My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
4201
>
2300 - Underground Storage Tank Program
>
PR0516300
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2021 2:39:35 PM
Creation date
11/5/2018 10:12:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0516300
PE
2381
FACILITY_ID
FA0001198
FACILITY_NAME
TURNER STATION
STREET_NUMBER
4201
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20103019
CURRENT_STATUS
02
SITE_LOCATION
4201 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRENCH CAMP\4201\PR0516300\REMOVAL 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLING PROTOCOL FOR ROUTINE TANK REMOVALS <br /> hall be <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected sinvert(tank,s bottom) eet. If <br /> a collection <br /> representative of native soils beneath <br /> t�an Unauthorized Release Notification muse bth e compl ted and subfmitted within five(5) <br /> contamination is documented during clos <br /> working days pursuant to California Health&Safety Code, Section 25295. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> TANK TANK SIZE of SOIL SAMPLES <br /> p (Gallons) <br /> < 1,000 <br /> 1 er Tank Fill OR Pum End of Tank <br /> �.- 1,000 - 10,000 <br /> 2 r Tank 1 at each End of Tank <br /> 3 or More Ends and Middle OR generally <br /> > 10,000 spaced along the length of the Tank <br /> per Tank <br /> PIPING AND STOCKPILE <br /> EE11PIPING SOIL SAMPLES 1 Sam le eve 20 lineal fee[ <br /> TANK&PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yazds <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL aflW ER SAMPBLES <br /> y (Gallons) ' <br /> of SOIL SAMPLES SAMPLES <br /> < 10,000 2 from wall next to tank I <br /> 3 ends at soil/groundwater <br /> Single Tank interface& 1 below tank <br /> 4 from wall next to tank <br /> > 10,000 OR ends at soil/groundwater I <br /> Tank Cluster 5 or more interface & 1 below each <br /> tank <br /> SLAB PRESENT IN THE TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order to <br /> conditions.) <br /> collect the samples. (Physical removal of the obstruction will allow sampling according to the above <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLES <br /> y (Gallons) of SOIL SAMPLES <br /> < 1,000 3 er Tank Center and Ends OR Sides of Tank <br /> 1,000 - 10,000 5 er Tank Center and Ends OR Sides of Tank <br /> 5 OR More per Tank Ends and Middle and generally spaced <br /> > 10,000 along the length of the Tank <br /> EH 23 046 (Revised 08/13/99) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.