Laserfiche WebLink
Work Plan, 2-15 <br /> Secondary Containment Testing Of Underground Storage Tank Systems <br /> Contractor: Wayne Perry, Inc. <br /> Updated: 7/12/02 <br /> Qualifications: <br /> • WPI currently holds business license number CA 300345 — A B C61 1 D40 Haz (available <br /> upon request) <br /> • Information regarding Worker's Compensation and Employers' Liability (available upon <br /> request). <br /> • WPI is licensed to perform work in the referenced city/county(available upon request). <br /> • WPI provides HAZWOPR training for employees. WPI develops a site-specific Health and <br /> Safety Plan wl Confined Space Permit for each testing location (available on-site, on day of <br /> testing). <br /> • WPI is certified by component manufactures. Certification's were updated at a training <br /> seminar held at Shields/Harper, March 18th through 20'h, 2002 (available upon request). <br /> Test Equipment: <br /> • WPI utilizes third party certified hardware and software for all hydrostatic tests (attached). <br /> • Pressure Gauges are dual redundant (two gauges per line test), 0-15 psi pressure range, 2.5- <br /> inch diameter, glycerin-filled, with manually set test pressure verification needle. <br /> • Vacuum Gauges are dual redundant (two vacuum gauges per annular test), 0-30 in-hg <br /> vacuum range, 3-inch diameter. <br /> Test Procedures: <br /> • Local CUPA will be notified of testing schedule a minimum of 48-hours before the test is <br /> scheduled to begin. <br /> • Sump Cleaning and Preparation. <br /> WPI will steam clean all turbine sumps and dispenser pans. WPI will utilize FM 186 as <br /> an injected additive during steam cleaning. The water and waste generated during the <br /> cleaning process will be left on-site in a labeled drum for proper classification and <br /> disposal. Once the site has been cleaned, it will be ready for testing. <br /> Pagel of 3 <br />