Laserfiche WebLink
a AM <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page 2 of 2 <br /> VI. UNDER DISPENSER CONTAINMENT (UDC)MONITORING all <br /> thhatataap It) <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> M 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54a. <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 49154b. <br /> LEAK MONITOR MANUFACTURER:Veeder Root a9ass. MODEL#:TLS 350 4W56., <br /> LEAK SENSOR MANUFACTURER:Veeder Root 49151. MODEL#(S):794380-208 49158. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. M a.YES ❑ b.NO 49159. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. M a.YES ❑ b.NO 4W-60 <br /> FAMURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. M a.YES ❑ b.NO 490-61. <br /> IJDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. M a.YES ❑ b.NO 490-62- <br /> UDC <br /> 90-6'UDC CONSTRUCTION IS: M 1.SINGLE WALL ❑ 2.DOUBLE WALL 490-63 <br /> IF DOUBLE WALL: 490-baa. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHDI THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 4%-""b. <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65- <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.[23 CcR§2644.11 <br /> M 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49066. <br /> M 3. SPILL BUCKETS ARE TESTED ANNUALLY. 490-67. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-68. <br /> M a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> M h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490.691. <br /> EFERENCE DOCUMENTS MAINTAINED AT FACILITY O(Check all that apply) <br /> M THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 49069b. <br /> M OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 49069c. <br /> E CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d- <br /> CALIFORNIA <br /> 90-69dCALIFORNIA UNDERGROUND STORAGE TANK LAW 49069e. <br /> ❑ STATE. WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 49"9f- <br /> STATISTICAL <br /> 90696STATISTICAL INVENTORY RECONCILIATION <br /> M SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-699. <br /> ❑ 490-69h.OTHER(Specify):_ <br /> 490-69i. <br /> M This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71. <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: l.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs_2.)all conditions that indicate ap_ossible release are investigated;and 3.)all monitoring records are maintainedprrope . <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> 19172. TITLE: 49173. <br /> NAME: Operator/Manager <br /> NAME: Dhani Rann Salhan 490-74. TITLE:Assistant 490-75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provideA herein is true and accurate to the best of my knowledge. <br /> PPLICANT SIGNATURE DATE: 490 77" <br /> />{- 1 10/28/2011 <br /> REPRESENTING:0 1.Tank r>V for ❑2.Faciti Owneri atm 0 3.Authorized Rcpmaentafivc of Owner 49176. <br /> APPLICANT NAME(print): �, 490178. APPLICANT TITLE: 490-79. <br /> 4"41,4 J I / �;,-/ c h Operator/Manager <br />