Laserfiche WebLink
Underground-pressurized piping, which meets all the (4) following <br /> requirements, satisfies the annual tightness test: <br /> 1. Continuous Monitoring of secondary containment <br /> 2. System is connected to an audible and visual alarm system. <br /> 3. Pump is shut down and alarm system is activated when release detected. <br /> 4. Pumping system shuts down automatically if the monitoring system fails <br /> or is disconnected. <br /> The system at Jimco meets these requirements. <br /> The system in place and tested by your department meets all the requirements <br /> as established by the SWRCB regulation and therefore, neither mechanical leak <br /> detectors nor annual tank precision testing is required of this site. I have <br /> enclosed a copy of the regulation with this correspondence. <br /> F <br /> !ii <br /> nt'— Operations <br /> Attachments: <br /> Cc: Dan Koch �tC <br /> Olympian — Environmental Officer <br /> Hiram Duncan <br /> Jimco - Manager <br />