My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 3:22:51 PM
Creation date
11/5/2018 10:21:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2017
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0231604\COMPLIANCE INFO.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page_of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ®Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: ®Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used: PRESSURE GAUGE IN PSI NITROGEN Equipment Resolution: 1/10—15 PSI <br /> "FiberglassFiberglass <br /> iping Run# Piping Run# Piping Run# <br /> EGULAR E.TRANS SUMP WEST SUMP <br /> Piping Material: MD!esclDiesel <br /> erglassPiping Manufacturer: mith ithPiping Diameter: "Length of Piping Run: 08 <br /> Product Stored: Premium gas Unleaded gas selMethod and location of Test boot STP to Test boot STP to st Boot E.Sump to <br /> piping-run isolation: UDC UDC AST's W.Sum <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min. 15 min. 15 min. 15 min. <br /> starting test <br /> Test Start Time: 7:45 7:45 12:30 11:00 <br /> Initial Reading(R): 3 PSI 3 PSI 3 PSI 3 PSI <br /> Test End Time: 8:45 8:45 1:30 12:00 <br /> Final Reading(RF): 3 PSI 3 PSI 3 PSI 3 PSI <br /> Test Duration: 1 hr 1 hr 1 hr 1 hr <br /> Change in Reading(RrR,): 0 0 0 0 <br /> Pass/Fail Threshold or Pass Pass Pass Pass <br /> Criteria: <br /> Test Result: ® Pass 0 Fail ® Pass ❑Fail ® Pass 0 Fail ® Pass 0 Fail <br /> COMMents (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> R <br /> MAR 0 6 201 <br /> ENVIRONMENTAL HEALT <br /> DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.