Laserfiche WebLink
�., DATE — OZ <br /> VOW PR# <br /> PAGE <br /> PUBLIC HEALTH SERVICES SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION <br /> 304 E. Weber Ave., Third Floor, Stockton, CA 95202 <br /> (209) 468-3420 <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT <br /> Facility Name ►IMtt) Facility Address I O Z- '�-- ret z'c i <br /> Facilty Contact � i+fc, — Title cP - Phone # <br /> UST# Product UST#aProduct UST# Product UST# Product <br /> Overfill Prevention: -1 Audible/Visual L, I echanical Monitoring Panel: (J L S 3 D <br /> Piping System: C! Gravity t-Pressure F Suction Violations: inor ❑ Major <br /> Automatic Pump Shut Dgwn Satisfies CCR 2636 (g): ii-YIes ❑ No Dispenser Pan: C-Y-es Li No <br /> INSPECTION TYPE: F outine -Vonitoring Certification Complaint ❑install LiRemoval ORepair/Upgrade <br /> COMPANY NAME: .] TECHNICIAN NAME: — (,;,),T( PHONE: 6, <br /> VIOLATIONS) <br /> The above facility is not in compliance with the following section(s) of Health & Safety Code (HSC) and/or <br /> California Code of Regulations (CCR): <br /> 1 HSC 25284 Permit to operate 19 CCR 2712 (i) Monitoring & response plan <br /> 2 CCR 2637 Secondary cont testing (6 is on site <br /> month/36 month) 20 CCR 2712 (b) Maintenance & monitoring <br /> 3 CCR 2711(b) & (c) Current State Forms A& B records <br /> 4✓HSC 25292.2 Certification of financial 21 CCR 2636 (f)(4) Annual line tightness test <br /> responsibility and letter from 22 CCR 2630 (d) Annual line leak detector test <br /> chief financial officer 23 CCR 2630 (d) Annual monitoring <br /> 5 CCR 2630 (d) Continuous monitoring certification <br /> system for UST system 24 CCR 2643 (d) Daily monitoring of suction <br /> 6 CCR 2636 (c)(1) All releases in secondary piping that is not <br /> piping flow to a collection continuously monitored <br /> sump 25 CCR 2643 (d) Triennial tightness test of <br /> 7 HSC 25291 (e) Water in secondary (20) cont suction piping that is not <br /> 8_ V HSC 25291 (f) Automatic line leak continuously monitored <br /> detector(s) 26 CCR 2643 (e) Biennial tightness test of <br /> 9 CCR 2636 (f)(1) Continuous monitoring gravity piping that is not <br /> system for underground continuously monitored <br /> piping 27 CCR 2662 Upgrade requirements for <br /> 10 CCR 2632 (c)(2) Continuous monitoring UST system <br /> system for UST 28 CCR 2661 Permit to repair UST system <br /> 11 HSC 25291(a)(2) Secondary containment for 29 HSC 25286 (a) Permit to alter monitoring <br /> UST is tight system <br /> 12 CCR 2636 (f)(1) Continuous monitoring 30 HSC 25298 (a) Illegal abandonment of UST <br /> system for dispenser system system <br /> 13 CCR 2635 (b)(1) Spill container 31 HSC 25298 (b) Permit to temporarily close <br /> 14 CCR 2635 (b)(2) overfill prevention system UST system <br /> 15 CCR 2631 (a) Primary containment is 32 HSC 25298 (c) Permit to close UST system <br /> product-tight 33 HSC 25291 (e) Water in 20 cont analyzed <br /> 16 HSC 25292.1 UST system is operated to and properly disposed of <br /> prevent unauthorized release 34 CCR 2640 (e) Single wall component within <br /> 17 CCR 2650 Recording/reporting 1000' of Public Well, no ELD <br /> unauthorized release 36 CCR 2635(a)(2)(A) Cathodic protection testing <br /> 18 CCR 2632 (d) Monitoring & response plan 35 Violation(s) not listed above <br /> EHD INSPECTO �' „i PHONE: <br /> RECEIVED BY: TITLE: PHONE: /2 A` f <br /> l6J ) ' j - , <br />