My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
816
>
2300 - Underground Storage Tank Program
>
PR0231470
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 2:09:29 PM
Creation date
11/5/2018 10:33:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231470
PE
2361
FACILITY_ID
FA0003911
FACILITY_NAME
VAN DE POL ENTERPRISES INC
STREET_NUMBER
816
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102010
CURRENT_STATUS
01
SITE_LOCATION
816 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\816\PR0231470\COMPLIANCE INFO\2016 - PRESENT.PDF
QuestysFileName
2016 - PRESENT
QuestysRecordDate
9/22/2016 7:01:58 PM
QuestysRecordID
3006673
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.siclov.orglehd <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> VAN DE POL ENTERPRISES INC 816 E FRONTAGE RD, RIPON January 19, 2018 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS ll,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 107 CCR 2632(d)(1)(C) Plot plan/site map not submitted or failed to completely show where monitoring is performed. <br /> An accurate UST Monitoring Site Plan was not submitted.The UST Monitoring Site Plan uploaded to CERS an <br /> 10/19117 incorrectly indicates that sensors are located in the 81, 91, and diesel fill sumps.There are no sensors in <br /> the fill sumps. Also,the site plan has T1 labeled as Diesel Tank,T2 as Premium Tank, and T3 as Regular Tank, <br /> while the Veeder Root system set up labels T1 as the Regular(87)Tank, T2 as the Premium (91)Tank, and T3 as <br /> the Diesel Tank. Correct the tank labels on the site map to match the Veeder Root system set up labels.A site plan <br /> must be submitted identifying the locations where monitoring will be performed. Immediately log into the California <br /> Environmental Reporting System(CERS)at httpalcers.calepa.ca.gov/and upload a copy of the UST Monitoring Site <br /> Plan. <br /> This is a minor violation. <br /> 113 CCR 2638(d) Failed to submit monitoring system certification test report within 30 days. <br /> A monitoring system certification, leak detector testing, and spill container testing were performed on 1/2512016. A <br /> test report has not been submitted to the EHD or the California Environmental Reporting System (CERS). A copy <br /> of the test report must be submitted within 30 days of the test. Immediately provide this report to the EHD. <br /> This is a minor violation, <br /> 121 CCR 2712(f) Failed to submit a written response within 30 days of receiving an inspection report. <br /> Inspections were last done on 1/31/2017 and 1/2512016 and inspection reports were issued identifying information <br /> to be submitted to bring this site into compliance. This information was required to be submitted by 30212017 and <br /> 2124116, respectively.This information has not been received resulting in a non-compliant status for this facility. An <br /> operator that receives an inspection report shall have 30 days to submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. Ensure that a <br /> written response documenting corrective actions taken or proposed is submitted within 30 days of receiving an <br /> inspection report. <br /> The following violations remain open from the 2017 inspection: <br /> 204-Current monitoring plan approved by the EHD not found on site. Corrected during 1119!2018 inspection. <br /> 210-Designated operator monthly inspection reports not maintained on site for at least 12 months. Corrected <br /> during 1/1912018 inspection. <br /> 306-Monitoring equipment is not installed or maintained to detect a leak at the earliest opportunity. <br /> 313-Failure to construct, operate, and maintain primary containment as product-tight. <br /> The following violation remains open from the 2016 inspection: <br /> 314-Primary containment not tight(pre-Jul 2003). <br /> This is a Class II violation. <br /> FA0003911 PR0231470 SCOW 01119!2018 <br /> EHD 23-01 Rev.09122116 Page 4 of 8 Underground Storage Tank Program CIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.