Laserfiche WebLink
SWRCB,January 2002 _ Page of <br /> 9. SPILL/OVER.FILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(Specify) <br /> Test.Equipment Used: Equipment Resolution: <br /> Spill Box# Spill Box # Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying —FTA 'NU V-�C _ <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 101-00 <br /> Initial Reading(Rj): SEC- COMwI <br /> Test End Time.- <br /> Final <br /> ime:Final Reading(RF): 6,416+1 <br /> Test Duration: 12, vtou <br /> Change in Reading(Rr-Rt): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: CJ Pass ❑Fail ❑ Pass ❑Fail C1 Pass [] Fail ❑ Pass [] Fail <br /> Comments—_(include information on repairs madeprior to testing, and recommendedfollow-u forfailed tests) <br /> WA w a b %j N <br /> SDN •voo u id qok 9ASS o ice+ He <br /> IC'���5 bVG�CE� S^��•L� p{;s'�IJy 'P,A►SS ��( �uG{C�-}= - <br />