Laserfiche WebLink
A B C D E F <br /> GENERAL NOTES <br /> S P I L L C 0 N T A I N M E N T 5 U M P S P I L L 8 0 N T A I N M E N T S U M P 1. ALL UNUSED TANK OPENINGS SHALL BE TIGHTLY <br /> SECURED WITH PIPE PLUG. INSTALLED IN ACCORDANCE <br /> WITH MANUFACTURERS SPECIFICATIONS. <br /> —•- 16 4" STEEL PLUG (TYP) 2. ALL LOCKABLE CAPS SHALL HAVE PADLOCKS KEYED <br /> 3"x24" M x FEMALE FLEXING CONNECTOR (2 TYP) <br /> ALIKE WITH THE EXCEPTION OF THE "FILL" CAP <br /> 1 4" STEEL PLUG (TYR) 3" SUMP PIPING PENETRATION 3. TANKS SHALL BE TESTED AND INSTALLED IN <br /> ACCORDANCE WITH MANUFACTURERS RECOMMENDA- <br /> VAPOR CAP & 3'x4" DRY BREAK ADAPTOR 3" SINGLE WALL PHASE 11 VAPOR RETURN TIONS AS WELL AS LOCAL ORDINANCES-SEE DWG. J-0.1. <br /> 4'x4" FILL CAP AND ADAPTOR LINE FROM DISPENSER ISLAND <br /> 4. ALL CONTAINMENT SUMP ASSEMBLIES SHALL BE <br /> FIBERGLASSED INSIDE & OUTSIDE TO TANK RING AND <br /> ' • CAPABLE OF WITHSTANDING HYDROSTATIC TESTING, <br /> CONTAINMENT SUMP ASSEMBLIES WILL BE INSTALLED <br /> • a TANK LEVEL PROBE RISER & CAP BY AMERICAN CONTAINMENT WHICH WILL ACT AS A <br /> / 3/4" SUMP CONDUIT PENTRATION SUBCONTRACTOR TO THE GENERAL CONTRACTOR. <br /> n JUNCTION 80% (TYRNDU BOTH SUMPS) I I / ( ) CALL ) <br /> O1 1 " S�CONDUt�PENETRAFION` 3 4" CONDUIT FOR SUBMERSIBLE PUMP POWER SEE NOTE 8 (800 555-6785 TOSCHEDULF. <br /> \1 GENERAL CONTRACTOR WILL PERFORM HYDROSTATIC <br /> I VARIABLE LENGTH TURBINE HEAD & ADJUST LENGTH PER MANUFACTURERS INSTRUCTIONS TEST AFTER INSTALLING PENETRATION FITTINGS <br /> MP LEAK DETECTOR I AND ASSOCIATED PIPING / CONDUIT. <br /> C(�_E_E__N_0T_E _8T_ <br /> 2" BALL VALVE5. ASSURE UNUSED PORTS ARE PLUGGED ON <br /> 1" CONDUIT / 2" SUMP PIPING PENETRATION TURBINE AND LEAK DETECTOR. <br /> — <br /> 4" STEEL PLUG (NP) 2" SINGLE WALL FIBERGLASS TANK VENT 6. LOW AND HIGH VOLTAGE LINES SHALL BE RUN IN <br /> I <br /> 4" EXTRACTOR CAP 4"x4"x3"x2" EXTRACTOR VALVE ' 3" SUMP PIPING PENETRATION SEPARATE DEDICATED CONDUITS. <br /> TANK ANNULUS SENSOR RISER b CAP ASSEMBLY - PLUG UNUSED OPENING (2 TYR) 7. ALL STEEL PIPING INSIDE SPILL CONTAINMENT SUMP <br /> _ 1 ' CONDUIT FROM MONITOR PANELTO J-BOX (SEE NOTE 8 & 15) 2" FIBERGLASS PRODUCT PIPING LINE WITH ASSEMBLY SHALL BE SCH. 40 BLACK IRON, INCLUDING <br /> 36" DIA, FILL BOX & COVER WITH SPILL CONTAINMENTFILL FILL/V <br /> I 36" DIA SUB-PUMP MANWAY I I 3" FIBERGLASS SECONDARY CONTAINMENT PIPE ALL 4" RISERS. (NO GALVANIZED PIPING) <br /> ¢ <br /> FILL BOX WITH DRAIN VALVE r APOR RECOVERY MANWAY & CONTAINMENT SUMP � ' B. ROUTE CONDUITS ALONG INSIDE PERIMETER OF SUMP TO <br /> 12" <br /> SEE DETAIL J-1.1 PHASE1 VAPOR RECOVERY SEE DETAIL J-1.1 SUB-IPUMP MANWAY & CONTAINMENT SUMP PROVIDE EASE OF ACCESS TO PIPING IN THE FUTURE. <br /> , I <br /> FF 24" SLOPE (TYP) 12 FOR CONDUIT SCHEMATIC SEE DWG. J-8. <br /> 2" CROWN (TYR) i I 4" MIN. 6" MAX. CLEARANCE FROM FILL & VAPOR CAP TO SNAP TITE LID - I ' 8'MIN. TO 18" MAX. CLEARANCE FROM MANWAY <br /> 1 TO RISER CAPS & SUB-PUMP A/C PAVING 9. ALL JUNCTION BOXES TO BE EXPLOSION PROOF WI1H <br /> (TYP BOTH SIDES) UNION HUBS, CROUSE-HINDS GUAG7775. JUNCTION <br /> —;� - - - - BOXES ON SUMP WALL SHOULD BE MOUNTED AS <br /> --- — --- -- 9. — -a- .� _ate — '� 1 -��� —p— — — — — — -- HIGH AS POSSIBLE FOR EASE OF SERVICING. <br /> 10. ALL CONDUITS TO HAVE SEAL-OFFS PER LATEST EDITION <br /> 1 I > OF THE NATIONAL ELECTRICAL CODE. <br /> _ _ 1 INSTALL MECHANICAL LEAK DETECTOR PER IPAVIN BASE 11. USE CABLE CONNECTOR FITTINGS (CROUSE—HINDS CGB OR <br /> - 11 4" BLACK IRON RISER BY CONTRACTOR �' I MANUFACTURERS INSTRUCTIONS <br /> I (TYP BO H SIDES) APPROVED EQUAL) AT MONITOR & LEVEL GAUGE CABLE <br /> JUNCTION BOX (TYP BOTH SUMPS SEE NOTE 9) �' I 1 I ' CONNECTIONS TO J-BOXES & PIPE FITTINGS. <br /> EYESEAL OFF (TYR BOTH SUMPS) i I I 3"x2" REDUCING TEST BOOT (SEE NOTE 16) <br /> 3/4" SUMP CONDUIT PENETRATION MINIMUM 5'-O"-MAXIMUM 7'-0 12. ALL CONDUIT AND PIPING TO PENETRATE SUMPS <br /> Z I I I I I I SEE SITE SPECIFIC PERPENDICULAR TO SUMP WALL. 2 <br /> 3/4" CONDUIT FOR SUBMERSIBLE PUMP (SEE NOTE 8) <br /> 1" SUMP CONDUIT PENETRATION I I I I BURIAL DEPTH CALCULATION 13. WHEN INSTALLING FILL BOX, CONTRACTOR IS TO ASSURE <br /> I 1" SUMP CONDUIT PENETRATION 3' SUMP PIPING PENETRATION THAT THE SPACE BETWEEN THE FILL BOX SKIRT AND THE <br /> -" — 1' CONDUIT FROM MONITOR PANEL = I I ON GENERAL PIPING PLAN <br /> 2" FIBERGLASS PRODUCT PIPING LINE WITH TOP OF THE CONTAINMENT SUMP 6 EQUALLY SPACED <br /> TO J-BOX (SEE NOTE 8 & 15) "" — I 3" FIBERGLASS SECONDARY CONTAINMENT PIPE ALL AROUND. PROVIDE ADEQUATE SUPPORT FOR FILL <br /> - ---_-� I I 3" SUMP PIPING PENETRATION I ' I I BOX DURING CONCRETE INSTALLATION SUCH THAT FILL <br /> DROP TUBE WITH OVERFILL PROTECTION / I 1 3" SINGLE WALL PHASE 11 VAPOR I 2" SINGLE WALL FIBERGLASS TANK VENT <br /> _ n I RETURN FROM DISPENSER ISLAND I 2" SUMP PIPING PENETRATION (NP BOTH SIDES) BOX DOES NOT MOVE RELATIVE E CONTAINMENT SUMP. <br /> M12" TANK COLLAR (TYP BOTH SUMPS} � � ,. , 1 I III CONTAINMENT SUMP LID MUST BE INSTALLED ON TURBINE <br /> CONTAINMENT SUMP TO ASSURE THAT NO WATER ENTRY <br /> LOCATION FOR TANK HOLD DOWNS (4 TYR) I I I I i III CAN OCCUR. <br /> 1-i. ALL PIPING TO SLOPE DOWN TOWARD TANKS AT A <br /> - I I MINIMUM OF 1/4" PER FOOT. <br /> Z i I I i I I z 15. MONITOR CONDUIT MAY ENTER TURBINE SUMP FIRST <br /> O 1 I I -I�- _-_ �, DEPENDENT ON SITE ARRANGEMENT AND TANK <br /> Q LOCATIONS. <br /> > 1 L I II 16, UNCLAMP TEST BOOT AFTER TESTING SECONDARY PIPING. <br /> U <br /> x I I I I I I I I x <br /> w - I1 ' II I w <br /> I I r I I I fC� II i C) UNDERGROUND STORAGE TANKS <br /> F- <br /> I I I I I I APPROVED DOUBLE WALL FIBERGLASS TANKS <br /> J I I I 1 I ' I II II I J ARE PER DWG. J-0.1, MATERIAL FURNISHED BY <br /> I 1 I I I II II I 76 PRODUCTS CO. <br /> ' SEE GENERAL ARRANGEMENT DRAWING FOR QUANTITY AND <br /> I I 1 I I I I I LOCATION OF TANKS, <br /> I&1 D D GASOLINE STORAGETANKS <br /> TANK SHALL BE INSTALLED PER SITE SPECIFIC BURIAL DEPTH <br /> CALCULATION AS SHOWN ON DRAWING J-0.1. TANKS MUST <br /> I I I I II II I NOT BE BURIED DEEPER THAN 7 FEET, THFRF SHALT_ BE <br /> I I I I I I 10'-4" 18 INCHES MIN. BETWEEN TANKS, <br /> I TANKS SHALL BE INSTALLED WITH A CRANE ONLY, <br /> OUTSIDE DIAMETER <br /> CRANE SHOULD BE ADEOUATEI_Y SIZED TO <br /> ACCOMODATE TANK SIZES SPECIFIED ON THE GENERAL <br /> ( I I I II I ARRANGEMENT DRAWING AND WEIGHTS AS INDICATED IN THE 3 <br /> TABLES HEREON, TANKS SHALL BE SET ON A FIRM BASE OF 12" <br /> I I I 1 I I I II II WASHED PEA GRAVEL AND SURROUNDED ON ALL SIDES BY A <br /> MINIMUM THICKNESS 18" OF 'WASHED PEA GRAVEL. <br /> - I 1/4" THICK STRIKER PLATE UNDER I I I CONTRACTOR SHALL INSTALL FILL RISER AND LEVFI- TANK TO <br /> I I KEEP RISER STRAIGHT BEFORE PROCEEDING TO BACKFILL. <br /> ALL TANK OPENINGS PERSONNEL CHECKING LEVEL SHALL BE LOWERED TO TANK <br /> -- I TOP IN SAFETY HARNESS. <br /> 1 (FURNISHED BY TANK MANUFACTURER) FOR ADDITIONAL INFORMATION SEE DWG. J-0.1, J-0.2. J-D.2A <br /> I I I I TANK SPECIFICATIONS <br /> 45" I I XERXES CORPORATION <br /> jI I 4-6" j — 57 TANK <br /> I I I I — CAPACITY 15,000 GALS. <br /> (14.976 GAL. ACTUAL) <br /> . . .' `_`-_ . _ — 1 -O LENGTH DIA. 20.-4.,3/ <br /> 12" PEA GRAVEL TANK BED (SEE J-0.1 ) -'�---� _ 4• <br /> E T -TAN K,_ L _E V E L ( D O N 0 T S L 0 P E ) <br /> - -_ WEIGHT 6,100 LBS. (APPROX <br /> I , I , I I -I `\ ) <br /> �y ANNULUS LEAK DETECTOR SENSOR AT BOTTOM CENTER OF TANK MAGNETOSTRICTIVE PROBE _ <br /> CONTRACTOR TO FIELD CUT LOWER END OF FILL TUBE VARIABLE LENGTH SUBMERSIBLE PUMP 92 TANK <br /> AT A 45' ANGLE & INSTALL PER MANUFACTURERS INSTRUCTIONS CAPACITY 12,000 GALS. <br /> (11,849 GAL. ACTUAL) <br /> 29'-5 3/4" (15,000 GALLON TANK) V-6.I LENGTH z4'-D 1/a" <br /> OUTER DIA. 10'-4" <br /> 24'-0 1 /4" (12,000 GALLON TANK) WEIGHT 4,950 LBS, (APPROX) <br /> T Y P I C A L P R O D U C T T A N K — E L E V A T 1 0 N USE APPLICABLE SECTIONS ONLY <br /> 4 REV DATE REVISED Y�DA � W of APPROVAL. RECORD APPROVALS 4 <br /> © UNION OIL OF CALIFORNIA, dba UNOCAL, 1994 MILESTONE MIT APPROVAL �^ � RH UNLEADED GASOLINE <br /> THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN IS ISSUED FOR C.U.P. UNDERGROUND FUEL TANK INSTALLATION <br /> PROPRIETARY TO UNION OIL OF CALIFORNIA (UNOCAL) AND HAS CNECKIMBy TYPICAL OF 87 TANKS <br /> BEEN FURNISHED IN CONFIDENCE AND ARE SUBJECT TO THE ISSUED FOR PUN CHECK <br /> TERMS OF A SEPARATE SECRECY AGREEMENT BETWEEN UNOCAL APPS° <br /> AND THE RECIPIENT. THE RECIPIENT IS NOT TO COPY, DUPLICATE ISSUED FOR GEN. BID <br /> OR DISCLOSE THE CONTENTS TO ANY PERSON OR ENTITY EXCEPT GATE 1/8/97 " "" "1 n °"""a14 NO REV M. <br /> AS EXPRESSLY AUTHORIZED BY SAID AGREEMENT OR BY UNOCALISSUED FOR CONSTRUCT. s4lj — <br /> — ' PRODUCTS COMPANY <br /> IN WRITING. RECORD DRAWING scuf 3/4" = 1' (mRSlRunu, aa,I�1 - ""v V — O or 9'Nrs <br /> A B C D <br />