Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: Tank Manufacturer lndustry Standar Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuun Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Tank# Tank# Tank# Tank# <br /> Is Tank Exempt From Testing?' Yes Yes No Yes No Yes No <br /> Tank Capacity: l,OV <br /> Tank Material: 011 Y <br /> Tank Manufacturer: VO'(,Op)N <br /> Product Stored: <br /> Wait time between applying 2 V1 N <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 42: 40 <br /> Initial Reading(Rj): S7 R& <br /> Test End Time: 1,qO <br /> Final Reading(RF): G_"& <br /> Test Duration: 11-100K <br /> Change in Reading(RF-R,): 1-f D V <br /> PasslFail Threshold or Criteria: {�j- <br /> Test Result: ass ❑Fail ❑ Pass ❑Fail ❑ Pass 0 Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? s No NA Yes No NA Yes No NA Yes No NA <br /> Was sensor properly replaced and � s No NA Yes No NA Yes No NA Yes No NA <br /> verified functional after testing? �" <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23,Section 2637(x)(6)} <br />