Laserfiche WebLink
IED PROGRAM CONSOLIDATED FOIw <br /> UNDERGROUND STORAGE TANK N O V 09 2011 <br /> MONITORING PLAN- Pae 1 of 2 <br /> 490.1. <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION ENVIRONMENTAL HEALTH <br /> 'LAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. ,SERVI(_`,ES 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1 <br /> BUSINESS NAME(Same as Facility Name or DBA) 3. <br /> Food Mart Gasoline <br /> BUSINESS SITE ADDRESS 2185 Freemont Street 143. 1 CITY Stockton 104. <br /> H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annually,whichever is more frequent.Such work must be performed by qualified personnel.123 CCR§2632,26M,2638,26411 <br /> 490.3x. <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): 490-3b. <br /> III. MONITORING LOCATIONS <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED 123 ccR§2,oz 263x1 490-6 <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) "hthate'all) <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.123 CcR§2632,26341 <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6- <br /> PANEL MAINIUFACTURER: Veeder Root 490-7. MODEL#: TLS 350 490-9' <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-9' MODEL#(s): 794380-420 490-M <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).123 CCR§26431 490-11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14' MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: Ela.CONTINUOUS El b.DAILY/NIGHTLY El c.WEEKLY 490'16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490.17. <br /> PROGRAMMED TESTS: a.0.1 h. ❑ b.0.2 h. ❑ c.OTHER(S 49a1s. <br /> _ ❑ g�P� g�P• P�Y)� a9o•19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION 123 ccR§2646.11 490-20. <br /> El 4.WEEKLY MANUAL TANK GAUGING(MTG)r23 ccR§26451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 . <br /> ❑ 5.TANK INTEGRITY TESTING PER 173 CCR§2643.11 490.2.3. <br /> TEST FREQUENCY: ❑ ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHERS i ago 2,a. <br /> a. (Specify): a90-2,s. <br /> ---- -- -- 490-26. <br /> ❑ 99.OTHER(Specify): 490-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check 0-A <br /> shat 1 <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> (§6j SECONDARY CONTAINMENT IS: ® a.DRY C] b.LIQUID FILLED [:] c.PRESSURIZED E] d.UNDER VACUUM 490.29. <br /> PANEL MANUFACTURER:Veeder Root 490.30. MODEL#: TLS 350 490.31. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32• MODEL#(s): 794380-208 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490-34- <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490.35. <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36- <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.123 CCR§26361 <br /> MELD MANUFACTURER(s):FE-Petro D 490-37. MODEL#(S): MLD 4 <br /> r_1IN <br /> 3.ELECTRONIC LE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.123 CCR§26361 49xW39. <br /> 3a. <br /> ELLD MANUFACTURER(S): 4901. MODEL#(S): 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINDAUM MONTHLY 0.2 g.p-h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490.0-3• <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-44- <br /> -- - - -- 490.45. <br /> ❑ 4.PIPE INTEGRITY TESTING. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS El c.OTHER(specify) 490497. <br /> 490-4a. <br /> ❑ 5.VISUAL PIPE MONITORING. <br /> FREQUENCY: E] a.DAILY Elb.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 4904 9. <br /> •Albwed far,w,g of unburied emergency g fbd piping-Y Er HSC§25281.5 3) <br /> 490-50. <br /> -,] 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.123 CCR§2636(ax3)i <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> --- - 490-52 <br /> [j99.OTHER(Specifl) <br /> 490-53- <br />