My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 3:22:51 PM
Creation date
11/5/2018 10:21:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2017
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0231604\COMPLIANCE INFO.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page_of <br /> 7. UNDER-DISPENSER CONTAINMENT C TESTING <br /> Test Method Developed By: 0 UDC Manufacturer N Industry Standard ®Professional Engineer <br /> U Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum N Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: CALDWELL LEVEL CHANGE INDICATOR Equipment Resolution: .002 <br /> UDC#9A&10 A UDC#106&11B UDC#11A& 12A UDC#13A&14A <br /> UDC Manufacturer: SMITH SMITH SMITH SMITH <br /> UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS <br /> UDC Depth: 36 IN 36 IN 36 IN 36 IN <br /> Height from UDC Bottom to Top 9 IN 10 IN 10 IN 10 IN <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 6 IN 61N 6 IN 6 IN <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to WET/DIRTY WET/DIRTY DRY/DIRTY WETIDIRTY <br /> testing; <br /> Portion of UDC Tested 12 IN 12 IN 12 IN 12 IN <br /> Does turbine shut down when <br /> UDC sensor detects liquid(bothN Yes 0 No DNA N Yes DNo DNA N Yes 0N DNA N Yes ONo DNA <br /> product and water? <br /> Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SEC <br /> Is system programmed for fail- <br /> safe shutdown?" N Yes 0 No DNA N Yes DNo DNA N Yes ONo DNA N Yes U No DNA <br /> Was fail-safe verified to be N<<es ONo 0N 1!?Ves ONo DNA 15kYes ONo DNA 4Wes ONo DNA <br /> operation 1?* <br /> Wait time between applying 5 min 5 min 5 min 5 min <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: 5:00 am 8:00 am am am <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time: 8:30 8:30 <br /> Final Reading(R,): 001 .001 .001 .001 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Chane in Reading(RF-RO: 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 min .005/30 min .005130 min .005/30 min <br /> Test Result: N Pass D Fail N Pass D Fail N Pass D Fail N Pass D Fail <br /> Was sensor removed for testing? I N Yes 0 No O NA N Yes D No O NA N Yes D No O NA N Yes D No D NA <br /> Was sensor properly replaced and WYes ONo [INA d'Yes DNo DNA NXes ONo DNA 4�Yes DNo DNA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing and recommended fallow-up for failed tests) <br /> QC <br /> pllAR n r 9017 <br /> fVIR&4MENMhL HFAI TH <br /> ^ERARTMENT <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.