My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
575
>
2300 - Underground Storage Tank Program
>
PR0231408
>
REMOVAL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 1:09:33 PM
Creation date
11/5/2018 9:33:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1994
RECORD_ID
PR0231408
PE
2381
FACILITY_ID
FA0003723
FACILITY_NAME
CHEVRON STATION #98632 (INACT)
STREET_NUMBER
575
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21449003
CURRENT_STATUS
02
SITE_LOCATION
575 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\575\PR0231408\REMOVAL 1994.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE WORK HEALTH AND SAFETY PLAN <br /> 1. GENERAL <br /> This Health and Safety Plan has been designed to conform to and/or <br /> exceed guidance standards promulgated by EPA and the California <br /> Department of Health Services, Federal OSHA regulations (29CFR1910. 120) <br /> and CA1/OSHA regulations. Because considerable experienced judgement <br /> must be applied to decisions that will be made while actually working <br /> on site, it is the goal of this plan to provide maximum work efficiency <br /> while maintaining an uncompromisingly safe working environment. This <br /> plan is not a substitute for experienced judgement and direction, or <br /> for common sense during the implementation of the tank and equipment <br /> removal effort or the safety procedures outlined herein. <br /> Golden West will provide services and equipment for the tank and <br /> equipment removal work. Golden West (as well as all subcontractors and <br /> independent contractors) will adhere to the Site Work Health and Safety <br /> Plan. <br /> 2. SITE/WORK DESCRIPTION <br /> A site location map is provided in Figure 1-1. All buried tanks, <br /> lines and contaminated soil, (if any) , will be excavated from the <br /> site. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.