Laserfiche WebLink
i <br /> SWRCB,January 2002 Page_0f- <br /> 9. <br /> f_9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: H2O,TAPE MEASURE Equipment Resolution: 1/16 <br /> Spill Box#REG Spill Box#PREM Spill Box# Spill Box# <br /> Bucket Diameter: it IN 11 IN <br /> Bucket Depth: 13 IN 15 IN <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 9:00 9:00 <br /> Initial Reading(R4): 10% 12'/1 <br /> Test End Time: 10:00 10:00 <br /> Final Reading(RF): 10% 12%1 <br /> Test Duration: 1 HR 1 HR <br /> Change in Reading(RF-N: 0 0 <br /> Pass/Fail Threshold or PASS PASS <br /> Criteria: <br /> Test Result: ® Pass ❑Fail ® Pass ❑Fail ❑ Pass 0 Fail ❑ Pass '!❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> _ry a— <br /> SAAR 06 2017 <br /> ENVIRONMENTAL MENTGI HFA TI-I <br /> -DEPART-MFNT <br />