My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO 2002-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 3:50:10 PM
Creation date
11/5/2018 9:14:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2006
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\3250\PR0518288\COMPLIANCE INFO 2002-2006.PDF
QuestysFileName
COMPLIANCE INFO 2002-2006
QuestysRecordDate
7/5/2017 7:22:22 PM
QuestysRecordID
3481896
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Tank Annular Space. <br /> } <br /> For tanks less than 20,000 gallons capacity, apply a vacuum of 10"mercury to annular space. <br /> After establishing a stable vacuum, maintain this vacuum for 60 minutes. At the end of the <br /> test period, if the vacuum reading has not changed from the established test vacuum, the test <br /> is complete and has achieved a"pass". <br /> For tanks greater than or equal to 20,000 gallons capacity, apply a vacuum of 10"mercury to <br /> annular space. After establishing a stable vacuum,maintain this vacuum for 120 minutes. At <br /> the end of the test period, if the vacuum reading has not changed from the established test <br /> vacuum, the test is complete and has achieved a"pass". <br /> If the tank does not maintain the test vacuum, the contractor may re-test the annular space. <br /> If, after the second test the tank does not achieve a "pass", the secondary containment must <br /> be considered not liquid tight. Repairs may be made by the tank manufacturer or authorized <br /> representative per the requirements of the local CUPA. <br /> • Product Piping Secondary Containment. <br /> An inert gas shall be used. The secondary containment shall be made airtight with either the <br /> rubber test boot or fiberglass test fitting installed at time of installation. If the test boot is <br /> missing or damaged, an approved replacement test boot or fiberglass test fitting may be <br /> installed. <br /> Pressurize secondary containment piping to 5 psig and allow to stabilize for 10 minutes. <br /> Maintain test pressure of 5 psig for 60 minutes. At the end of the test period, if the pressure <br /> reading has not changed from the established test pressure, the test is complete and has <br /> achieved a"pass". <br /> If the piping does not maintain the test pressure, the contractor may tighten clamps and <br /> fittings, if necessary, and re-test the piping. If, after the second test, the piping does not <br /> achieve a "pass", the secondary containment must be considered mot liquid tight. Repairs <br /> may be made by the piping manufacturer or authorized representative per the requirements of <br /> the local CUPA. <br /> • Containment Sumps and Under Dispenser Containment. <br /> The containment sump shall be free of dirt, debris and residual petroleum product. Place test <br /> fluid in the sump a minimum of 2-inches above the highest piping penetration. Piping shall <br /> include primary/secondary product piping, vent piping, vapor recovery piping and siphon <br /> piping. It is recommended to place test fluid in the sump a minimum of 2-inches above the <br /> highest penetration, including all electrical penetrations. <br /> After test fluid has stabilized for 30 minutes, the liquid level shall be measured using test <br /> equipment third party tested to below .0007-inches. The test period shall consist of two 15- <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.