My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
4500
>
2300 - Underground Storage Tank Program
>
PR0231571
>
REMOVAL_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2021 3:50:27 PM
Creation date
11/5/2018 10:09:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1993
RECORD_ID
PR0231571
PE
2381
FACILITY_ID
FA0004031
FACILITY_NAME
MASONRY GROUP, THE
STREET_NUMBER
4500
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
14332001
CURRENT_STATUS
02
SITE_LOCATION
4500 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\4500\PR0231571\REMOVAL 1993.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br />COMMUNITY DEVELOPMENT DEPARTMENT <br />•• � I810 E K42ELTON AVE, STOCKTON. CA 95205 <br />%BA+ DEVELOPMENT SERVICES PHONE 12091 4663120 <br />PLANNING PHONE 12091 4683120 <br />BUILDING PHONE 12091468-3123 <br />NEIGHBORHOOD PRESERVATION PHONE 12091 4683021 <br />BACKFILL EXCAVATION CERTIFICATE <br />Project Location --500 e. F�EMI�NT ST ST OCKTON, CA �752/S <br />Owner <br />Phone No. 209 - 94848/ 7 <br />Contractor WESTE A MF7,45�02 SV(,_,Phone Pto. qZ� �C4 <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />1. Submission of Soil Engineer's Compaction Report within 30 days of project <br />completion, or <br />2. Submission of verification, e.g. load ticket, within 30 clays of project <br />completion that one of the following materials was placed in the excavation in <br />12•' lifts: <br />A. Pea gravel - smooth, rounded material not more than one-half (1/2) <br />inch in diameter. <br />B. Crushed rock - self -compacting material not more than three-quarters <br />(3/4) inch in cross sectional measurement. (Use of crushed rock <br />will not be permitted for backfill if contact will be made between <br />the backfill material and tanks/pipes made of poly resin glass or <br />similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days <br />of project completion, or submission of verification that the select material described above <br />will be placed at a minimum of five (5) cubic yards per 1000 gallon tank, displacement and <br />that the entire excavation will be backfilled and compacted to insure compliance with the <br />Uniform Building Code Appendix Chapter 70. <br />* l'LnnlARN cgls> <br />Name (Print) <br />�71Ems_ U PT. <br />T tle (Print <br />fi In <br />f-gn2fture <br />* Shall be the responsible managing employee on the license or authorized <br />agent. ; <br />6/91-LC/BECERT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.