My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:30:46 AM
Creation date
11/5/2018 11:18:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\1630\PR0518624\COMPLIANCE INFO 2013-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • Page 7 of 11 <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: ❑UDC Manufacturer N Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum N Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: See attached testing procedures. Equipment Resolution: <br /> UDC# 1/2 UDC#3/4 UDC#5/6 UDC#7/8 <br /> UDC Manufacturer: <br /> UDC Material: Plastic Plastic Plastic Plastic <br /> UDC Depth: 37" 37" 28" 28" <br /> Height from UDC Bottom to Top 8" 8" 8" 8" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 4" 4" 4" 4" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Fair Fair Fair Fair <br /> testing: <br /> Portion of UDC Tested Above highest Above highest Above highest Above highest <br /> penetration penetration penetration Penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ❑No N NA [-]Yes❑No N NA ❑Yes ❑No N NA ❑Yes ❑No N NA <br /> product and water)? <br /> Turbine shutdown response time <br /> Is system programmed for fail- ❑Yes ❑No N NA ❑Yes❑No N NA ❑Yes ❑No N NA ❑Yes ❑No N NA <br /> safe shutdown?' <br /> Was fail-safe verified to be ❑Yes ❑No N NA ❑Yes❑No N NA ❑Yes ❑No N NA ❑Yes ❑No N NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test <br /> Test Start Time: 12:14pm 12:21pm 12:14pm Visual Fail <br /> Initial Reading(RI): 1.4887 2.5349 1.7485 <br /> Test End Time: 12:29pm 12:36pm 12:29pm <br /> Final Reading(RF): 1.4886 2.5349 1.7485 <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Change in Reading(RF-RI): 0.00010 0 0 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Result: N Pass ❑ Fail 1 N Pass ❑Fail N Pass ❑ Fail ❑ Pass N Fail <br /> Was sensor removed for testing? NYes❑No ❑NA I NYes❑No LINA NYes❑No❑NA NYes❑No❑NA <br /> Was sensor properly replaced and NYes❑No❑NA NYes❑No[_]NA NYes❑No❑NA NYes❑No❑NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> UDC 7/8—hole in test boot on 87 sec line 2.7x2.7 <br /> i If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk M is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.