My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2006 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
5777
>
2300 - Underground Storage Tank Program
>
PR0505746
>
BILLING 2006 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2021 10:20:42 PM
Creation date
11/5/2018 10:16:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2006 - 2012
RECORD_ID
PR0505746
PE
2361
FACILITY_ID
FA0006977
FACILITY_NAME
76 EXPRESS TIGER NO 1
STREET_NUMBER
5777
Direction
S
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
19302037
CURRENT_STATUS
01
SITE_LOCATION
5777 S FRENCH CAMP RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRENCH CAMP\5777\PR0505746\BILLING 2006 - 2012.PDF
QuestysFileName
BILLING 2006 - 2012
QuestysRecordDate
2/13/2018 7:47:07 PM
QuestysRecordID
3792345
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED F <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Pae I of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490.1 <br /> PLAN TYPE Erl.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490'2 <br /> ,t- <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) I I I - - 1 <br /> BUSINESS NAME(Same as FACILITY NAME) 3. <br /> SSS �t,C u'�. <br /> BUSINESS SITE ADDRESS 71 S r ffl�(1/1 1°3. CITY �OC_r� 104. <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> (23 CCR 2632,2634,2638,2641 <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 4990.3b <br /> III.MONITOnDLC LOCATIONS <br /> 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. .SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49o-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: a DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> PANEL MANUFACTURER: Ve ko a 490-7, MODEL#: 'rL3 1 V 490-8 <br /> LEAK SENSOR MANUFACTURER: Jr 490 9. MODEL#(S): fW* d 2-0 490.10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK6).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 49046 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> 490-18 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: E] a.36HOURS ❑ b.60 HOURS 4�,2 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY [:1b.BIENNIALLY Elc.OTHER(Specify): 49900--25 <br /> El99.OTHER (Specify): 490-26 <br /> 0-90-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 49628 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:PCDRY ❑b.LIQUID FILLED ❑c.PRESSURIZED Od.UNDER VACUUM 49629 <br /> PANEL MANUFACTURER: vvkf 0-9630 MODEL#: 49631 <br /> LEAK SENSOR MANUFACTURER: - Vo-aj pIr 49632 1 MODEL#(S): 2,1 49633 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. a.YES ❑b.NO 49634 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Ka.YES ❑b.NO 49635 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PER ORMS 3.0 g.p.h.LEAK TESTS A D RE T [CTS OR SHUTS OF� <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 2636 C {O .D+ <br /> MLLD MANUFACTURER(S): 1 Ct� 49637 MODEL#(S): 11 49638 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTO JELLDr)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) LJ <br /> _ ELLD MANUFACTURER(S) 490-40, 1 MODEL#(S): 490-41 <br /> PROGRAMMED IN LINE LEAK TE I'M-NIMUNk MONTHLY 0.2 g p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a YES ❑b.NO 490-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a YES ❑b.NO 4901'4 <br /> ❑ 4.PIPE INTEGRITY TESTING 49o-45 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 4904649047 <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 490-49 <br /> •Allowed for monitoring of unburied mergaicy genermor fuel piping onl HSC 25281.5 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ 99.OTHER(Specify) 49652 <br /> 49653 <br /> I TO r r I ICT T I I'I MAA91 1 1A <br />
The URL can be used to link to this page
Your browser does not support the video tag.