My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_1998 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 3:20:17 PM
Creation date
11/5/2018 10:22:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2004
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0231604\COMPLIANCE INFO 1998 - 2004.PDF
QuestysFileName
COMPLIANCE INFO 1998 - 2004
QuestysRecordDate
11/29/2017 11:11:14 PM
QuestysRecordID
3738035
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 `r Page of <br /> 7. UNDER-DISPENSER C©NTAINM T UDC T TING <br /> Test Method Developed By: UDC Manufacturer IndustryStandard Professional Engineer <br /> Other(Spec) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Equipment Reso ution: <br /> UDC# l UDC# UDC#L/& UDC# & <br /> UDC Manufacturer: ;..3 YY rljt- <br /> UDC Material: � <br /> UDC Depth: qZ h v� <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: <br /> � <br /> Height from UDC Bottom to �Z <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: 01+, oh e <br /> Portion of UDC Tested <br /> Does turbine shut down when / <br /> UDC sensor detects liquid(both es No NANo NA �'es No NA Yes No NA <br /> roduct and water)?* <br /> Turbine shutdown response time ffw cvrAMEVAS <br /> Is system programmed for fail- yok, No NA No NA 1Y9 No NA No NA <br /> safe shutdown?' <br /> Was fail-safe verified to be yes No NA Ves No NA es No NA es No NA <br /> operational?* <br /> 7- 1� <br /> Wait time between applying <br /> pressure/vacuum/water and -Z�Ivl.t`vvtz <br /> starting test <br /> Test Start Time: I r .02 l{ 31 }I • 4 1 'o t{ <br /> Initial Reading(Rj): p a d p <br /> Test End Time: 1% :d 11 t 1 q ' t 1,6 <br /> Final Reading RF : 600 rvi,C ►s M i c NS U M i"c K6►�5 <br /> Test Duration: & &yyr ,Ij\j4AFS 19 m i t4 t1+x-:s C!m '"v+M <br /> Change in Reading(RF-Rj : w,,P4 N,6 m;tj ° srv%Ct 1-j le <br /> Pass/Fail Threshold or Criteria: j'GKUW � s -7qM14KOw 7N YA f c lw,,J <br /> Test Result: Fail ss Fail .Jrabs Fail ass Fail <br /> Was sensor removed for testing? s No NA No NA No NA A' No NA <br /> Was sensor properly replaced and es No NA )4 No NA es No NA No NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommended allow-u or ailed tests) <br /> jLV"r OXi rll VDC i s b s r�N � ,{ 12 SSC Q�rp�S <br /> If the entire depth of the UDC is not tested, specify how much was tested. If the answer to My of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.