My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_1998 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 3:20:17 PM
Creation date
11/5/2018 10:22:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2004
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0231604\COMPLIANCE INFO 1998 - 2004.PDF
QuestysFileName
COMPLIANCE INFO 1998 - 2004
QuestysRecordDate
11/29/2017 11:11:14 PM
QuestysRecordID
3738035
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer ndustry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(.Sped) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# Spill Box#!E7 Spill Box# Spill Box# <br /> Bucket Diameter: 131, <br /> Bucket Depth: l <br /> Wait time between applying 1 <br /> pressure/vacuum/water and AA <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rj): © G <br /> Test End Time: <br /> Final Reading(RF): Wl1C u <br /> Test Duration: �pY4,�yti,r �- w^1 <br /> Change in Reading(RF-RI): l 3,ntii I J 12 r+��`►o <br /> Pass/Fail Threshold or <br /> Criteria: lm lesnvo <br /> Test Result: Pass Fail PkKs-� Fail Pass Fail Pass Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> P�I t Rox # 1 S oIfGrAt'y m I. 0+ LAS w P- 11wiEL d9,0 0" <br /> Sp�7� Sol 4L is Q�4v1it(Z _. <br />
The URL can be used to link to this page
Your browser does not support the video tag.