Laserfiche WebLink
S WRCB,January 2002 • • Page A of-3 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed.By: D Sump Manufacturer Kjndustry Standard 0 Professional Engineer <br /> D Other(Spec) <br /> Test Method Used: 0 Pressure 0 Vacuum S�Hydrostatic <br /> D Other(Specify) <br /> Test Equipment Used:ELLDS Equipment Resolution: .0007 <br /> Sump# ) Sump# Sump# Sump# <br /> Sump Diameter: <br /> Sump Depth: 3 ' <br /> Sump Material: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: C H <br /> Height from Tank Top to Lowest �� <br /> Electrical Penetration: <br /> Condition of sump prior to testing: c-, <br /> Portion of Sump Tested' 2"above highest 2"above highest 2"above highest 2"above highest <br /> penetration penetration penetration penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both 0 Yes D No A ❑Yes DNo DNA ❑Yes ❑No ❑NA ❑Yes 0 No ❑NA <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmeEforfail-safe 0 Yes DNo B A 0 Yes 0No 0 NA 0 Yes DNo DNA D Yes DNo DNA <br /> shutdown?Was fail-safe verified DYes DNo GNA ❑Yes DNo DNA DYes DNo DNA DYes DNo DNA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: 2 : Z 's- <br /> Initial Reading(RO: v T 5 12 <br /> Test End Time: 2 1 9 3 <br /> Final Reading(RF): .. <br /> Test Duration: 15 minutes 15 minutes .. 15 minutes 15 minutes <br /> Change in Reading(RF-Ri): o Vo v v <br /> Pass/Fail Threshold or Criteria: 0.0020 0.0020 0.0020 0.0020 <br /> Test Result: `.Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail <br /> Was sensor removed for testing? JOYes DNo DNA 0 Yes DNo DNA D Yes DNo DNA 0 Yes 0 No DNA <br /> Was sensor properly replaced and .it Yes DNo DNA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA DYes DNo DNA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommendedfollow-up forfailed tests) <br /> ys`j G°' fJ a <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />