My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 3:22:51 PM
Creation date
11/5/2018 10:21:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2017
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0231604\COMPLIANCE INFO.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> SWRCB,January 2002 Page_0f- <br /> 9. <br /> f_9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: H2O,TAPE MEASURE Equipment Resolution: 1/16 <br /> Spill Box#REG Spill Box#PREM Spill Box# Spill Box# <br /> Bucket Diameter: it IN 11 IN <br /> Bucket Depth: 13 IN 15 IN <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 9:00 9:00 <br /> Initial Reading(R4): 10% 12'/1 <br /> Test End Time: 10:00 10:00 <br /> Final Reading(RF): 10% 12%1 <br /> Test Duration: 1 HR 1 HR <br /> Change in Reading(RF-N: 0 0 <br /> Pass/Fail Threshold or PASS PASS <br /> Criteria: <br /> Test Result: ® Pass ❑Fail ® Pass ❑Fail ❑ Pass 0 Fail ❑ Pass '!❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> _ry a— <br /> SAAR 06 2017 <br /> ENVIRONMENTAL MENTGI HFA TI-I <br /> -DEPART-MFNT <br />
The URL can be used to link to this page
Your browser does not support the video tag.