My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 3:29:25 PM
Creation date
11/5/2018 9:26:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\3250\PR0518288\BILLING 2013-2015.PDF
QuestysFileName
BILLING 2013-2015
QuestysRecordDate
7/5/2017 11:33:39 PM
QuestysRecordID
3483654
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGRO .ND STORAGE TANK RE. ONSE PLAN <br /> For use by Urrido s Member Agencies or where approved Gv you; Local Arrisdictiorr <br /> Authority Cited: Title 23 CCR, Sections 2�32(d)(2), 1fi34(e), and 2641(!r) <br /> facilit ) <br /> TYPE OF ACTION ® 1-NEW PLAN ❑ 2.CIiANC;E Or 1NFORMATiON (One Former'-- � R01 <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency t1seOnly) -� <br /> FACILITY NAME ---- - <br /> Costco Wholesale Corporation-"a station #658 ROP <br /> FACILITY SITE ADDRESS RDI <br /> rsrra <br /> 3250 West Grant line Road 95377 <br /> H. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> If safe to do so, facility personnel will lake immediate measures to control or stop any release(C.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> D Any release to secondary containment will be pumped or otherwise removed within a lime consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and Clean up manageable spills of hazardous materials. Absorbent material may Ire reused until it becomes too saturated <br /> to be effective. it will then be managed properly.Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. <br /> ➢ Facility personnel will determine whether or not any water removed from secondary containment systems,or frorn clean-up activity.has been in contact with any <br /> hazardous material. if the water is enntaminated, it will he managed as hazardous waste If the water has a petroleum sheen (i.e., rainbow colors), it is <br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc. <br /> will not be disposed to storm water systems. <br /> > We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> I. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment-, <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containmert; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released ptoduct/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is-Fs-led in the facility's Hazardous Materials Business Plan. 'Hris <br /> equipment is inspected at least monthly,and after each use,and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: Complet 71 ly if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIO R20 <br /> R30 <br /> RTI R21. <br /> R31 <br /> R12. R22. - <br /> R12 <br /> R13 R2r <br /> R33 <br /> R14 R24 <br /> R34. <br /> R15 R25 <br /> Rai <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME v) \� ` R40 TITLE R50 <br /> l ' "� i Trac Costco#658 Gas Station Supervisor <br /> NAME. ` R41 TITLE R51 <br /> NAMct 9l t R4P Trac Costco#658 Warehouse Manager <br /> TiTLE, R52 <br /> Dennis Bock Costco Compliance Manager <br /> NAME Rai TITLE R53 <br /> V. INDIRECT HAZARD DETERMINATION <br /> This information is required only when the presence of the hazardoers suhstance can not be determined directly by the monitoring method used(e.g.,where liquid level <br /> measurements in a tank annular space or secondary piping are used as the basis for leak determinatinn). <br /> THE FOLLOWING STEPS WILL BE TAKEN TO DETERMINE THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCF IN TIIE SF.('ONDARY <br /> CONTAINMENT iF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE: <br /> R"O <br /> Confirm proper operation of Veeder Root (monitoring) equipment and if operating correctly then visually Inspect <br /> sump for the presence of gasoline. Repair defective monitoring equipment. <br /> UN-022111-1/3 www.unidoes.rrg Rev. 10/14/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.