGNED AND MANUFACTURED SO AS TO BE CORROSION <br />PROTECTED PER EPA REQUIREMENTS. APPROVED TANKS SHALL BE: <br />2. 1.1 ILL LISTED HDPE JACKET STEEL TANKS AS SUPPLIED BY TOTAL CONTAINMENT, INC. <br />2.2 HOLD DOWN STRAPS: STRAPS AS REQUIRED BY SOILS/WATER CONDITION SHALL <br />BE SUPPLIED BY TANK MANUFACTURER ONLY. FIELD FABRICATED UNITS ARE NOT <br />ACCEPTABLE. <br />PART 3 - INSTALLATION <br />3.1 MANUFACTURING: REFER TO TANK MANUFACTURERS CRITERIA AND SPECIFICATIONS FOR <br />TANK INSTALLATION AND ADHERE TO AS REQUIRED. <br />3.2 CLEARANCES: MINIMUM CLEARANCE FOR TANKS SHALL BE AS FOLLOWS: SHOULD <br />REQUIREMENTS OF TANK MANUFACTURER OR SOIL CONDITIONS DICTATE GREATER <br />CLEARANCE, ADHERE TO ACCORDINGLY, <br />3.2.1 BOTTOM: PROVIDE MINIMUM OF 12" BEDDING MATERIAL BETWEEN BOTTOM OF <br />EXCAVATION OR PAD AND BOTTOM OF TANK. <br />3.2.2SIDES: PROVIDE MINIMUM OF 2'0" BETWEEN TANKS AND 2'0" FROM SIDE/END OF <br />TANK TO WALL OF EXCAVATION. <br />.3.2.3 TOP: PROVIDE 38" FILL MATERIAL OVER TANK PLUS 8" OF CONCRETE <br />3.3 TESTING: PRIOR TO INSTALLATION OF 'TANKS, TEST PER MANUFACTURER'S <br />SHALL BE PERFORMED ON TANK, ON DUAL WALL_ TANKS, CONSULT TANK MANUFACTURER <br />FOR TESTING CRITERIA BUT MINIMUM 4" HG VACUUM MUST BE HELD ON INTERSTIAL <br />SPACE FOR AT LEAST ONE (1) HOUR. <br />3.4 PLACEMENT: <br />3.4.1 REFER TO SITE PLAN FOR TANK PLACEMENT AND PRODUCT ROTATION. <br />3.4.2 PR10R TO SETTING OF TANKS, REMOVE ALL FOREIGN DEBRIS, ROCKS, CLODS, <br />GARBAGE, ETC. FROM EXCAVATION. <br />3.4.3 PLACE TANKS ONLY ON APPROVED FILL. DO NOT SET ON CONCRETE OR WOOD. <br />3.4.4SLOPE TANKS 2" MINIMUM AND 4" MAXIMUM TOWARDS END WITH FILL OPENING, <br />3.4.5TANKS SHALL BE. BURIED TO MINIMUM DEPTH AS PER ABOVE AND AS SHOWN ON <br />GASOLINE DRAWINGS. TANKS MAY REQUIRE GREATER BURIAL DEPTH IF INSTALLED IN <br />REMOTE POSITION TO ALLOW FOR PROPER SLOPE ON VENT LINES. VERIFY DEPTH AS <br />REQUIRED. <br />3.5 PLUGS: ALL UNUSED PLUGS SHALL BE REMOVED. APPLY COMPATIBLE NON -HARDENING <br />PIPE SEALANT' TO INTERNAL BUSHING THREADS. PERMANENT METAL PLUGS SHALL BE <br />INSTALLED AT ALL UNUSED OPENINGS. <br />3.6 BUSHING: THE DI --ELECTRIC BUSHINGS IN STI -P3 TANKS SHALL NOT BE REMOVED <br />FROM THE UNUSED OPENINGS. THE PLUGS IN TANK OPENINGS WHICH ARE TO BE USED <br />SHALL NOT BE OVERTIGHTENED AS THIS MAY CAUSE THE BUSHING TO UNSCREW WITH <br />THE PLUG. CARE SHALL BE TAKEN NOT TO CROSSTHREAD OR DAMAGE THE NON- <br />METALLIC BUSHINGS WHEN REPLACING PLUGS OR INSTALLING REQUIRED TANK PIPING. <br />3.7 WET HOLE INSTALLATION: SHOULD GROUND WATER BE PRESENT IN TANK EXCAVATIONS. <br />ANCHORING SHALL BE REQUIRED. <br />3.7.1 WELL POINT: WATER SHALL BE KEPT AT LOWEST POSSIBLE POINT BY WELL POINT <br />SYSTEM(S) AND PROPERLY SIZED PUMP(S). <br />3.7.2ANCHORS: DEADMAN SHALL BE CONSTRUCTED OF CONCRETE AS DETAILED IN <br />DRAWINGS AND AS PER TANK MANUFACTURER'S RECOMMENDATIONS. PLACE 12" FROM <br />OUTSIDE VERTICAL LINE OF TANK(S) AS SHOWN ON DRAWINGS. <br />3.7.3TIE DOWNS: STRAPPING MATERIAL SHALL BE AS PER TANK MANUFACTURER'S <br />REQUIREMENTS. <br />3.7.4TURNBUCKLES: TO REMOVE CABLE SLACK, UTILIZE 5/8 " JAW TYPE TURNBUCKLES, <br />ONE EACH SIDE OF TANK (2 PER STRAP). <br />3.7.5STRAP PLACEMENT: AS PER TANK MANUFACTURER'S SPECIFICATIONS. <br />3.7.61NSULATION: TANKS SHALL BE INSULATED FROM TIEDOWNS BY PLACEMENT OF <br />APPROVED DI --ELECTRIC MATERIAL BETWEEN STRAP AND TANK. MATERIAL SHALL BE <br />PETROLEUM RESISTANT MATERIAL AS APPROVED BY TANK MANUFACTURER. <br />3.7.7 COATING:' COVER ALL NON -GALVANIZED HARDWARE WITH TWO (2) COATS OF <br />ASPHALT IMPREGNATED WITH WATERPROOFING PRIOR TO PLACEMENT.OF BACKFILL <br />3.8 LIFTING: TANKS SHALL BE LIFTED ONLY AS PER MANUFACTURER'S RECOMMENDATIONS, <br />UTILIZING LIFTING LUGS PROVIDED ON TANKS. TANKS SHALL NOT BE ROLLED, DROPPED <br />OR WRAPPED WITH CHAINS, EQUIPMENT OF SUFFICIENT SIZE, DESIGN AND LIFT CAPACITY <br />SHALL BE UTILIZED FOR SETTING OF TANKS. SHOULD TANKS BE BUMPED, DENTED, DROPPED <br />OR MISHANDLED IN ANY WAY, INSTALLATION SHALL BE HALTED AND TANK MANUFACTURER'S <br />REPRESENTATIVE IMMEDIATELY CONTACTED FOR RECERTIFICATION OF TANKS. CONTACT LOCAL <br />CONSTRUCTION OFFICE OR SITE MANAGER IMMEDIATELY UPON NOTICE OF QUESTIONABLE <br />- <br />HANDLING OF TANKS OR NOTABLE DAMAGE THERETO. <br />DATE: 08SEP97 <br />PROJECT NO: <br />3439.10 <br />DRAWN: MSP <br />APPROVED: CL <br />DRAWING <br />FSP -2 <br />0 <br />m <br />� <br />� <br />o <br />0 <br />a <br />J <br />h <br />U <br />a <br />W <br />W <br />o <br />a <br />K <br />a <br />z <br />O <br />J <br />J <br />W <br />W <br />Z <br />J <br />J <br />a <br />U <br />U <br />w <br />a <br />N <br />w <br />� <br />a <br />DATE: 08SEP97 <br />PROJECT NO: <br />3439.10 <br />DRAWN: MSP <br />APPROVED: CL <br />DRAWING <br />FSP -2 <br />