Laserfiche WebLink
D. Results of Testing/Servicing JUN 0 3 2016 <br /> Software Version Installed: 15.08 " new"E�r <br /> Complete the followinjj checklist: <br /> ® Yes , No` Is the audible alarm operational? <br /> ® Yes i No' Is the visual alarm operational? <br /> ® Yes n No' Were all sensors visually inspected,functionally testedand confirmed operatlonal? <br /> ® Yes C No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not Interfere with their <br /> nmrmtr o ration? <br /> ❑ Yes C No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> ® WA <br /> ® Yes Nc' For pressurized p9ing systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br /> WA detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shutdown? (Check all that apply) <br /> ® Sump/rrench Sensors; ® Dispenser Containment Sensors- Did you confirm positive shut-down due to leaks and sensor <br /> failureldisconnec8an? ®Yes; _No. <br /> ❑ Yes - No' For lank systems that utilize the monitoring system as the primary tank overfill warning device(i.e. no mechanical overfill prevention <br /> ® WA valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? If so,at what percent <br /> of tank ca a ' does the alarm trigger? % Flappers <br /> U <br /> Yes' ® No Was any monitoring equipment replaced? If yes, identity specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ® Yes' J No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)C Product; I@ Water. If <br /> es,describe causes in Section E.below. <br /> ® Yes i No` Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,If applicable <br /> ® Yes No' Is ail monitoring equipment operational per manufacturer's specifications? <br /> 'In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Small amount of water was in 87 sump and dispenser 1 & 2 3&4 UDC all was removed. NOTE: All AST diesel sumps& <br /> UDC's have some water informed manager water needs to be removed. <br /> Monitoring System Certification Page 2 of 4 12107 <br /> 2 2/21/07 <br />