My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998 PLAN
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
INSTALL_1998 PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 1:04:47 PM
Creation date
11/5/2018 8:55:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998 PLAN
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\2360\PR0507204\INSTALL PLAN 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'PERFORMANCE SPECIFICATION CONTINUED <br />SECTION IX CANOPIES - CONTINUES <br />PART 3 - EXECUTION -CONTINUED <br />3.1.17 FABRICATION DRAWINGS SHALL BE DELIVERED TO APPLICABLE CONSTRUCTION OFFICE <br />A MINIMUM OF 4 WEEKS PRIOR TO COMMENCEMENT OF CONSTRUCTION. NO WORK <br />SHALL COMMENCE PRIOR TO APPROVAL OF DRAWINGS BY SOUTHLANDS'S CONSTRUCTION <br />REPRESENTATIVE. <br />3.2 EXECUTION: <br />3.2.1 COORDINATE DELIVERY AND INSTALLATION WITH GERNERAL GASOLINE INSTALLER <br />THROUGH LOCAL CONSTRUCTION OFFICE. MATERIALS SHALL BE STORED AT POSITION AS <br />INDICATED BY GENERAL GASOLINE INSTALLER, <br />3.2.2 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PRQVIDING FOOTING ANCHOR <br />BOLTS AND TEMPLATE FOR DELIVERY TO GENERAL GASOLINE INSTALLATION CONTRACTOR <br />2 WEEKS PRIOR TO INSTALLATION. SIZE IN ACCORDANCE WITH SHOP DRAWINGS AND IN <br />ACCORDANCE WITH GASOLINE INSTALLING CONTRACTOR'S SCHEDULE OF CONSTRCUTION. <br />3.2.3 FOOTINGS FOR CANOPY AND PLACEMENT OF ANCHOR BOLTS SHALL BE PERFORMED BY <br />GENERAL GASOLINE INSTALLER AS PER APPROVED SHOP DRAWINGS. TYPE OF CONCRETE <br />SHALL BE AS PER SHOP DRAWINGS, TYPE, SIZE, AND PLACEMENT OF ALL REINFORCED <br />STEEL SHALL BE AS PER SHOP DRAWINGS. <br />3.2.4 THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE STARTING WORK AND <br />NOTIFY SOUTHLAND'S CONSTRUCTION REPRESENTATIVE IMMEDIATELY OF ANY DISCREPANCIES <br />FOUND. REFER TO SITE PLAN FOR SIZE, TYPE AND PLACEMENT OF CANOPY. <br />3.2.5 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR BEING PROPERLY LICENSED IN <br />LOCAL INSTALLATION AS WELL AS PROVIDING OWN PERMITS AS MAY BE REQUIRED. A <br />COPY OF THE PERMIT MUST BE ON FILE IN THE LOCAL CONSTRUCTION OFFICE PRIOR <br />TO COMMENCING WORK, <br />3.26 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING CONSTRUCTION OFFICE <br />WITH ACCEPTABLE INSURANCE AS REQUIRED PER SOUTHLAND CORPORATION INSURANCE <br />SPECIFICATIONS AND STANDARD CONTRACT FOR CONSTRUCTION. INSURANCE SHALL BE <br />IN EFFECT FOR DURATION OF WORK, <br />3.2.7 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL WORK OF <br />OTHER CONTRACTORS ALREADY IN PLACE, AS MAY BE REQUIRED. <br />3.2.8 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING AND OBTAINING <br />APPROVAL OF GENERAL GASOLINE CONTRACTOR PRIOR TO PLACING OF ANY HEAVY <br />EQUIPMENT ON TOP OF CONCRETE WORK ALREADY IN PLACE. <br />3.2.9 ALL FOOTINGS SHALL BE ON FIRM UNDISTURBED SOILS OR FILL COMPACTED <br />TO 95% MAXIMUM DENSITY BASED ON A.S.T.M. D 1.557-70. IF ANY POOR SOIL <br />CONDITION IS DISCOVERED DURING EXCAVATION, THE DESIGN ENGINEER SHALL BE <br />NOTIFIED IMMEDIATELY FOR SOIL BEARING VERIFICATION. <br />3.2.10SUPPORTING COLUMNS SHALL BE PLACED AS PER SOUTHLAND GASOLINE PLANS AND <br />AS PER APPLICABLE SITE PLAN. <br />3.2.11CANOPY SUPPORT COLUMNS SHALL BE CAPPED AT TOP. <br />3.2.12ALL MATERIALS SHALL BE ALIGNED TRUE AND FLAT AND ALL PLANES SHALL BE <br />FLAT, TRUE TO ESTABLISHED LINES WITH ALL SOFFITS BEING LEVEL AND VERTICAL <br />WALLS CORRECT AND ACCEPTABLE. PARAPET FASCIA SHALL BE VERTICAL AND PLUMB, <br />ALL INTERSECTIONS SHALL BE TRUE AND STRAIGHTEDGE LINES, MATERIALS SHALL BE <br />LEFT IN ACCEPTABLE CONDITION TO BE PAINTED BY OTHERS. ALL M9ETAL SHALL BE <br />FREE OF DEBRIS AS MAY BE REQUIRED FOR FINAL PAINTING/FINISHING, <br />3.2.13 INSTALLING CONTRACTOR SHALL BE RESPONSIBLE FOR POURING OF CONCRETE <br />AROUND CANOPY COLUMNS, COVERING ANCHOR BOLTS AS MAY BE REQUIRED, <br />3.2.14CANOPY CONTRACTOR SHALL LEAVE ALL EXPOSED STRUCTURAL STEEL FREE OF <br />DEBRIS, PRIMED AND READY FOR FINAL PAINTING BY GASOLINE CONTRACTOR. <br />3.3 RESPONSIBILITIES OF GENERAL GASOLINE CONTRACTOR: <br />3.3.1 SHALL BE RESPONSIBLE FOR A MINIMUM OF 30 DAY NOTIFICATION OF DATE WHEN <br />SITE WILL BE READY FOR INSTALLATION OF GASOLINE CANOPY, <br />3.3.2UPON AGREED DATE BETWEEN GASOLINE CONTRACTOR AND CANOPY, CONTRACTOR,,, <br />THE SITE SHALL BE FREE Of MATERIAL, MOVABLE EQUIPMENT AND DEBRIS, LEVEL AND <br />IN PROPER CONDITION FOR CANOPY INSTALLATION. GENERAL GASOLINE CONTRACTOR <br />SHALL PERFORM SITE WORK AS MAY BE REQUIRED TO COMPLY. <br />3.3.3GASOLINE CONTRACTOR SHALL NOT INSTALL GASOLINE DISPENSERS PRIOR TO CANOPY <br />ERECTION, UNLESS AGREED UPON IN WRITING BETWEEN THE CANOPY INSFALLER AND <br />GASOLINE INSTALLER. <br />3.3.4GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF CANOPY <br />FOOTINGS AS DESIGNED IN SHOP DRAWINGS PROVIDED BY CANOPY MANUFACTURER, <br />PROVIDING ALL STEEL, ETC., (WITH THE EXCEPTION OF ANCHOR BOLTS TO BE <br />PROVIDED BY CANOPY INSTALLER). FOOTINGS SHALL BE POURED IN A SUFFICIENT <br />AMOUNT OF TIME, SO PROPER CURING TIME IS ALLOWED, <br />3.3.5GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR PAINTING OF ALL METAL AND <br />TRIM AS RELATED TO THE GASOLINE CANOOPY AS PER STANDARD COLOR REQUIREMENTS. <br />3.3,6GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WIRING AND INSTALLATION <br />OF LIGHTS, SIGNS, SECURITY LIGHTS, ETC., IN CONJUNCTION WITH NORMAL <br />GASOLINE INSTALLATION. <br />3.3.7GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR LEAVING BLOCKOUTS AS MAY <br />BY REQUIRED FOR INSTALLATION OF CANOPY IN ACCORDANCE WITH SHOP DRAWINGS. <br />AND PLACEMENT OF ANCHOR BOLTS IN ACCORDANCE WITH SHOP DRAWINGS AS RELATED <br />THERETO. <br />3.4 WARRANTIES: CANOPY CONTRACTOR SHALL WARRANY, IN WRITING, COMPLETE CANOPY <br />.INSTALLATION FOR A MINIMUM PERIOD OF 2 YEARS. A 5 YEAR WARRANTY <br />GUARANTEEING INSTALLATION TO BE FREE OF DESIGN AND INSTALLATOIN DEFECTS. <br />INCLUDINGS ACTS OF MAN, GOD AND NORMAL WEAR AND TEAR, SHALL BE COVERED. <br />3.5 GLEAN -UP: CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR CLEAN-UP AND <br />REMOVAL FROM SITE ALL TRASH AND DEBRIS RESULTING FROM WORK RELATING TO <br />INSTALLATION OF CANOPY. <br />DATE: 085EP97. <br />PROJECT NO: <br />3439.10 <br />DRAWN: MSP <br />APPROVED: O, <br />DRAWING <br />I FSP -5 <br />0 <br />m <br />F- <br />J <br />F <br />v <br />a <br />a <br />o <br />Za <br />zo <br />a <br />w <br />w <br />w <br />� <br />h <br />DATE: 085EP97. <br />PROJECT NO: <br />3439.10 <br />DRAWN: MSP <br />APPROVED: O, <br />DRAWING <br />I FSP -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.