Laserfiche WebLink
SWRCB,January 2002 Page �5- of ) } <br /> b. PIPING SUMT TESTING <br /> Test Method Developed By: ❑Sump Manufacturer Industry Standard ❑Professional Engineer <br /> C Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: (;—Che( ? (l (,8IEquipment Resolution: j <br /> Y« _ Sump# Sump# J Sump# Sump# <br /> Sump Diameter: <br /> Sump Depth: r �/ <br /> Sump Materialt j'y1arly ", l%vr�ss�,�;,�+ .,,�► 1l <br /> Height from T&nk Top to Top of <br /> Highest Piping Penetration: b <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: �/it 2- 4 <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested' C1Ga¢. t' L vr- (l It Lt <br /> Does turbine shut down when ❑Yes ❑No INA <br /> sump sensor detects liquid(both ❑Yes ❑No *A ❑Yes ❑No `�NA ❑Yes ❑No 'XNA <br /> product and water)?' 1 <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe ❑Yes ❑No �&A ❑Yes a No WNA ❑Yes ©No �9 NA ❑Yes ❑No `�NA <br /> shutdown?- <br /> Was fait-safe verified to be ❑Yes ❑No iD&A ❑Yes [:No �NA ❑Yes []No NA ❑Yes ❑No NA <br /> operational?' <br /> Wait time between applying <br /> pressure/vacuum/water and starting 4 tf f? <br /> test: ,J <br /> Test Start Time: 10 : 5 /1-v <br /> Initial Reading(Rt): <br /> Test End Time: <br /> Final Reading(RF): , g Z c jr 1 , .1916 <br /> Test Duration: Z�'�^^- i Z"'c_ <br /> Change in Reading(RF-RI): Q 9 000 1 L <br /> Pass/Fail Threshold or Criteria: Q, Q r 2- 0,C)C:2— <br /> Test <br /> Test Result: Pass . G Fail ass_, ❑Fail 0 Pass;. O Fail ❑ Pass l7 Fail; <br /> Was sensor removed for testing? Yes CC No ❑NA dyes ❑No ❑NA Yes ❑No ❑NA )6Yes ❑No ❑NA <br /> Was sensor properly replaced and $Yes []No ❑NA Yes ❑No IJ Yes ❑No ❑NA Yes LI No LI NA <br /> verified functional after testing? <br /> COIIlMentS—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Costco #658 <br /> 3250 Granliine & Hwy 205 <br /> Tracy, CA 95377 <br /> E Lf the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />