My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
575
>
2300 - Underground Storage Tank Program
>
PR0231408
>
REMOVAL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 1:09:33 PM
Creation date
11/5/2018 9:33:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1994
RECORD_ID
PR0231408
PE
2381
FACILITY_ID
FA0003723
FACILITY_NAME
CHEVRON STATION #98632 (INACT)
STREET_NUMBER
575
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21449003
CURRENT_STATUS
02
SITE_LOCATION
575 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\575\PR0231408\REMOVAL 1994.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 . WORK OBJECTIVE <br /> The overall work objective is to provide for proper and safe <br /> removal of any residual product stock, removal of underground storage <br /> tank(s) and contaminated soil (if any) to achieve proper site closure <br /> in accordance with existing local and state regulations. To achieve <br /> these objectives, the following subordinate objectives must be <br /> accomplished: <br /> o Monitor tank interiors for flammable or explosive <br /> concentrations. <br /> o Provide for safe removal of flammable or combustible vapors <br /> from tanks. — <br /> o Provide for safe tank removal. <br /> o Provide for safe and proper tank disposal . <br /> 4 . SAFETY MANAGEMENT <br /> The field supervisor, Harold Spee]man is the site and safety <br /> officer and will ensure that all personnel comply with all applicable <br /> regulations and requirements of this plan. Due to the various aspects <br /> of the work specific personnel are not assigned to this project at <br /> present. Basic requirements are: <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.