My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1209
>
2300 - Underground Storage Tank Program
>
PR0232264
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 4:58:34 PM
Creation date
11/5/2018 11:13:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0232264
PE
2381
FACILITY_ID
FA0003808
FACILITY_NAME
JIFFY LUBE #1478
STREET_NUMBER
1209
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818032
CURRENT_STATUS
02
SITE_LOCATION
1209 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\1209\PR0232264\REMOVAL 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERSONNEL ORGANIZATION STRUCTURE <br /> A. PROJECT MANAGER: KEVIN POST <br /> HEALTH & SAFETY RESPONSIBILITIES: <br /> Ensure that site supervisor and safety officer follow this SSP. Oversee <br /> safety of project. May impose procedures to enhance on-site safety. <br /> B. SITE SUPERVISOR: KEVIN POST <br /> HEALTH & SAFETY RESPONSIBILITIES: <br /> Ensure that SSP is followed. Enforce on-site safety and general work <br /> rules. Ensure that safety equipment and PPE is on-site and being used as <br /> / needed. <br /> / C. SITE SAFETY OFFICER: KEVIN POST <br /> HEALTH & SAFETY RESPONSIBILITIES: <br /> Same as above. <br /> FACILITY BACKGROUND AND WORK PLAN <br /> A. FACILITY DESCRIPTION: <br /> JIFFY LUBE/OIL CHANGING FACILITY <br /> B. OBJECTIVES OF URSA ENGINEERING: <br /> The purpose of this work is to remove existing Underground Storage <br /> Tank. <br /> C GENERAL SURROUNDINGS: <br /> The site is level and paved with asphalt/concrete <br /> D. SITE MAP: <br /> Attached at end of this Site-Safety plan. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.