Laserfiche WebLink
A B C D E F <br /> I, GENERAL IL MATERIALS 3 CONDOR 4. TESTING OF SECONDARY (EXTERNAL) TANK <br /> A. DL5CRIPM A WEEKS SUPPLIED BY CONTRACTOR a) REFER TO CONSTRUCTION DRAWINGS FOR MINIMUM SIZE CONDUITS. OTHERWISE a) MAINTAIN PRESSURE ON THE PRIMARY TANK. PLUG ALL OPEN FITTINGS ON THE <br /> I. WORK INCLUDED THE CONTRACTOR SHALL PURCHASE AND INSTALL ALL MATERIALS EXCEPT AS MINIMUM SIZE SHALL BE 3/4' DIAMETER. SECONDARY TANK. <br /> 1INDICATED. CONTRACTOR SHALL NOT DEVIATE FROM MATERIALS OR PRODUCTS b) FITTINGS SHALL BE CONSISTENT AND COMPATIBLE WITH RELATED RACEWAY MATERIAL b) CONNECT NR HOSE FROM THE PRIMARY TANK TO THE SECONDARY. <br /> INSTALIATION OF TANK TOP HARDWARE, PIPING AND TANK MONITORING SPECIFIED UNLESS THROUGH MUTUAL AGREEMENT WITH 76 PRODUC7S COMPANY EMT CONNECTORS SHALL BE PRESSURE GLAND TYPE, <br /> SYSTEMS. TESTING OF TANK AND PIPING INSTALLATIONS AT 76 PROO&C7S COMPANY REPRESENTATIVE. SUBSTITUTE MATERIALS SHALL BE DESCRIBED, SPECIFYING a) USE THE PRIMARY TANK AIR PRESSURE TO PRESSURIZE THE SECONDARY TANK i0 5 <br /> AND RE- OR INTERESTS,EXISTING <br /> SPECIFICATION IS FOR NEW INSTALLATIONS ANY DIFFERENCES IN COST. ONLY NEW MATERIALS SHALL BE USED. c) BELOW GROUND - ALL CONDUIT WITHIN THE TANK EXCAVATION SHALL BE RIGID METAL PSIG. DU NOT USE AN AIR COMPRESSOR TO PRESSURIZE THE SECONDARY TANK <br /> AND RE-WORKING Of EXISTNG TANK INSTALLATIONS, PVC COATED CONDUIT. CONDUIT AT THE BRAVO BOXES, SUMPS GUTTER BOXES, ETC, SHALL <br /> B. FIB�GI dSS REINFORCED EPDXY PIPING MATERLnIC WIVE A MINIMUM OF B FEET OF RIGID METAL PVC COATED CONDUIT. ALL OTHER BELOW d) DISCONNECT THE AIR SUPPLY AND ALLOW THE AIR PRESSURE IN THE SECONDARY TANK <br /> B. 9VAIJTY ASSURPNCE i GENE RAI GRADE CONDUIT MAY BE RIGID SCHEDULE 40 PVC CONDUIT LAID A MINIMUM OF 24' BELOW TO STABILIZE, <br /> I. ILLED WORKERSRADE. <br /> SK ALL PIPE AND FITTINGS SHALL BE AMERON DUPLOY 3000E OR A.O.0SMITH e) MONITOR THE PRESSURE FOR A PERIOD OF ONE HOUR, 80hP EXPOSED EXTERIOR OF <br /> (RED THREAD IIA) PIPE WITH UNDERWRITERS LABEL AND COMPATIBILITY WITH ETHANOL AND METHANOL d) ABOVE GROUND AND OUTSIDE OF THE BUILDING - CONDUIT SHALL BE HOT-DIPPED THE TANK, ALL FITTINGS AND MAN'WAYS AND WATCH FOR ACTIVE AIR BUBBLES T74AT <br /> USE ADEQUATE NUMBERS OF SKILLED WORKERS WHO ARE THOROUGHLY FUEL BLENDS. RED THREAD PIPING AND FITTINGS ARE NOT GALVANIZED RIGID STEEL CONDUIT CONFORMING TO ANSI STANDARD 80.1. INDICATE A LEAK. <br /> TRAINED AND EXPERIENCED IN THE NECESSARY CRAFTS AND WHO ARE INTERCHANGEABLE WITH AMERON DUALOY 3000/L DO NOT MI% <br /> COMPLETELY FAMILIAR WITH THE SPECIFIED REQUIREMENTS AND THE MANUFACTURERS. e) INSIDE THE BUILDING - CONDUIT NOT CONCEALED SHALL BE HOT-DIPPED GALVANIZED C. METAL PIPE AND FILLED <br /> METHODS NEEDED FOR PROPER PERFORMANCE OF THE 'WORK OF THIS EMT CONFORMING TO ANSI STANDARD C80.3. <br /> SECTION. 2. AMERON DUALOY 3000/L FIBEKLASS PIPE AND FITTING`; 1. TANK VENT RISERS <br /> 4, CONDUIT SEALS IN KALARDOUS LOCATIONS <br /> 2. MANUFACTURER CERTIFICATIONS -- - <br /> a) PIPE - FILAMENT WOUND FIBERGLASS REINFORCED EPDXY PIPE WITH INTEGRAL EPDXY <br /> a) ONLY MANUFACTURER TRAINED AND CERTIFIED WORKERS MAY INSTALL UNDERGROUND UNER AND EXTERIOR COATING. EXPLOSION PROOF UNIONS, COUPLINGS, REDUCTIONS ELBOWS AND CONDUIT a) FREE STANDING VENT RISERS SHALL A MINIMUM OF 72 FT, ABOVE THE <br /> SURROUNDING GRADE, SECURED TO THE VENT STAND PER DRAWING J-i.i. <br /> PIPING SYSTEMS AND RELATED HARDWARE, THE S SHALL BE THE ONLY ENCLOSURES OR FITTINGS PERMITTED BETWEEN <br /> b) FITTWCS - COMPRESSION MOLDED AND FILAMENT-WOUND REINFORCED EPDXY. THE SEAL FITTING AND ENCLOSURE. b) TANK VENT RISERS PLACED AGAINST EXTERIOR WALL OF BALDING SHALL BE SPACED <br /> b CONTRACTORS IN$TALUNG VEEDER-ROOT TANK MONITORING SYSTEMS MUST BEA AS SHOWN ON DRAWING J - 1.1 AND SECURELY ATTACHED TO WALL. TANK VENT RISERS AT <br /> •c) ADHESIVE - AMERON 820 AMBIENT CURE, TWO PART EPDXY FOR ALL SERVICE F. BED AND BACKFILL MATERIAL BUILDING SHALL TERMINATE A MINIMUM OF 18' ABOVE PARAPET OR SAVE ('WITH <br /> LEVEL 1 AIMORIZE) SERVICE CONTRACTOR, AS A MINIMUM. (INCLUDING ALCOHOL) 1. PEA GPRESSURE REUEF VALVE IF REQUIRED). - <br /> RAVEL <br /> 3. SAFETY TRAINING 3. Ai 0 SMITH (RED THREAD IA) PIPE 2. TAPPED CQATING <br /> a) REVIEW CONFINED SPACE ENTRY PROCEDURES AND CAL O.S.H.A AND FEDERAL a) WIA OF ROUNDED PARTICLES MUST HAVE A MINIMUM BACKFIDIAMETLL <br /> AL 1/8" AND A MAXIMUM No <br /> a) PIPE - GLASS FIBER REINFORCED FILAMENT WOUND IN A MATRIX OF EPDXY RESIN. DIAMETER OF 3/4 NO MORE THAN 5% OF THE BACKFILL SHALL PASS THROUGH A No. 8 a) CONTRACTOR SHALL TIGHTLY WRAP All BURIED STEEL PIPING, TANK ANNULUS RISER, <br /> O.S.H•A REGULATIONS FOR WORKERS ENTERING OPEN EXCAVATIONS ON HOW THEY APPLY LIEF SIEVE INCLUDING THREADS AND FITTINGS, AND VENT ONES. <br /> PARTICULAR PROJECT. Ib) FITTINGS - COMPRESSION MOLDED FITTINGS USING AND EPDXY MOLDING COMPOUND <br /> b) PREPARE 76 P/A20(/C75 COMPANY FACILITIES AND SITE DEVELOPMENT SITE SAFELY WORK CONTAINING A MINIMUM OF 45% CHOPPED FIBERGLASS, b) STANDARD SIZES OF COARSE AGGREGATES PER. ASTM D-448, ASTM C-33 AND PASHTO M 43 b) APPLY TWO (2) LAYERS OF 1-INCH WIDE CORROSION PROTECTION TAPE (ROMER 940 <br /> OR SCOTCHWRA <br /> PLAN SUMMARY, AND THOROUGHLY REVIEW THE PLAN WITH ALL ASSOCIATED WITH THE WORK c) ADHESIVE - A 0. SMITH DS-8000 (PRIMARY PIPE) AND DS-7000 (SECONDARY PIPE) WIDTH OVERLAPP 50 10 MIL THICK). EACH LAYER SHALL BE SPIRAL WRAPPED WITH A I/2 <br /> SCOPE- UL LISTED FOR PETROLEUM PRODUCTS, ALCOHOL, AND PETROLEUM / ALCOHOL BLENDS. 2 � <br /> PREPARE PRODUCTS CFACILITIES AND SITE DEVELOPMENT WORK PERMITS, <br /> EXTERNAL HEAT CURE, TWO PART EPDXY. c) AT CONNECTIONS BETWEEN STEEL AND FIBER,LASS PIPE, TAPE SHALL EXTEND 2 <br /> COMPLY wm <br /> c) IT{ All GUIDE ONES.UNEI. Y 4. CERTIFICATION ALL ELECTRICAL CONDUITS OUTSIDE FI THE TANK EXCAVATION AND PIPE INCHES (MINIMUM) ONO FIBERGLASS PIPE, TAPE SHALL BE CARRIED UP TO THE 2-INCH <br /> TRENCHES MAY BE BACKFILLED WITH FILL SAND, COUPLING AT VENT LINES. <br /> d) CONTRACTOR SHALL USE APPROPRIATE PERSONAL SAFETY EQUIPMENT WHEN HANDLING FIBERGLASS THE INSTALL FR MUST BE FACTORY CERRFlED BY AMERON OR A 0. SMITH, <br /> D. FIBERGLASS REINFORCED EPDXY PIPING <br /> PIPE, ADHESIVES AND SOLVENTS, THE USE OF CLOVES, SAFETY GLASSES, DUST MASKS, AND BE FAMILIAR WITH THE LATEST INSTALLATION MANUALS, AND OTHER <br /> ETC. ARE MINIMUM REQUIREMENTS. ALL APPLICABLE SAFETY CODES ARE TO BE FOLLOWED. MANUFACTURER'S BULLETINS AND LITERATURE PERTAINING TO FIBERGLASS 1. STORAGE DELIVERY AND HANDLING OF PIPE MATFRAI„S <br /> REINFORCED PIPE. <br /> C. ,IOD_OONDITIONS FIBERGLASS REINFORCED EPDXY PIPING MUST BE STORED, DELIVERED, AND <br /> } C. METAL PIPE AND FITTINGS 111 E%ECIfDON HANDLED BY THE INSTALUNG CONTRACTOR PER MANUFACTURER <br /> DENLR INSTALLATION INSTRUCTIONS. DAMAGED PIPING IS NOT TO BE <br /> WORKING ON UNDERGROUND STORAGE TANKS THAT CONTAIN FUEL OR HAVE NOTE: STEEL PIPE AND FITTINGS WILL BE USED ONLY WHERE A TANK TOP HARDWARE INSTALLATION INSTALLED. <br /> CONTAINED FUEL 6 A HAZARDOUS OPERATION, EXTREME CME IS TO BE FITTINGS ALAN CALLED FOR HA PLANS. All OTI{ER PETROLEUM PIPING, <br /> TAKEN WHEN WORKING IN THIS ENVIRONMENT. ME ADDITIONAL HAZARDOUS SMITH <br /> AND ADHESIVES SHALL BE DER RI WPLOY 3000/L OR A 0. 1. TANK RISERS 2. PIPEWAY TRENCH EXCAVA7TON <br /> CONDITION OF WORKING IN AN OPEN EXCAVATION IS i0 BE EQUALLY SMITH RED THREAD IIA WITH UNDERWRITERS (ABEL AND METHANOL <br /> COMPATIBLE. <br /> CONSIDERED WHEN REVIEWING THE JOBSDE CONDMONS. To) PLUG ALL UN-USED TANK FITTINGS WITH STEEL TANK PLUGS. DO NOT FIBERGLASS a) ALL PIPEWAY TRENCHES TO BE DUDE ENOUGH TO ALLOW A MINIMUM OF 4' SPACING <br /> I. MIETAL PIPE <br /> OVER ANY PLUGGED FITTINGS WITHIN THE CONTAINMENT SUMP. BETWEEN PIPES, AND 6" FROM PIPE TO TRENCH WALLS, <br /> 2. NEL IFVFt <br /> AVE STEEL PIPING, INCLUDING TANK RISERS, SHALL BE BLACK IRON PIPE b) INSTALL TANK TOP VALVES AND FIRINGS PER PIANb) ALL TRENCHING TO ALLOW FOR A MINIMUM 6' BEDDING FOR PIPING AND MINIMUM 18' <br /> S, CUT, THREAD AND INSTALL FROM FINISH GRADE COVER. <br /> a) <br /> FOR NEW TANK INSTALLATIONS, OR 'HORNING ON TANKS THAT HAVE NOT PREVIOUSLY (TETHER ASTM A 53 OR ASTM A 120), SCHEDULE 40 WELDED OR RISERS WHERE SHOWN ON PIANS, ENSURING PROPER CLEARANCES, AND TOLERANCES. <br /> CONTAINED FUEL, ALL SAFE WORK PRACTICES APPLY, EXCEPT THOSE THAT REFER TO TANKS SEAMLESS. c) ALL TRENCHING TO SLOPE A MINIMUM OF 1/4' PER FOOT BACK TO TANKS. <br /> THAT CONTAIN OR HAVE PREVIOUSLY CONTAINED NEL. c) THREADS SHALL BE CLEAN, FULL LENGTH, COATED WITH PETROLEUM RESISTANT THREAD <br /> b) TANK RETROFIT PROJECTS, OR WHEN WORKING ON UNDERGROUND STORAGE TANKS THAT 2. MTETAL FITTINGS LUBRICANT (PERMATEX d 2, OR EQUAL). TIGHTEN PIPE AND FITTINGS TO REFUSAL 3. FILTER FABRIC INSIAJ i 90 - (WHEN REQUIRED) <br /> HAVE BEEN PREVIOUSLY IN SERVICE, PRIOR TO EXCAVATION OF TANKS, ALL TANKS ARE TO All SCREWED FITTINGS SHALL BE 300 Lb. MALLEABLE IRON PER 2. OVERFILL PROTECTION DROP TUBE a) AFTER TRENCH EXCAVATION HAS BEEN COMPLETED TO PROPER SIZE, THE TRENCH WILL <br /> 8E FILLED TO CAPACITY, REDUCING THE ULIAGE OR HEAD SPACE. SPECIFICATION ASTM A 197 AND DIMENSIONAL STANDARD ASA B 16 - 20. BE LINED WITH A FILTER FABRIC MATERIAL INSTALLED IN ACCORDANCE 'WDM <br /> INSTALL THE OVERFILL PROTECTION DROP TUBE PER MANUFACTURER2S <br /> BLACK IRON FTITINCS SHALL BE USED ON ALL STEEL LINES. THE MANUFACTURERS RECOMMENDATIONS. FILTER FABRIC SIWE CONFORM TO THE FOLLOWING: <br /> c) IF IT NOT DESIRABLE TO HAVE THE TANK NEL, THEN THE TANK T TO BE MATERIAL SPECIFICATION FOR BLACK IRON FIRINGS SHALL BE ASTM A INSTRUCTIONS. ENSURE THAT THE DROP TUBE IS A MINIMUM OF 4' AND A <br /> COMPLETELY EMPTIED, OE-GASSED, CLEANED, AND CERTIFIED U HOT WORK PER FEDERAL, 105 OR ASTM A 181. MAXIMUM OF 6' FROM 7HE BOTTOM OF THE TANK. DUPONT 'TYPAR' STYLE 3401 - 4 az. / Sq. Yd. <br /> STATE, AND LOCAL REGULATIONS, AND 76 PRpp(R'F CO4/P,INY UNDERGROUND TANK <br /> SPECIFICATIONS, D. TANK TGP AND PIPING HARDWARE 3. SUBMERSIBLE PUMP HOECHST 'TREORA' SME 1114 - 4 oz. / Sq. Yd. _ <br /> 3. EXCAVATION I. TMK TOP EQUIPMENT a) INSTALL SUBMERSIBLE PUMP RISER AT THE PROPER LENGTH TO MEET PROPER <br /> CLEARANCES AND TOLERANCES. OVERLAPPED b) FILLER FABRIC SHALL BE 2 FT. MINIMUM A7 ALL JOINS. FOLD OVER AT <br /> o) TOP OF UNDERGROUND STORAGE TANKS TO BE EXPOSED WITH THE BACKFILL IN PLACE 76 PROOXIS COMP.WY SUPPLIED MATERIAL PER PACKAGES ON UNDERGROUND TOP OF EXCAVATION WHEN IS COMPLETE <br /> AROUND DIE SIDES AND ENDS OF THE TANKS. b) SET ADJUSTABLE LENGTH OF SUBMERSIBLE PUMP SHAFT TO SUBMERSIBLE PUMP IS A <br /> STORAGE TANK STANDARD J-0.4 c) FILTER FABRIC LINER WILL BE REQUIRED ONLY WHEN ACTUAL SOIL CONDITIONS <br /> MINIMUM OF 4' AND A MAXIMUM OF 6' FROM THE BOTTOM OF THE TANK. DO NOT INSTPLL WARRANT, LOOSE, POORLY GRADED OR SILTY SAND SOIL WILL NORMALLY REQUIRE FILTER <br /> b) IF TANK BURIAL DEPTH IS 5 FEET OR GREATER, ADEQUATE SLOPING OR SHORING IS 2 EWMPA.BIIjJl7Y EQ IUPMENT SUBMERSIBLE PUMP IF TANK IS BALLASTED WITH WATER, FABRIC. THE 76 PRODUCTS COUPANY REPRESENTATIVE SHALL DETERMINE WHEN LINER IS TO <br /> TO BE PROVIDED PER CAL O.S.HA OR FEDERAL O.S.HA. REQUIREMENTS. BE INSTALLED. <br /> 7'6 PROIX/G'7S COA/PANY SUPPLIED MATERIAL PER PACKAGES ON UNDERGROUND 4. MECHANICAL LEAK DETECTOR <br /> c) TANKS THAT CONTAIN FUEL ARE TO BE VENTED TO AT LEAST 12 FEET ABOVE THE STORAGE TANK STANDARD J-0.5 4. TRENCH BEDDING AND SACKFIWNG <br /> SURROUNDING GRADE WITH A VENT PIPE, ALL OTHER OPENINGS ARE TO BE CAPPED TIGHT a) INSTALL MECHANICAL LEAK DETECTOR PER MANUFACTURES INSTRUCTIONS. TOP OF LEAK DETECTOR TO <br /> WITH THREADED STEEL PLUGS. 3. ISILAND EQUIPMENT BE A MINIMUM OF 8' TO A MAXIMUM OF 18' BELOW GRADE. <br /> a) BEDDING TO BE A MINIMUM OF 6' OF COMPACTED PEA GRAVEL. <br /> 4. p_$�CONSTRUCDON TANK IESTNG (TANK PREVIOUSLY IN SERVICE) N PRODWTS COMPANY SUPPLIED MATERIAL PER PACKAGES ON UNDERGROUND b) GRADE BED SMOOTH WITH A MINIMUM OF 1/6' PER FOOT FALL BACK TO TANKS. <br /> c) PRIOR TO COMMENCEMENT OF WORK, THE TANKS ARE TO BE TESTED FOR TIGHTNESS STORAGE TANK STANDARD J-0.5 b) COMPLETE WARRANTY INFORMATION CARD AND SUBMIT TO 76 PROD(ICIS COJVPF4NY <br /> c) INSTALL PIPING WITH NO TRAPS OR SUMPS. <br /> USING NITROGEN. 4, MCONROR EOUIPMENi REPRESENTATIVE. <br /> L) THE TANKS ARE NOT TO HAVE GRA R THAN 5 PSIG PRESSURE AT AHY TIME. B. TANK TOP HARDWARE TESTING d) CAREFULLY PLACE 8" OF PFA GRAVEL. COVER BY HAND i0 ENSURE <br /> 3 ) T6 PROOUC75 C24 PANTY SUPPUfO MATERIAL AL PER PACKAGES ON UNDERGROUND PROPER PIPING COVER AND SUPPORT. USE EQUIPMENT ONLY AFTER 8' COVER IS HAND- <br /> c) SOAP TEST THE EXPOSED PORTION OF THE TANK AND IMMEDIATELY REPORT ANY STORAGE TANK STANDARD J-0.6 1 NE PLACED AND TAMPED. J <br /> DEFECTS OR LEAKS. E. FUEL SYSTEM ELECTRICAL MATERIALS NEVER USE NR TO TEST PIPE THAT CONTAINS, OR HAS PREVIOUSLY e) SPECIAL CARE SHALL BE TAKEN TO PREVENT THE INTERMIXING OF STONES, DIRT O. RELATED SPECIFICATIONS AND REQUIREMENTS i. MATERIAL SUPPLIED BY CONTRACTOR CONTAINED PRODUCT, USE NITROGEN OR OTHER NON-FLAMMABLE GAS, CLODS, OR OTHER DEBRIS WITH CLEAN BACKFILL AROUND THE PIPE, OR FLEX CONNECTORS. <br /> 1. FEDERAL STATE AND LOCAL REGULATIONS2. TANK TEST MANIFOLD 5. PIPE LAYOUT AND FRYING <br /> THE CONTRACTOR FINALE PURCHASE AND INSTALL ALL MAIERALS, ALL <br /> MATERIALS SHALL BE NEW AND FIRST QUALITY AND SHALL BE LISTED BY A ALL PIPEWAYS TO BE UNIFORMLY SPACED AND PARALLEL TO DISPENSING <br /> THESE SPECIFICATIONS ARE THE 76 PRODUCTS CO4IPANY REQUIREMENTS. a) CONTRACTOR TO PROVIDE TANK TEST MANIFOLD PER MANUFACTURERS INSTALLATION <br /> FEDERAL, STATE AND LOCAL REQUIREMENTS MAY DIFFER SUBSTANTIALLY, NATIONALLY RECOGNIZED TESTING LAB. FITTINGS. PIPELINES SHALL BE PLACED IN STRAIGHT RUNS, USING <br /> INSTRUCTIONS AND THESE SPECIFICATIONS. FIRINGS AS REQUIRED. PIPE WORK OVER TANKS OR UNDER BUILDING <br /> THE STRICTER OF ME CONFLICTING REQUIREMENTS SHALL BE GUIDING. 2. WIRES AND CAB F¢ FLOORS SHALL BE AVOIDED. PIPE UNDER CONCRETE SLAGS SHALL BE <br /> NOTIFY 76 PPOOUCTS CO41PAN( REPRESENTATIVE OF ANY CONFUCTS. b) CONTRACTOR TO FURNISH AIR PRESSURE CADGE WITH A MAXIMUM FULL SCALE READING LIMITED TO THE MINIMUM REQUIRED TO REACH DISPENSERS. <br /> a) ALL MONITORING COMMUNICATION WIRING SHALL BE SHIELDED CABLE. OF 15 PSIG WITH 1/4 OR 1/10 PSIG INCREMENTS, PRESSURE GOUGE TO BE IN GOOD <br /> 2. UNDERGROUND STORAGE TANK SPECIFICATIONS REPAIR, AND HAVE A CALIBRATION DATE WITHIN 30 DAYS OF USE. PRESSURE GAUGES 6. JOINT BONDING AND ADHESIVE CURING <br /> b) WIRING INSIDE BUILDING AND ABOVE GROUND SHALL BE TYPE THAN. WIRING IN DAMAGED OR OUT OF CALIBRATION WILL NOT BE PERMITTED. <br /> REMOVAL AND DISPOSAL SPECIFICATION - REV 5 - 1/6/97 (J-0) CONDUIT UNDERGROUND OR IN DAMP LOCATIONS SHAD. BE TYPE THWN. APPLY ADHESIVE TO JOINTS PER MANUFACTURER'S INSTRUCTIONS. ALLOW <br /> e) CONTRACTOR FURNISH A PRESSURE RELIEFAUBR VALVE, SET 6 PSIG. RELIEF VALVE PROPER CURE TIME, OR USE HEAT BLANKETS TO CURE JOINTS PER <br /> INSTALLATION SPECIFICATION - REV 5 - I/6/97 (J-0.1) TO BE IN GOOD REPAIR, AND HAVE A CALIBRATION DATE WITHIN 30 DAYS OF USE. RELIEF <br /> c) THE MINIMUM SIZE CONDUCTOR MALL BE No. 12 GAUGE AND MAY BE STRANDED OR VALVES DAMAGED OR OUT OF CALIBRATION WILL NOT BE PERMITTED MANUFACTURER'S REQUIREMENTS. <br /> SOLID. No. 6 GAUGE AND LARGER SHALL BE STRANDED.CONTAINMENT SUMP AND COLLAR INSTALLATION SPECIFICATION REV 1 - 5/22/96 (J-0.3) <br /> 3. ELECTRICAL SPECIFICATION - REV 0 - 6/5/96 d) ALL CONDUCTORS SHALL BE COPPER. 3. TESTING OF PRIMARY TANK TOP HARDWARE <br /> TI) CONNECT THE TEST MANIFOLD TO AN AVAILABLE PRIMARY TANK RISER. CHECK TO <br /> ENSURE THAT ALL REMAINING TANK RISERS AND FITTINGS ARE PROPERLY DOPED, PLUGGED <br /> AND TIGHTENED. <br /> b) OPEN THE MONITOR FETING NOT CONNECTED TO THE HOSE QUICK DISCONNECT <br /> FRIEND. <br /> c) PRESSURIZE THE PRIMARY TANK TO 5 PSIG, ADD OR REMOVE AIR AS NECESSARY AND <br /> ALLOW THE PRESSURE TO STABILIZE. CLOSE THE VALVE ON THE TEST ASSEMBLY AND <br /> DISCONNECT FROM THE AIR SOURCE <br /> d) MONITOR THE PRESSURE FOR A PERIOD OF ONE HOUR, SOAP ALL FITTINGS AND <br /> MANWAYS AND WATCH FOR ACTIVE AIR BUBBLES THAT INDICATE A LEAK. <br /> USE APPLICABLE SECTIONS ONLY <br /> REV DATE REVISED OWING ALL <br /> DATE aPRIM mi BYY FID. T APPROVAL RECORD APPROVALS 4 <br /> UNION 011. OF dba UNOCAL 1994 aRAWN ° TAIT <br /> CALIFORNIA, � 41TF.StONE DATE N'PNWAI <br /> THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN IS ISSUED FOR C.U.P. UNDERGROUND FUEL TANKS <br /> PROPRIETARY TO UNION CIL of CALIFORNIA (UNOCAL) AND HAS CHECKED BY WO GENERAL SPECIFICATIONS, PIPING AND TESTING <br /> BEEN FURNISHED IN CONFIDENCE AND ARE SUBJECT TO THE ISSUED FOR PLAN CHECK xaa oww m carom) DA< (CONTINUED ON J -0.2A) <br /> TERMS OF A SEPARATE SECRECY AGREEMENT BETWEEN UNOCAL 'PPWAO) <br /> AND THE RECIPIENT. THE RECIPIENT IS NOT TO COPY, DUPLICATE ISSUED FOR GEN. BID <br /> OR DISCLOSE THE CONTENTS TO ANY PERSON OR ENTITY EXCEPT DATE 1-27-97 """ <br /> _ <br /> AS EXPRESSLY AUTHORIZEDslEo BY SAID AGREEMENT OR BY UNOCAL ISSUED FOR CONSTRUCT. {�) PRODUCTS COMPANY <br /> IN WRITING, scat NONE J - 0 . 2 0 or , srm <br /> RECORD DRAWING lorrsrmx:ml wauffa) <br /> A B C D E F <br />