My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_1998 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 3:20:17 PM
Creation date
11/5/2018 10:22:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2004
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0231604\COMPLIANCE INFO 1998 - 2004.PDF
QuestysFileName
COMPLIANCE INFO 1998 - 2004
QuestysRecordDate
11/29/2017 11:11:14 PM
QuestysRecordID
3738035
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 ... `' , <br /> Page of <br /> 7. UNDER-DISPENSER CONTAINMENT TING <br /> Test Method Developed By: UDC Manufacturer Industry Standard 7Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> UDC# 10 UDC# tit iZ. UDC ili -118"C# n ! <br /> UDC Manufacturer: 4o p W itJMTN <br /> UDC Material: iA&t�C. <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: `7 r, 4 �'Ij S <br /> Condition of UDC prior to <br /> testing- R <br /> Portion of UDC Tested ? lq�nft PRctv1 <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both No NA No NA Y<__—No NA ,Y9 No NA <br /> product and water)?* / <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown?` es No NA No NA No NA Y9 No NA <br /> Was fail-safe verified to be -v—.--operational?* No NA lv No NA No NA , No NA <br /> Wait time between applying t <br /> pressure/vacuum/water and �1M1 i U+1'['sv S Z v%Ati'NvA <br /> starting test <br /> Test Start Time: :36 t o- �o <br /> Initial Reading(R,): d © 40 a <br /> Test End Time: SU : I& to ' 'iS 42 4l <br /> Final Reading(RF): Z M ICRO o-S ([> M i GRe►-S nn G+Ro"s 2.1 w.;a 'ev2s <br /> Test Duration: f0 YvliNutee Ct wl +-6-S it,V,% ,(a„wti ,v}mss <br /> Change in Reading(RF-Ri): ZLl MiCK60 v yv%,i CKOMSg-as.sS <br /> Vim:c v►a5 Z`i vh�C <br /> Pass/Fail Threshold or Criteria: -1 en icfcbw S -7 ee"PS -71 w„'C4<o►a—S T11*n,'C1en1I's <br /> Test Result: ass ❑Fait Pass ❑Fail Pass ❑Fail ,'Pass ❑Fail <br /> Was sensor removed for testing? 3.esr No NA No NA es No NA <br /> , No NA <br /> Was sensor properly replaced andNo NA No NA No NA No NA <br /> verified functional after testing? <br /> Comments—(include information on re airs made prior to testing, and recommended oHow-up for failed tests) <br /> E S�A i ' (:�C_ tl- g VzJC SE1,-3sart. RP-E! b�-iwET-mN <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to aM of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested, (See SWRCB LGA 60) <br />
The URL can be used to link to this page
Your browser does not support the video tag.