My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1995 - 2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231580
>
COMPLIANCE INFO 1995 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 1:12:30 PM
Creation date
11/5/2018 9:02:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995 - 2008
RECORD_ID
PR0231580
PE
2361
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY 76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
01
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\2420\PR0231580\COMPLIANCE INFO 1995 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 1995 - 2008
QuestysRecordDate
8/10/2018 6:20:10 PM
QuestysRecordID
3960413
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging I SIR Equipment: © Check this box if tank gauging is used only for inventory control. <br /> w ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section mist be completed if in-tank gauging equipment is used to perform leak- detection monitoring. <br /> Conwiete the following check-list: <br /> U No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults": 9; <br /> Yes 7 NO I Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes + ❑ Ivo* Was accuracy of system product level readings tested? <br /> es Q No* Was accuracy of system water level readings tested? <br /> Ef/yes 0 No* Were all probes reinstalled properly? <br /> Rf I <br /> Yes 0 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or wail!be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Com to the following checklist: <br /> 2` es ❑ NO* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD perforrnance? <br /> ❑ N/A (Check-all that apply) Simulated leak rate: M—S.h.; Q 0.1 g.p.h; ❑0.2 g-pdt. <br /> Y ❑ No* I Were all LLDs conffined operational and accurate within regulatory requirements? <br /> Yes © No* Was the testing apparatus propezly calibrated? <br /> Yes ❑ No* For.mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> © N/A <br /> Q Yes © No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> M N_/A <br /> ❑ Yes O No* ' For electronic LLDs, does the turbine automatically shut off if any portion of the moniuning system is disabled <br /> C']N A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> si3 NIA or fails a test? <br /> 0 Yes El Nom* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 2 NIA <br /> es ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section K below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments- <br /> Page 3 of 3 rs3�o1 <br /> k <br />
The URL can be used to link to this page
Your browser does not support the video tag.