My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_1998 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 3:20:17 PM
Creation date
11/5/2018 10:22:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2004
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0231604\COMPLIANCE INFO 1998 - 2004.PDF
QuestysFileName
COMPLIANCE INFO 1998 - 2004
QuestysRecordDate
11/29/2017 11:11:14 PM
QuestysRecordID
3738035
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 N. <br /> Page of <br /> 5. SECONDARY PIPE TESTING -� <br /> f Test Method Developed By: Piping Manufacture Industry Standard Professional Engineer <br /> Other p city) <br /> Test Method Used: Pressur Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# Piping Run# Piping Run # Piping Run# <br /> Piping Material: 'T-'be ft <br /> Piping Manufacturer: e,Mt <br /> Piping Diameter: Ll 2 iN <br /> Length of Piping Run: <br /> Product Stored: {�S <br /> Method and location of <br /> i in -run isolation: �[oMMEtJ <br /> Wait time between applying S�� <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: (f1:10 <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-&): I <br /> Pass/Fail Threshold or 5 f <br /> Criteria: <br /> Test Result: Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑ Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-u or failed tests) <br /> -4(- OP.(-Zvw ES emA Tc-e oq ew In5 <br /> -P_'��_ �K• -i Salm w.,�/ Es-Ir b�cxt's <br />
The URL can be used to link to this page
Your browser does not support the video tag.