My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 3:22:51 PM
Creation date
11/5/2018 10:21:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2017
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0231604\COMPLIANCE INFO.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d <br /> F. In-Tank Gauging/SIR Equipment: ® Check this box'rftank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is instal" 0 3 2016 <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: - <br /> Yes _ No` Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> i Yes 1, No' Was accuracy of system product level readings tested? <br /> Yes No' Was accuracy of system water level readings tested? <br /> n Yes ❑ No' Were all probes reinstalled property? <br /> Yes " No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> `In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): F- Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ® Yes C No' For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> ❑ N/A that apply) Simulated leak rate: m 3 g.p.h.; n 0.1 g.p.h; n 0.2 g.p.h. <br /> ® Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes C No' Was the testing apparatus properly calibrated? <br /> ® Yes .. No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> u Yes J No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ® N/A <br /> Yes ^ No' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> ® NIA disconnected? <br /> ❑ Yes a No' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ® N/A fails a test? <br /> _ Yes - No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> ® Yes - No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 12107 <br /> a 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.