Laserfiche WebLink
SWRCB, January 2002 N. <br /> Page of <br /> 5. SECONDARY PIPE TESTING -� <br /> f Test Method Developed By: Piping Manufacture Industry Standard Professional Engineer <br /> Other p city) <br /> Test Method Used: Pressur Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# Piping Run# Piping Run # Piping Run# <br /> Piping Material: 'T-'be ft <br /> Piping Manufacturer: e,Mt <br /> Piping Diameter: Ll 2 iN <br /> Length of Piping Run: <br /> Product Stored: {�S <br /> Method and location of <br /> i in -run isolation: �[oMMEtJ <br /> Wait time between applying S�� <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: (f1:10 <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-&): I <br /> Pass/Fail Threshold or 5 f <br /> Criteria: <br /> Test Result: Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑ Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-u or failed tests) <br /> -4(- OP.(-Zvw ES emA Tc-e oq ew In5 <br /> -P_'��_ �K• -i Salm w.,�/ Es-Ir b�cxt's <br />