Laserfiche WebLink
SWRCB,January 2002 • • Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer kr1ndustry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: q Pressure 0 Vacuum 0 Hydrostatic <br /> 1 0 Other(Specify) <br /> Test Equipment Used:Dial Gauge Equipment Resolution: 0-15 psi <br /> Piping Run# V1j? Piping Run# Piping Run # Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: Ve--)7- <br /> Method and location of Test boot in sump Test boot in sump Test boot in sump Test boot in sump <br /> piping-ran isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test: <br /> Test Start Time: 71.4) 0 <br /> Initial Reading(RI): <br /> Test End Time: ca <br /> Final Reading(RF): <br /> Test Duration: I hour I hour I hour I hour <br /> Change in Reading(RF-R): 0 — <br /> Pass/Fail Threshold or 0.00 0.00 0.00 0.00 <br /> Criteria: Pass 0 Fail —lin � I <br /> Test Result: =jN ji 0 Pass 0 F <br /> Comments—(include information on repairs in ade prior to testing, and recommendedfollow-upftirfailed tests) <br />